| Bill | Day & Date | Time | Location | Work Description | Affected Areas for Outages |
| 1 | Thursday, 03rd September 2026 | 9.00 am to 3.00 pm | Kg. Beribi Dalam | Relocated of Overhead Line Cable to New Pole | Spg. 122, Kg. Beribi Dalam and its surrounding areas. |
| 2 | Saturday, 05th September 2026 | 9.00 am to 3.00 pm | Kg. Bengkurong | Maintenance of Overhead Line | Spg. 66-109, Kg. Bengkurong and its surrounding areas |
| 3 | Thursday, 10th September 2026 | 9.00 am to 3.00 pm | Kg. Tarap Bau | Relocated of Overhead Line Cable | Spg. 27 Kg. Tarap Bau and its surrounding areas. |
| 4 | Thursday, 10th September 2026 | 9.00 am to 3.00 pm | Kg. Beribi Dalam | Relocated of Overhead Line Cable to New Pole | Spg. 122 Kg, Beribi Dalam and its surrounding areas. |
| 5 | Thursday, 10th September 2026 |
9.00 am to 5.00 pm (For info, Department of Electrical Services will supply temporary electricity to the affected areas through mobile generator services at the substation) |
Sub-Station Kasat/Putat #2 | Maintenance of Distribution Transformer | Kasat/Putat #2 and its surrounding areas. |
| 6 | Friday, 11th September 2026 |
9.00 am to 5.00 pm (For info, Department of Electrical Services will supply temporary electricity to the affected areas through mobile generator services at the substation)
|
Sub-Station Block 2G Bgn. Kementerian Kesihatan Jln Ong Sum Ping | Maintenance of Distribution Transformer | Block 2G Bgn. Kementerian Kesihatan Jln Ong Sum Ping and its surrounding areas. |
| 7 | Saturday, 12th September 2026 | 9.00 am to 3.00 pm | Kg. Bengkurong | Maintenance of Overhead Lines Cable | Spg. 66-109 Kg. Bengkurong and its surrounding areas. |
| 8 | Monday, 14th September 2026 | 8.00 am until works completed | Kg. Tanjong Bunut | Maintenance of Overhead Lines | Spg. 1244 to Spg. 1244-19, Kg. Tanjong Bunut and its surrounding areas. |
| 9 | Tuesday, 15th September 2026 | 9.00 am to 3.00 pm | Kg. Mangis Dua | Installation of Cable to Mini Feeder Pillar | Spg. 58, Kg. Manggis Dua and its surrounding areas. |
| 10 | Tuesday, 15th September 2026 | 8.00 am until works completed | Kg. Tanjong Bunut | Maintenance of Overhead Lines | Spg. 1244-37 to Spg. 842-102, Jalan Bukit Silat, Kg. Tanjong Bunut and its surrounding areas. |
| 11 | Wednesday, 16th September 2026 | 9.00 am to 3.00 pm | Kg. Sg. Akar | Maintenance of Overhead Lines Cable | Spg. 204-9 Kg. Sg. Akar and its surrounding areas. |
| 12 | Wednesday, 16th September 2026 | 8.00 am until works completed | Kg. Kilanas | Maintenance of Overhead Lines | Spg. 17 to Spg. 70, Jalan Bebatik Kilanas, Kg. Kilanas and its surrounding areas. |
| 13 | Thursday, 17th September 2026 | 9.00 am to 3.00 pm | Jln Kebangsaan Lama | Maintenance of Overhead Lines Cable | Spg. 570, Spg. 524 Jln Kebangsaan Lama and its surrounding areas. |
| 14 | Thursday, 17th September 2026 | 8.00 am until works completed | Kg. Kilanas | Maintenance of Overhead Lines | Spg. 93 to Spg. 117, Jalan Bebatik Kilanas, Kg. Kilanas and its surrounding areas. |
| 15 | Saturday, 19th September 2026 | 9.00 am to 3.00 pm | Kg. Kasat | Stringing of New Overhead Line Cable | Spg. 518 Kg. Kasat and its surrounding areas. |
| 16 | Saturday, 19th September 2026 |
9.00 am to 5.00 pm (For info, Department of Electrical Services will supply temporary electricity to the affected areas through mobile generator services at the substation) |
Sub-Station Bgn Block 2C Jln Ong Sum Ping | Maintenance of Distribution Transformer | Block 2C Bgn JCHS Jln Ong Sum Ping |
| 17 | Monday, 21st September 2026 | 9.00 am to 3.00 pm | Masjid Pulaie | Maintenance of Overhead Lines Cable | Spg. 78, Masjid Pulaie and its surrounding areas. |
| 18 | Monday, 21st September 2026 |
9.00 am to 5.00 pm (For info, Department of Electrical Services will supply temporary electricity to the affected areas through mobile generator services at the substation) |
Sub-Station Tungku 1 | Replacement of Ring Main Unit (RMU) | Kg. Tungku 1 and its surrounding areas. |
| 19 | Monday, 21st September 2026 | 9.00 am to 3.00 pm | Kg. Manggis Dua | Installation of Cable to Mini Feeder Pillar | Spg. 58 Kg. Manggis Dua and its surrounding areas. |
| 20 | Monday, 21st September 2026 | 9.00 am to 4.00 pm | Kg. Jangsak | Replacement of Mini Feeder Pillar (MFP) | Spg. 779, Kg. Jangsak and its surrounding areas. |
| 21 | Monday, 21st September 2026 | 8.00 am until works completed | Kg. Kilanas | Maintenance of Overhead Lines Cable | Spg. 94 to Spg. 132 Jalan Bebatik Kilanas, Kg. Kilanas and its surrounding areas. |
| 22 | Monday, 21st September 2026 | 8.00 am to 4.30 pm | Jalan Utama Berakas | Replacement of Mini Feeder Pillar (MFP) | Spg. 86, Jalan Utama Berakas and its surrounding areas. |
| 23 | Monday, 21st September 2026 | 9.00 am to 2.00 pm | Kg. Tanjung Nangka | Installation of Stay Wire for Electric Poles | Jalan Seri Pahlawan, Kg. Tanjung Nangka around after Spg. 1626-41 to Spg. 1626-206 Kg. Tanjung Nangka and its surrounding areas. |
| 24 | Monday, 21st September 2026 | 9.00 am to 12.00 noon | Kg. Kulapis | Wayleave Maintenance | Spg. 251, Kg. Kulapis and its surrounding area. |
| 25 | Tuesday, 22nd September 2026 | 9.00 am to 3.00 pm | Kg. Anggerek Desa | Maintenance of Overhead Lines Cable | Spg. 88, Kg. Anggerek Desa and its surrounding areas. |
| 26 | Tuesday, 22nd September 2026 | 8.00 am until works completed | Kg, Kilanas | Maintenance of Overhead Lines Cable | Spg. 117 to Spg. 136, Jalan Bebatik Kilanas, Kg. Kilanas and its surrounding areas. |
| 27 | Wednesday, 23rd September 2026 | 9.00 am to 3.00 pm | Kg. Delima Dua | Maintenance of Overhead Lines Cable | Spg. 94-19 Kg. Delima Dua and its surrounding areas. |
| 28 | Wednesday, 23rd September 2026 |
9.00 am to 5.00 pm (For info, Department of Electrical Services will supply temporary electricity to the affected areas through mobile generator services at the substation) |
Sub-Station Spg. 185-82-32 Kg. Katok | Replacement of Ring Main Unit (RMU) | Spg. 185-82-32 Kg. Katok and its surrounding areas. |
| 29 | Wednesday, 23rd September 2026 | 9.00 am to 12.00 noon | Kg. Kulapis | Wayleave Maintenance | Spg. 229, Kg. Kulapis and its surrounding areas. |
| 30 | Thursday, 24th September 2026 | 9.00 am to 3.00 pm | Jalan Kustin | Maintenance of Overhead Lines Cable | Jalan Kustin and its surrounding areas. |
| 31 | Thursday, 24th September 2026 |
9.00 am to 5.00 pm (For info, Department of Electrical Services will supply temporary electricity to the affected areas through mobile generator services at the substation) |
Sub-Station Spg. 185-82-32 Kg. Katok | Replacement of Ring Main Unit (RMU) | Spg. 185-82-32 Kg. Katok and its surrounding areas. |
| 32 | Thursday, 24th September 2026 | 9.00 am to 12.00 noon | Kg. Kulapis | Wayleave Maintenance | Spg. 240, Kg. Kulapis and its surrounding areas. |
| 33 | Thursday, 24th September 2026 | 8.00 am until works completed | Kg. Kilanas | Maintenance of Overhead Lines Cable | Spg. 148 to Spg. 178, Jalan Bebatik Kilanas, Kg. Kilanas and its surrounding areas. |
| 34 | Thursday, 24th September 2026 | 9.00 am to 3.00 pm | RPN Kg. Rimba | Replacement of Mini Feeder Pillar | Spg. 49-6-13, Jalan 60, RPN Kg. Rimba and its surrounding areas. |
| 35 | Thursday, 24th September 2026 | 9.00 am to 1.00 pm | Jalan Bebatik Kulapis | Maintenance of Low Voltage Overhead Line | After Spg. 121 to Spg. 240, Jln Bebatik Kulapis, Kawasan Kemajuan Pertanian Tanah Tuah and its surrounding areas. |
| 36 | Thursday, 24th September 2026 | 9.00 am to 3.00 pm | Kg. Tarap Bau | Relocated of Overhead Line Cable | Spg. 27, Kg. Tarap Bau and its surrounding areas. |
| 37 | Saturday, 26th September 2026 | 9.00 am to 3.00 pm | Kg. Bengkurong | Relocated of Overhead Line Cable | Spg. 71, Kg. Bengkurong and its surrounding areas. |
| 38 | Saturday, 26th September 2026 | 8.00 am to 6.00 pm | Jalan Bebatik Kulapis | Maintenance of Low Voltage Overhead Line | After Spg. 121 to Spg. 240, Jln Bebatik Kulapis, Kawasan Kemajuan Pertanian Tanah Tuah and its surrounding areas. |
| 39 | Monday, 28th September 2026 |
9.00 am to 5.00 pm (For info, Department of Electrical Services will supply temporary electricity to the affected areas through mobile generator services at the substation) |
Sub-Station Masjid Kg. Kapok | Maintenance of Distribution Transformer | Masjid Kg. Kapok and its surrounding areas. |
| 40 | Monday, 28th September 2026 | 9.00 am to 12.00 noon | Kg. Kulapis | Wayleave Maintenance | At the end of Spg. 99, Kg. Kulapis and its surrounding areas. |
| 41 | Monday, 28th September 2026 | 9.00 am to 12.00 noon | Kg. Kilanas | Maintenance of Overhead Lines Cable | Spg. 242 to Spg. 255, Jalan Bebatik Kilanas, Kg. Kilanas and its surrounding areas. |
| 42 | Monday, 28th September 2026 | 9.00 am to 3.00 pm | Kg. Manggis 2 | Installation of Mini Feeder Pillar | Spg. 58 Kg. Manggis 2 and its surrounding areas. |
| 43 | Tuesday, 29th September 2026 | 8.00 am until works completed | Kg. Bebatik | Maintenance of Overhead Lines Cable | Spg. 406 to Spg. 444, Jalan Mulaut, Kg. Bebatik and its surrounding areas. |
| 44 | Wednesday, 30th September 2026 |
9.00 am to 5.00 pm (For info, Department of Electrical Services will supply temporary electricity to the affected areas through mobile generator services at the substation)
|
Main Intake Station RTB Serasa | Maintenance of Distribution Transformer | Main Intake Station RTB Serasa and its surrounding areas. |
| 45 | Wednesday, 30th September 2026 | 8.00 am until works completed | Kg. Bebatik | Maintenance of Overhead Lines Cable | Spg. 21 to Spg. 36, Jalan Bebatik Kulapis, Kg. Bebatik and its surrounding areas. |
| 46 | Wednesday, 30th September 2026 | 9.00 am to 12.00 noon | Kg. Mulaut | Wayleave Maintenance | Spg. 228, Kg. Mulaut and its surrounding areas. |
OCTOBER 2026
Listed below are the designated areas for the planned maintenance work as for OCTOBER , 2026:
| Bill | Day & Date | Time | Location | Work Description | Affected Areas for Outages |
| 1 |
Thursday, 01st October 2026 |
9.00 am to 12.00 noon | Kg. Mulaut | Wayleave Maintenance | Spg. 259, Kg. Mulaut and its surrounding areas. |
| 2 |
Thursday, 01st October 2026 |
8.00 am until works completed | Kg. Bebatik | Maintenance of Overhead Lines | Spg. 37, Jalan Bebatik Kulapis, Kg. Bebatik and its surrounding areas. |
| 3 |
Thursday, 01st October 2026 |
9.00 am to 3.00 pm | Kg. Mata-Mata | Replacement of Overhead Line Cable | Spg. 74-36 Kg. Mata-Mata and its surrounding areas. |
| 4 |
Thursday, 01st October 2026
|
9.00 am to 5.00 pm (For info, Department of Electrical Services will supply temporary electricity to the affected areas through mobile generator services at the substation) |
Sub-Station Spg. 235 Jalan Jerudong | Replacement of Ring Main Unit | Spg. 235 Jalan Jerudong and its surrounding areas. |
| 5 |
Saturday, 03rd October 2026 |
9.00 am to 3.00 pm | Kg. Manggis 2 | Installation of New Mini Feeder Pillar | Spg. 58 Kg. Manggis 2 and its surrounding areas. |
| 6 |
Monday, 05th October 2026 |
9.00 am to 12.00 noon | Kg. Mulaut | Wayleave Maintenance | Spg. 353, Kg. Mulaut and its surrounding areas. |
| 7 |
Monday, 05th October 2026 |
9.00 am to 3.00 pm | Kg. Mata-Mata | Replacement of Overhead Line Cable | Spg. 74-41-6 Kg. Mata-Mata and its surrounding areas. |
| 8 |
Monday, 05th October 2026
|
9.00 am to 3.00 pm | Kg. Lambak Kanan | Replacement and Relocated of Overhead Line Cable | Spg. 57-10-32-5 Jln 64 Kg. Lambak Kanan and its surrounding areas. |
| 9 |
Monday, 05th October 2026
|
9.00 am to 4.00 pm | Kg. Perpindahan Rimba | Replacement of Mini Feeder Pillar (MFP) | Jalan 60, Simpang 21 Kg. Perpindahan Rimba and its surrounding areas. |
| 10 |
Monday, 05th October 2026
|
9.00 am to 5.00 pm (For info, Department of Electrical Services will supply temporary electricity to the affected areas through mobile generator services at the substation) |
Sub-Station Tanjung Nangka 2 | Replacement of Ring Main Unit | Tanjung Nangka 2 and its surrounding areas. |
| 11 |
Tuesday, 06th October 2026 |
9.00 am to 3.00 pm | Kg. Mata-Mata | Replacement of Overhead Line Cable | Spg. 74-41-31-17 Kg. Mata-Mata and its surrounding areas. |
| 12 |
Wednesday, 07th October 2026 |
9.00 am to 12.00 noon | Kg. Mulaut | Wayleave Maintenance | Spg. 56, Kg. Mulaut, Tanjung Nangka and its surrounding areas. |
| 13 |
Wednesday, 07th October 2026 |
9.00 am to 3.00 pm | Kg. Delima Dua | Replacement of Overhead Line Cable | Spg. 94-19 Kg. Delima Dua and its surrounding areas. |
| 14 |
Saturday, 10th October 2026 |
9.00 am to 5.00 pm | Kg. Delima Dua | Replacement of Overhead Line Cable | Spg. 95-19, Kg. Delima Dua and its surrounding areas. |
| 15 |
Sunday, 11th October 2026 |
9.00 am to 5.00 pm (For info, Department of Electrical Services will supply temporary electricity to the affected areas through mobile generator services at the substation) |
Sub-Station Baiduri Bank, Kiarong | Replacement of Ring Main Unit | Bgn. Baiduri Bank Kiarong and its surrounding areas. |
| 16 |
Monday, 12th October 2026 |
9.00 am to 5.00 pm (For info, Department of Electrical Services will supply temporary electricity to the affected areas through mobile generator services at the substation)
|
Sub-Station Mawar Desa Villa | Replacement of Ring Main Unit | Mawar Desa Villa Tanjong Nangka and its surrounding areas. |
| 17 |
Monday, 12th October 2026
|
9.00 am to 3.00 pm | Kg. Saba Darat ‘A’, Kg. Ayer | Relocated of Overhead Line Cable to New Pole | Kg. Saba Darat ‘A’, Kg. Ayer and its surrounding areas. |
| 18 |
Tuesday, 13th October 2026 |
9.00 am to 4.00 pm | Kg. Tagap Selayun | Relocated of Low Voltage Overhead Line | After Spg. 124 to Spg. 177, Kg. Tagap Selayun, Jalan Sengkurong A/B and its surrounding areas. |
| 19 |
Wednesday, 14th October 2026 |
9.00 am to 5.00 pm (For info, Department of Electrical Services will supply temporary electricity to the affected areas through mobile generator services at the substation) |
Sub-Station Fire Brigade Jerudong | Replacement of Ring Main Unit | Fire Brigade Jerudong and its surrounding areas. |
| 20 |
Wednesday, 14th October 2026 |
9.00 am to 4.00 pm | Kg. Mata-Mata | Maintenance of Underground Cable | Spg. 207-3-16, Kg. Mata-Mata Gadong and its surrounding areas. |
| 21 |
Friday, 16th October 2026 |
9.00 am to 5.00 pm (For info, Department of Electrical Services will supply temporary electricity to the affected areas through mobile generator services at the substation)
|
Sub-Station Sg. Besar #1 (Opp Klinik Sg. Besar) | Maintenance of Distribution Transformer | Spg. 51, Sekolah Rendah Sultan Abdul Bubin and its surrounding areas |
| 22 |
Saturday, 17th October 2026 |
9.00 am to 4.00 pm | Kg. Junjongan | Replacement of Mini Feeder Pillar (MFP) | No. 3 Spg. 2171-29-8, Kg. Junjongan and its surrounding areas. |
| 23 |
Monday, 19th Oktober 2026 |
9.00 am to 3.00 pm | Kg. Mulaut | Relocated of Cable by JKR | Jalan Mulaut Limau Manis, Kg. Mulaut, around before Spg. 343 downwards Spg. 300 Jln Lempaki and its surrounding areas. |
| 24 |
Tuesday, 20th October 2026 |
9.00 am to 5.00 pm (For info, Department of Electrical Services will supply temporary electricity to the affected areas through mobile generator services at the substation)
|
Sub-Station Spg. 279 Kg. Kapok | Maintenance of Distribution Transformer | Spg. 279 Kg. Kapok and its surrounding areas. |
| 25 |
Wednesday, 21st October 2026 |
9.00 am to 4.00 pm | STKRJ Kg. Mata-Mata | Replacement of Mini Feeder Pillar (MFP) | Simpang 207-3-16, STKRJ Kg. Mata-Mata and its surrounding areas. |
| 26 |
Wednesday, 21st October 2026
|
9.00 am to 4.00 pm | Kg. Sungai Besar | Replacement of Mini Feeder Pillar (MFP) | Simpang 461. Kg. Sungai Besar, Jln Kota Batu and its surrounding areas. |
| 27 |
Thursday, 22th October 2026 |
9.00 am to 5.00 pm (For info, Department of Electrical Services will supply temporary electricity to the affected areas through mobile generator services at the substation)
|
Sub-Station Spg. 361 Kg. Kapok | Maintenance of Distribution Transformer | Spg. 361 Kg. Kapok and its surrounding areas. |
| 28 |
Thursday, 22th October 2026
|
9.00 am to 4.30 pm | Kg. Tanjong Nangka | Installation of Sub DFP | Jln Jerudong Baru, Kg. Tanjung Nangka and its surrounding area. |
| 29 |
Thursday, 22th October 2026
|
9.00 am to 3.00 pm | Kg. Sg. Matan | Maintenance of Overhead Line Cable | Spg. 700 Kg. Sg. Matan and its surrounding areas. |
| 30 |
Monday, 26th October 2026 |
9.00 am to 5.00 pm (For info, Department of Electrical Services will supply temporary electricity to the affected areas through mobile generator services at the substation) |
Sub-Station Bgn. Hj Naim, Menglait | Replacement of Ring Main Unit | Bgn Hj Naim, Menglait and its surrounding areas. |
| 31 |
Tuesday, 27th October 2026 |
9.00 am to 3.00 pm | Kg. Tanjong Nangka | Jointing of Low Voltage Cable at Sub-Station | Jalan Jerudong Baru, Kg. Tanjong Nangka and its surrounding areas. |
| 32 |
Wednesday, 28th October 2026 |
9.00 am to 5.00 pm (For info, Department of Electrical Services will supply temporary electricity to the affected areas through mobile generator services at the substation) |
Sub-Station Bee Garden, Tanjong Nangka | Replacement of Ring Main Unit | Spg. 1761 Kg. Tanjong Nangka and its surrounding areas. |
NOVEMBER 2026
Listed below are the designated areas for the planned maintenance work as for NOVEMBER , 2026:
| Bill | Day & Date | Time | Location | Work Description | Affected Areas for Outages |
| 1 |
Wednesday, 04th November 2026
|
9.00 am to 5.00 pm (For info, Department of Electrical Services will supply temporary electricity to the affected areas through mobile generator services at the substation) |
S/S 162-8-18-29 Kg. Tungku | Replacement of Ring Main Unit (RMU) | Spg. 162-8-18-29 Kg. Tungku and its surrounding areas. |
| 2 |
Wednesday, 04th November 2026 |
9.00 am to 4.30 pm | Kg. Bebatik Kulapis | Maintenance and Installation of ABC Cable to Overhead Line Pole | Kg. Bebatik Kulapis and its surrounding areas. |
| 3 |
Thursday, 05th November 2026 |
9.00 am to 4.30 pm | Kg. Bebatik Kulapis | Maintenance and Installation of ABC Cable to Overhead Line Pole | Kg. Bebatik Kulapis and its surrounding areas. |
| 4 |
Thursday, 05th November 2026 |
9.00 am to 4.00 pm | Kg. Junjongan | Replacement of Mini Feeder Pillar (MFP) | Spg. 2171, Kg. Junjongan and its surrounding areas. |
| 5 |
Thursday, 05th November 2026 |
9.00 am to 4.00 pm | Jalan Bebatik Kilanas | Replacement of Mini Feeder Pillar (MFP) | Spg. 200, Jalan Bebatik Kilanas and its surrounding areas. |
| 6 |
Monday, 09th November 2026 |
9.00 am to 5.00 pm (For info, Department of Electrical Services will supply temporary electricity to the affected areas through mobile generator services at the substation) |
S/S Spg. 705 Kg. Sg. Buloh | Replacement of Ring Main Unit | Spg. 705 Kg. Sg. Buloh and its surrounding areas. |
| 7 |
Thursday, 12th November 2026 |
9.00 am to 5.00 pm (For info, Department of Electrical Services will supply temporary electricity to the affected areas through mobile generator services at the substation)
|
S/S Kompleks Hj Daud Gadong | Maintenance of Distribution Transformer | Kompleks Hj Daud Gadong and its surrounding areas. |
| 8 |
Thursday, 19th Nvember 2026 |
9.00 am to 4.00 pm | Kg. Tamoi | Relocate of Overhead Line Cable to New Pole | Kg. Tamoi and its surrounding areas. |
| 9 |
Friday, 20th November 2026 |
9.00 am to 5.00 pm (For info, Department of Electrical Services will supply temporary electricity to the affected areas through mobile generator services at the substation)
|
S/S Mulaut Lampaki | Maintenance of Distribution Transformer | Jalan Kecil Mulaut Lampaki and its surrounding areas. |
| 10 |
Sunday, 22nd November 2026 |
9.00 am to 4.00 pm | Sek. Tinggi Arab Laki-Laki Hassanal Bolkiah | Replacement of Distribution Feeder Pillar | Sek. Tinggi Arab Laki-Laki Hassanal Bolkiah, Jln Pehin Dato Menteri Sheikh Hj Abd Rahman and its surrounding areas. |
| 11 |
Wednesday, 24th November 2026 |
9.00 am to 4.00 pm | Kg. Subok | Replacement of Mini Feeder Pillar | Spg. 339-13-19, Kg. Subok and its surrounding areas |
| 12 |
Wednesday, 24th November 2026
|
9.00 am to 4.00 pm | Kg. Mata-Mata | Replacement of Mini Feeder Pillar | Spg. 52-74, Kg. Mata-Mata, Gadong and its surrounding areas. |
| 13 |
Wednesday, 25th November 2026 |
9.00 am to 4.00 pm | Jalan Pasir Berakas | Replacement of Distribution Feeder Pillar 800Amp | Spg. 225 Jalan Pasir Berakas and its surrounding areas. |
| 14 |
Saturday, 28th November 2026 |
9.00 am to 5.00 pm | Jalan Elizabeth 2 | Replacement of Distribution Feeder Pillar 600Amp | Jalan Elizabeth 2 and its surrounding areas. |
| 15 |
Monday, 30th November 2026 |
9.00 am to 4.00 pm | Kg. Rimba | Replacement of Distribution Feeder Pillar 1200Amp | Spg. 256-45-26 Kg. Rimba and its surrounding areas. |
DECEMBER 2026
Listed below are the designated areas for the planned maintenance work as for DECEMBER , 2026:
| Bill | Day & Date | Time | Location | Work Description | Affected Areas for Outages |
| 1 | |||||
| 2 | |||||
TUTONG DISTRICT
SEPTEMBER 2026
Listed below are the designated areas for the planned maintenance work as for SEPTEMBER, 2026:
| BILL | DAY & DATE | TIME | LOCATION | WORK DESCRIPTION | AFFECTED AREAS OF OUTRAGE |
| 1 | Tuesday, 1st September 2026 | 08:00 until finished | Kg Bukit, Tutong | Rectification of PD at Substation Kg Bukit #2 | A part of Kg Ukong Tutong |
| 2 | Wednesday, 2nd September 2026 | 08:00 until finished | Kg Merimbun, Tutong | Rectification of PD at Substation Kg Merimbun | A part of Kg Merimbun, Tutong |
| 3 | Thursday, 03rd September 2026 | 08:00 until finished | Kg Pengkalan Piasau Tutong | Maintenance of Distribution Transformer (TX) at Substation Pengkalan Piasau | A part of Kg Pengkalan Piasau and surrounding areas |
| 4 | Monday, 07th September 2026 | 08:00 until finished | Jalan Binturan Kem | Maintenance of 11 000 k V Electrical equipment at Substation Package Unit Huighway #2, Binturan Kem | A part of Kg Bukit Panggal |
| 5 | Saturday, 12th September 2026 | 08:00 until finished | Kg Bukit Udal Tutong | Maintenance of Distribution Transformer (TX) at Substation Bukit Udal #2 | A part of Kg Bukit Udal and surrounding areas |
| 6 | Tuesday, 15th September 2026 | 08:00 until finished | Kg Bekiau | Replacement work of the 11,000 overhead line at Jalan Kecil Bekiau. | A part of Kg Bekiau |
| 7 | Wednesday, 16th September 2026 | 08:00 until finished | Kg Bekiau | Replacement work of the 11,000 overhead line at Jalan Kecil Bekiau. | A part of Kg Bekiau |
| 8 | Thursday, 17th September 2026 | 08:00 until finished | Kg Bekiau | Replacement work of the 11,000 overhead line at Jalan Kecil Bekiau. | A part of Kg Bekiau |
| 9 | Thursday, 17th September 2026 | 08:00 until finished | Kg Luagan Timbaran | Replacement of Distribution Feeder Pillar (DFP) at Substation Luagan Timbaran | From Spg 142 to Spg 158 and surrounding areas. |
| 10 | Friday, 18th September 2026 | 08:00 until finished | Kg Bekiau | Replacement work of the 11,000 overhead line at Jalan Kecil Bekiau. | A part of Kg Bekiau |
| 11 | Saturday, 19th September 2026 | 08:00 until finished | Kg Bekiau | Replacement work of the 11,000 overhead line at Jalan Kecil Bekiau. | A part of Kg Bekiau |
| 12 | Sunday, 20th September 2026 | 08:00 until finished | Kg Bekiau | Replacement work of the 11,000 overhead line at Jalan Kecil Bekiau. | A part of Kg Bekiau |
| 13 | Monday, 21st September 2026 | 08:00 until finished | Kg Bekiau | Replacement work of the 11,000 overhead line at Jalan Kecil Bekiau. | A part of Kg Bekiau |
| 14 | Tuesday, 22nd September 2026 | 08:00 until finished | Kg Bekiau | Replacement work of the 11,000 overhead line at Jalan Kecil Bekiau. | A part of Kg Bekiau |
| 15 | Wednesday, 23rd September 2026 | 08:00 until finished | Kg Bekiau | Replacement work of the 11,000 overhead line at Jalan Kecil Bekiau. | A part of Kg Bekiau |
| 16 | Thursday, 24th September 2026 | 08:00 until finished | Kg Bukit Sulang Tutong | Maintenance of Distribution Transformer (TX) at Substation Spg 3 Bukit Sulang | A part of Kg Bukit Sulang and surrounding areas |
| 17 | Thursday, 24th September 2026 | 08:00 until finished | Kg Bekiau | Replacement work of the 11,000 overhead line at Jalan Kecil Bekiau. | A part of Kg Bekiau |
| 18 | Friday, 25th September 2026 | 08:00 until finished | Kg Bekiau | Replacement work of the 11,000 overhead line at Jalan Kecil Bekiau. | A part of Kg Bekiau |
| 19 | Saturday, 26th September 2026 | 08:00 until finished | Kg Bekiau | Replacement work of the 11,000 overhead line at Jalan Kecil Bekiau. | A part of Kg Bekiau |
| 20 | Sunday, 27th September 2026 | 08:00 until finished | Kg Bekiau | Replacement work of the 11,000 overhead line at Jalan Kecil Bekiau. | A part of Kg Bekiau |
| 21 | Monday, 28th September 2026 | 08:00 until finished | Kg Bekiau | Replacement work of the 11,000 overhead line at Jalan Kecil Bekiau. | A part of Kg Bekiau |
| 22 | Tuesday, 29th September 2026 | 08:00 until finished | Kg Bukit Tutong | Maintenance of Distribution Transformer (TX) at Substation Kg Bukit #3 | A part of Kg Bukit and surrounding areas |
| 23 | Tuesday, 29th September 2026 | 08:00 until finished | Kg Bekiau | Replacement work of the 11,000 overhead line at Jalan Kecil Bekiau. | A part of Kg Bekiau |
| 24 | Wednesday, 30th September 2026 | 08:00 until finished | Kg Bekiau | Replacement work of the 11,000 overhead line at Jalan Kecil Bekiau. | A part of Kg Bekiau |
OCTOBER 2026
Listed below are the designated areas for the planned maintenance work as for OCTOBER, 2026:
| BILL | DAY & DATE | TIME | LOCATION | WORK DESCRIPTION | AFFECTED AREAS OF OUTRAGE |
| 1 | Thursday, 08th October 2026 | 09:00am until 16:30pm | Kg Serambangun | Maintenance Distribution Transformer (TX) at Substation Hj Junaidi Serambangun | A part of Kg Serambangun |
| 2 | Thursday, 15th October 2026 | 09:00am until 16:30pm | Kg Mungkom Dalam | Maintenance Distribution Transformer (TX) at Substation Mungkom Dalam | A part of Kg Mungkom Dalam |
| 3 | Saturday, 17th October 2026 | 09:00am until 16:30pm | Kg Bukit Sulang | Maintenance Distribution Transformer (TX) at Substation Spg 3 Bukit Sulang |
A part of Kg Bukit Sulang |
| 4 | Thursday, 24th October 2026 | 09:00am until 16:30pm | Kg Long Mayan | Maintenance Distribution Transformer (TX) at Substation Long Mayan #3 | A part of Kg Long Mayan |
| 5 | Thursday, 29th October 2026 | 09:00am until 16:30pm | Kg Bukit Udal | Maintenance Distribution Transformer (TX) at Substation Bukit Udal #1 | A part of Bukit Udal |
NOVEMBER 2026
Listed below are the designated areas for the planned maintenance work as for NOVEMBER, 2026:
| BILL | DAY & DATE | TIME | LOCATION | WORK DESCRIPTION | AFFECTED AREAS OF OUTRAGE |
| 1 | Monday, 2nd November 2026 | 08:30 until work completed | Kg Pengkalan Mau and Kg Kiudang, Mukim Kiudang, Tutong | Replacement of 11kV Aerial Cable | Kg Pengkalan Mau (partially) and Kg Kiudang (partially), Mukim Kiudang, Tutong |
| 2 | Tuesday, 3rd November 2026 | 08:30 until work completed | Kg Pengkalan Mau and Kg Kiudang, Mukim Kiudang, Tutong | Replacement of 11kV Aerial Cable | Kg Pengkalan Mau (partially) and Kg Kiudang (partially), Mukim Kiudang, Tutong |
| 3 | Wednesday, 4th November 2026 | 08:30 until work completed | Kg Pengkalan Mau and Kg Kiudang, Mukim Kiudang, Tutong | Replacement of 11kV Aerial Cable | Kg Pengkalan Mau (partially) and Kg Kiudang (partially), Mukim Kiudang, Tutong |
| 4 | Thursday, 5th November 2026 | 08:30 until work completed | Kg Pengkalan Mau and Kg Kiudang, Mukim Kiudang, Tutong | Replacement of 11kV Aerial Cable | Kg Pengkalan Mau (partially) and Kg Kiudang (partially), Mukim Kiudang, Tutong |
| 5 | Saturday, 7th November 2026 | 08:30 until work completed | Kg Pengkalan Mau and Kg Kiudang, Mukim Kiudang, Tutong | Replacement of 11kV Aerial Cable | Kg Pengkalan Mau (partially) and Kg Kiudang (partially), Mukim Kiudang, Tutong |
| 6 | Monday, 9th November 2026 | 08:30 until work completed | Kg Pengkalan Mau and Kg Kiudang, Mukim Kiudang, Tutong | Replacement of 11kV Aerial Cable | Kg Pengkalan Mau (partially) and Kg Kiudang (partially), Mukim Kiudang, Tutong |
| 7 | Tuesday, 10th November 2026 | 08:30 until work completed | Kg Pengkalan Mau and Kg Kiudang, Mukim Kiudang, Tutong | Replacement of 11kV Aerial Cable | Kg Pengkalan Mau (partially) and Kg Kiudang (partially), Mukim Kiudang, Tutong |
| 8 | Wednesday, 11th November 2026 | 08:30 until work completed | Kg Pengkalan Mau and Kg Kiudang, Mukim Kiudang, Tutong | Replacement of 11kV Aerial Cable | Kg Pengkalan Mau (partially) and Kg Kiudang (partially), Mukim Kiudang, Tutong |
| 9 | Thursday, 12th November 2026 | 08:30 until work completed | Kg Pengkalan Mau and Kg Kiudang, Mukim Kiudang, Tutong | Replacement of 11kV Aerial Cable | Kg Pengkalan Mau (partially) and Kg Kiudang (partially), Mukim Kiudang, Tutong |
| 10 | Saturday, 14th November 2026 | 08:30 until work completed | Kg Pengkalan Mau and Kg Kiudang, Mukim Kiudang, Tutong | Replacement of 11kV Aerial Cable | Kg Pengkalan Mau (partially) and Kg Kiudang (partially), Mukim Kiudang, Tutong |
| 11 | Monday, 16th November 2026 | 08:30 until work completed | Kg Pengkalan Mau and Kg Kiudang, Mukim Kiudang, Tutong | Replacement of 11kV Aerial Cable | Kg Pengkalan Mau (partially) and Kg Kiudang (partially), Mukim Kiudang, Tutong |
| 12 | Tuesday, 17th November 2026 | 08:30 until work completed | Kg Pengkalan Mau and Kg Kiudang, Mukim Kiudang, Tutong | Replacement of 11kV Aerial Cable | Kg Pengkalan Mau (partially) and Kg Kiudang (partially), Mukim Kiudang, Tutong |
| 13 | Wednesday, 18th November 2026 | 08:30 until work completed | Kg Pengkalan Mau and Kg Kiudang, Mukim Kiudang, Tutong | Replacement of 11kV Aerial Cable | Kg Pengkalan Mau (partially) and Kg Kiudang (partially), Mukim Kiudang, Tutong |
| 14 | Thurday, 19th November 2026 | 08:30 until work completed | Kg Pengkalan Mau and Kg Kiudang, Mukim Kiudang, Tutong | Replacement of 11kV Aerial Cable | Kg Pengkalan Mau (partially) and Kg Kiudang (partially), Mukim Kiudang, Tutong |
| 15 | Saturday, 21st November 2026 | 08:30 until work completed | Kg Pengkalan Mau and Kg Kiudang, Mukim Kiudang, Tutong | Replacement of 11kV Aerial Cable | Kg Pengkalan Mau (partially) and Kg Kiudang (partially), Mukim Kiudang, Tutong |
| 16 | Monday, 23rd November 2026 | 08:30 until work completed | Kg Pengkalan Mau and Kg Kiudang, Mukim Kiudang, Tutong | Replacement of 11kV Aerial Cable | Kg Pengkalan Mau (partially) and Kg Kiudang (partially), Mukim Kiudang, Tutong |
| 17 | Tuesday, 24th November 2026 | 08:30 until work completed | Kg Pengkalan Mau and Kg Kiudang, Mukim Kiudang, Tutong | Replacement of 11kV Aerial Cable | Kg Pengkalan Mau (partially) and Kg Kiudang (partially), Mukim Kiudang, Tutong |
| 18 | Wednesday, 25th November 2026 | 08:30 until work completed | Kg Pengkalan Mau and Kg Kiudang, Mukim Kiudang, Tutong | Replacement of 11kV Aerial Cable | Kg Pengkalan Mau (partially) and Kg Kiudang (partially), Mukim Kiudang, Tutong |
| 19 | Thursday, 26th November 2026 | 08:30 until work completed | Kg Pengkalan Mau and Kg Kiudang, Mukim Kiudang, Tutong | Replacement of 11kV Aerial Cable | Kg Pengkalan Mau (partially) and Kg Kiudang (partially), Mukim Kiudang, Tutong |
| 20 | Saturday, 28th November 2026 | 08:30 until work completed | Kg Pengkalan Mau and Kg Kiudang, Mukim Kiudang, Tutong | Replacement of 11kV Aerial Cable | Kg Pengkalan Mau (partially) and Kg Kiudang (partially), Mukim Kiudang, Tutong |
| 21 | Monday, 30th November 2026 | 08:30 until work completed | Kg Pengkalan Mau and Kg Kiudang, Mukim Kiudang, Tutong | Replacement of 11kV Aerial Cable | Kg Pengkalan Mau (partially) and Kg Kiudang (partially), Mukim Kiudang, Tutong |
| 22 | Wednesday, 4th November 2026 | 09:00 until 04:30 | Kg Pengkalan Piasau, Mukim Ukong, Tutong | Replacement of RMU | Kg Pengkalan Piasau (partially), Mukim Ukong, Tutong |
| 23 | Thursday, 5th November 2026 | 09:00 until 04:30 | Kg Ikas Bandung, Mukim Keriam, Tutong | TX Maintenance | Kg Ikas Bandung (partially), Mukim Keriam, Tutong |
| 24 | Wednesday, 11th November 2026 | 09:00 until 04:30 | Kg Bukit, Mukim Ukong Tutong | TX Maintenance | Kg Bukit (partially), Mukim Ukong Tutong |
| 25 | Monday, 16th November 2026 | 08:30 until work completed | Spg 142, 150, 158 and 162, Kg Luagan Timbaran, Mukim Kiudang, Tutong | Replacement of 11kV Aerial Cable | Spg 142, 150, 158 and 162, Kg Luagan Timbaran, Mukim Kiudang, Tutong. |
| 26 | Tuesday, 17th November 2026 | 08:30 until work completed | Spg 142, 150, 158 and 162, Kg Luagan Timbaran, Mukim Kiudang, Tutong | Replacement of 11kV Aerial Cable | Spg 142, 150, 158 and 162, Kg Luagan Timbaran, Mukim Kiudang, Tutong. |
| 27 | Wednesday, 18th November 2026 | 08:30 until work completed | Spg 142, 150, 158 and 162, Kg Luagan Timbaran, Mukim Kiudang, Tutong | Replacement of 11kV Aerial Cable | Spg 142, 150, 158 and 162, Kg Luagan Timbaran, Mukim Kiudang, Tutong. |
| 28 | Thursday, 19th November 2026 | 08:30 until work completed | Spg 142, 150, 158 and 162, Kg Luagan Timbaran, Mukim Kiudang, Tutong | Replacement of 11kV Aerial Cable | Spg 142, 150, 158 and 162, Kg Luagan Timbaran, Mukim Kiudang, Tutong. |
| 29 | Saturday, 21st November 2026 | 08:30 until work completed | Spg 142, 150, 158 and 162, Kg Luagan Timbaran, Mukim Kiudang, Tutong | Replacement of 11kV Aerial Cable | Spg 142, 150, 158 and 162, Kg Luagan Timbaran, Mukim Kiudang, Tutong. |
| 30 | Tuesday, 24th November 2026 | 08:30 until work completed | Kg Birau, Mukim Kiudang, Tutong | Replacement of 11kV Aerial Cable | Kg Birau (partially), Mukim Kiudang, Tutong |
| 31 | Wednesday, 25th November 2026 | 08:30 until work completed | Kg Birau, Mukim Kiudang, Tutong | Replacement of 11kV Aerial Cable | Kg Birau (partially), Mukim Kiudang, Tutong |
| 32 | Wednesday, 25th November 2026 | 09:00 to 16:30 | Bangunan Masjid Hassanal Bolkiah, Tutong dan kawasan sekitarnya | TX Maintenance | Bangunan Masjid Hassanal Bolkiah, Tutong dan kawasan sekitarnya |
| 33 | Thursday, 26th November 2026 | 08:30 until work completed | Kg Birau, Mukim Kiudang, Tutong | Replacement of 11kV Aerial Cable | Kg Birau (partially), Mukim Kiudang, Tutong |
| 34 | Saturday, 28th November 2026 | 08:30 until work completed | Kg Birau, Mukim Kiudang, Tutong | Replacement of 11kV Aerial Cable | Kg Birau (partially), Mukim Kiudang, Tutong |
| 35 | Monday, 30th November 2026 | 08:30 until work completed | Kg Padnunok and Kg Birau, Mukim Kiudang, Tutong | Replacement of 11kV Aerial Cable | Kg Padnunok (partially) and Kg Birau (partially), Mukim Kiudang, Tutong |
| 36 | Monday, 30th November 2026 | 08:30 until work completed | Kg Kebia and Kg Pengkalan Mau, Mukim Kiudang, Tutong | Replacement of 11kV Aerial Cable | Kg Kebia (partially) and Kg Pengkalan Mau (partially), Mukim Kiudang, Tutong |
| 37 | Monday, 30th November 2026 | 08:30 until work completed | Kg Batang Mitus, Mukim Kiudang, Tutong | Replacement of 11kV Aerial Cable | Kg Batang Mitus (partially), Mukim Kiudang, Tutong |
DECEMBER 2026
Listed below are the designated areas for the planned maintenance work as for DECEMBER, 2026:
| BILL | DAY & DATE | TIME | LOCATION | WORK DESCRIPTION | AFFECTED AREAS OF OUTRAGE |
| 1 | Tuesday, 1st December 2026 | 08:30 until work completed | Kg Padnunok and Kg Birau, Mukim Kiudang, Tutong | Replacement of 11kV Aerial Cable | Kg Padnunok (partially) and Kg Birau (partially), Mukim Kiudang, Tutong |
| 2 | Tuesday, 1st December 2026 | 08:30 until work completed | Kg Kebia and Kg Pengkalan Mau, Mukim Kiudang, Tutong | Replacement of 11kV Aerial Cable | Kg Kebia (partially) and Kg Pengkalan Mau (partially), Mukim Kiudang, Tutong |
| 3 | Tuesday, 1st December 2026 | 08:30 until work completed | Kg Batang Mitus, Mukim Kiudang, Tutong | Replacement of 11kV Aerial Cable | Kg Batang Mitus (partially), Mukim Kiudang, Tutong |
| 4 | Wednesday, 2nd December 2026 | 08:30 until work completed | Kg Padnunok and Kg Birau, Mukim Kiudang, Tutong | Replacement of 11kV Aerial Cable | Kg Padnunok (partially) and Kg Birau (partially), Mukim Kiudang, Tutong |
| 5 | Wednesday, 2nd December 2026 | 08:30 until work completed | Kg Kebia and Kg Pengkalan Mau, Mukim Kiudang, Tutong | Replacement of 11kV Aerial Cable | Kg Kebia (partially) and Kg Pengkalan Mau (partially), Mukim Kiudang, Tutong |
| 6 | Wednesday, 2nd December 2026 | 08:30 until work completed | Kg Batang Mitus, Mukim Kiudang, Tutong | Replacement of 11kV Aerial Cable | Kg Batang Mitus (partially), Mukim Kiudang, Tutong |
| 7 | Thursday, 3rd December 2026 | 08:30 until work completed | Kg Padnunok and Kg Birau, Mukim Kiudang, Tutong | Replacement of 11kV Aerial Cable | Kg Padnunok (partially) and Kg Birau (partially), Mukim Kiudang, Tutong |
| 8 | Thursday, 3rd December 2026 | 08:30 until work completed | Kg Kebia and Kg Pengkalan Mau, Mukim Kiudang, Tutong | Replacement of 11kV Aerial Cable | Kg Kebia (partially) and Kg Pengkalan Mau (partially), Mukim Kiudang, Tutong |
| 9 | Thursday, 3rd December 2026 | 08:30 until work completed | Kg Batang Mitus, Mukim Kiudang, Tutong | Replacement of 11kV Aerial Cable | Kg Batang Mitus (partially), Mukim Kiudang, Tutong |
| 10 | Saturday, 5th December 2026 | 08:30 until work completed | Kg Padnunok and Kg Birau, Mukim Kiudang, Tutong | Replacement of 11kV Aerial Cable | Kg Padnunok (partially) and Kg Birau (partially), Mukim Kiudang, Tutong |
| 11 | Saturday, 5th December 2026 | 08:30 until work completed | Kg Kebia and Kg Pengkalan Mau, Mukim Kiudang, Tutong | Replacement of 11kV Aerial Cable | Kg Kebia (partially) and Kg Pengkalan Mau (partially), Mukim Kiudang, Tutong |
| 12 | Saturday, 5th December 2026 | 08:30 until work completed | Kg Batang Mitus, Mukim Kiudang, Tutong | Replacement of 11kV Aerial Cable | Kg Batang Mitus (partially), Mukim Kiudang, Tutong |
| 13 | Monday, 7th December 2026 | 08:30 until work completed | Kg Padnunok and Kg Birau, Mukim Kiudang, Tutong | Replacement of 11kV Aerial Cable | Kg Padnunok (partially) and Kg Birau (partially), Mukim Kiudang, Tutong |
| 14 | Monday, 7th December 2026 | 08:30 until work completed | Kg Kebia and Kg Pengkalan Mau, Mukim Kiudang, Tutong | Replacement of 11kV Aerial Cable | Kg Kebia (partially) and Kg Pengkalan Mau (partially), Mukim Kiudang, Tutong |
| 15 | Monday, 7th December 2026 | 08:30 until work completed | Kg Batang Mitus, Mukim Kiudang, Tutong | Replacement of 11kV Aerial Cable | Kg Batang Mitus (partially), Mukim Kiudang, Tutong |
| 16 | Tuesday, 8th December 2026 | 08:30 until work completed | Kg Padnunok and Kg Birau, Mukim Kiudang, Tutong | Replacement of 11kV Aerial Cable | Kg Padnunok (partially) and Kg Birau (partially), Mukim Kiudang, Tutong |
| 17 | Tuesday, 8th December 2026 | 08:30 until work completed | Kg Kebia and Kg Pengkalan Mau, Mukim Kiudang, Tutong | Replacement of 11kV Aerial Cable | Kg Kebia (partially) and Kg Pengkalan Mau (partially), Mukim Kiudang, Tutong |
| 18 | Tuesday, 8th December 2026 | 08:30 until work completed | Kg Batang Mitus, Mukim Kiudang, Tutong | Replacement of 11kV Aerial Cable | Kg Batang Mitus (partially), Mukim Kiudang, Tutong |
| 19 | Wednesday, 9th December 2026 | 08:30 until work completed | Kg Padnunok and Kg Birau, Mukim Kiudang, Tutong | Replacement of 11kV Aerial Cable | Kg Padnunok (partially) and Kg Birau (partially), Mukim Kiudang, Tutong |
| 20 | Wednesday, 9th December 2026 | 08:30 until work completed | Kg Kebia and Kg Pengkalan Mau, Mukim Kiudang, Tutong | Replacement of 11kV Aerial Cable | Kg Kebia (partially) and Kg Pengkalan Mau (partially), Mukim Kiudang, Tutong |
| 21 | Wednesday, 9th December 2026 | 08:30 until work completed | Kg Batang Mitus, Mukim Kiudang, Tutong | Replacement of 11kV Aerial Cable | Kg Batang Mitus (partially), Mukim Kiudang, Tutong |
| 22 | Thursday, 10th December 2026 | 08:30 until work completed | Kg Padnunok and Kg Birau, Mukim Kiudang, Tutong | Replacement of 11kV Aerial Cable | Kg Padnunok (partially) and Kg Birau (partially), Mukim Kiudang, Tutong |
| 23 | Thursday, 10th December 2026 | 08:30 until work completed | Kg Kebia and Kg Pengkalan Mau, Mukim Kiudang, Tutong | Replacement of 11kV Aerial Cable | Kg Kebia (partially) and Kg Pengkalan Mau (partially), Mukim Kiudang, Tutong |
| 24 | Thursday, 10th December 2026 | 08:30 until work completed | Kg Batang Mitus, Mukim Kiudang, Tutong | Replacement of 11kV Aerial Cable | Kg Batang Mitus (partially), Mukim Kiudang, Tutong |
| 25 | Saturday, 12th December 2026 | 08:30 until work completed | Kg Padnunok and Kg Birau, Mukim Kiudang, Tutong | Replacement of 11kV Aerial Cable | Kg Padnunok (partially) and Kg Birau (partially), Mukim Kiudang, Tutong |
| 26 | Saturday, 12th December 2026 | 08:30 until work completed | Kg Kebia and Kg Pengkalan Mau, Mukim Kiudang, Tutong | Replacement of 11kV Aerial Cable | Kg Kebia (partially) and Kg Pengkalan Mau (partially), Mukim Kiudang, Tutong |
| 27 | Saturday, 12th December 2026 | 08:30 until work completed | Kg Batang Mitus, Mukim Kiudang, Tutong | Replacement of 11kV Aerial Cable | Kg Batang Mitus (partially), Mukim Kiudang, Tutong |
| 28 | Monday, 14th December 2026 | 08:30 until work completed | Kg Padnunok and Kg Birau, Mukim Kiudang, Tutong | Replacement of 11kV Aerial Cable | Kg Padnunok (partially) and Kg Birau (partially), Mukim Kiudang, Tutong |
| 29 | Monday, 14th December 2026 | 08:30 until work completed | Kg Kebia and Kg Pengkalan Mau, Mukim Kiudang, Tutong | Replacement of 11kV Aerial Cable | Kg Kebia (partially) and Kg Pengkalan Mau (partially), Mukim Kiudang, Tutong |
| 30 | Monday, 14th December 2026 | 08:30 until work completed | Kg Batang Mitus, Mukim Kiudang, Tutong | Replacement of 11kV Aerial Cable | Kg Batang Mitus (partially), Mukim Kiudang, Tutong |
| 31 | Tuesday, 15th December 2026 | 08:30 until work completed | Kg Padnunok and Kg Birau, Mukim Kiudang, Tutong | Replacement of 11kV Aerial Cable | Kg Padnunok (partially) and Kg Birau (partially), Mukim Kiudang, Tutong |
| 32 | Tuesday, 15th December 2026 | 08:30 until work completed | Kg Kebia and Kg Pengkalan Mau, Mukim Kiudang, Tutong | Replacement of 11kV Aerial Cable | Kg Kebia (partially) and Kg Pengkalan Mau (partially), Mukim Kiudang, Tutong |
| 33 | Tuesday, 15th December 2026 | 08:30 until work completed | Kg Batang Mitus, Mukim Kiudang, Tutong | Replacement of 11kV Aerial Cable | Kg Batang Mitus (partially), Mukim Kiudang, Tutong |
| 34 | Wednesday, 16th December 2026 | 08:30 until work completed | Kg Padnunok and Kg Birau, Mukim Kiudang, Tutong | Replacement of 11kV Aerial Cable | Kg Padnunok (partially) and Kg Birau (partially), Mukim Kiudang, Tutong |
| 35 | Wednesday, 16th December 2026 | 08:30 until work completed | Kg Kebia and Kg Pengkalan Mau, Mukim Kiudang, Tutong | Replacement of 11kV Aerial Cable | Kg Kebia (partially) and Kg Pengkalan Mau (partially), Mukim Kiudang, Tutong |
| 36 | Wednesday, 16th December 2026 | 08:30 until work completed | Kg Batang Mitus, Mukim Kiudang, Tutong | Replacement of 11kV Aerial Cable | Kg Batang Mitus (partially), Mukim Kiudang, Tutong |
| 37 | Thursday, 17th December 2026 | 08:30 until work completed | Kg Padnunok and Kg Birau, Mukim Kiudang, Tutong | Replacement of 11kV Aerial Cable | Kg Padnunok (partially) and Kg Birau (partially), Mukim Kiudang, Tutong |
| 38 | Thursday, 17th December 2026 | 08:30 until work completed | Kg Kebia and Kg Pengkalan Mau, Mukim Kiudang, Tutong | Replacement of 11kV Aerial Cable | Kg Kebia (partially) and Kg Pengkalan Mau (partially), Mukim Kiudang, Tutong |
| 39 | Thursday, 17th December 2026 | 08:30 until work completed | Kg Batang Mitus, Mukim Kiudang, Tutong | Replacement of 11kV Aerial Cable | Kg Batang Mitus (partially), Mukim Kiudang, Tutong |
| 40 | Saturday, 19th December 2026 | 08:30 until work completed | Kg Padnunok and Kg Birau, Mukim Kiudang, Tutong | Replacement of 11kV Aerial Cable | Kg Padnunok (partially) and Kg Birau (partially), Mukim Kiudang, Tutong |
| 41 | Saturday, 19th December 2026 | 08:30 until work completed | Kg Kebia and Kg Pengkalan Mau, Mukim Kiudang, Tutong | Replacement of 11kV Aerial Cable | Kg Kebia (partially) and Kg Pengkalan Mau (partially), Mukim Kiudang, Tutong |
| 42 | Saturday, 19th December 2026 | 08:30 until work completed | Kg Batang Mitus, Mukim Kiudang, Tutong | Replacement of 11kV Aerial Cable | Kg Batang Mitus (partially), Mukim Kiudang, Tutong |
| 43 | Monday, 21st December 2026 | 08:30 until work completed | Kg Kebia and Kg Pengkalan Mau, Mukim Kiudang, Tutong | Replacement of 11kV Aerial Cable | Kg Kebia (partially) and Kg Pengkalan Mau (partially), Mukim Kiudang, Tutong |
| 44 | Monday, 21st December 2026 | 08:30 until work completed | Kg Batang Mitus, Mukim Kiudang, Tutong | Replacement of 11kV Aerial Cable | Kg Batang Mitus (partially), Mukim Kiudang, Tutong |
| 45 | Tuesday, 22nd December 2026 | 08:30 until work completed | Kg Kebia and Kg Pengkalan Mau, Mukim Kiudang, Tutong | Replacement of 11kV Aerial Cable | Kg Kebia (partially) and Kg Pengkalan Mau (partially), Mukim Kiudang, Tutong |
| 46 | Tuesday, 22nd December 2026 | 08:30 until work completed | Kg Batang Mitus, Mukim Kiudang, Tutong | Replacement of 11kV Aerial Cable | Kg Batang Mitus (partially), Mukim Kiudang, Tutong |
| 47 | Wednesday, 23rd December 2026 | 08:30 until work completed | Kg Kebia and Kg Pengkalan Mau, Mukim Kiudang, Tutong | Replacement of 11kV Aerial Cable | Kg Kebia (partially) and Kg Pengkalan Mau (partially), Mukim Kiudang, Tutong |
| 48 | Wednesday, 23rd December 2026 | 08:30 until work completed | Kg Batang Mitus, Mukim Kiudang, Tutong | Replacement of 11kV Aerial Cable | Kg Batang Mitus (partially), Mukim Kiudang, Tutong |
| 49 | Thursday, 24th December 2026 | 08:30 until work completed | Kg Kebia and Kg Pengkalan Mau, Mukim Kiudang, Tutong | Replacement of 11kV Aerial Cable | Kg Kebia (partially) and Kg Pengkalan Mau (partially), Mukim Kiudang, Tutong |
| 50 | Thursday, 24th December 2026 | 08:30 until work completed | Kg Batang Mitus, Mukim Kiudang, Tutong | Replacement of 11kV Aerial Cable | Kg Batang Mitus (partially), Mukim Kiudang, Tutong |
| 51 | Saturday, 26th December 2026 | 08:30 until work completed | Kg Kebia and Kg Pengkalan Mau, Mukim Kiudang, Tutong | Replacement of 11kV Aerial Cable | Kg Kebia (partially) and Kg Pengkalan Mau (partially), Mukim Kiudang, Tutong |
| 52 | Saturday, 26th December 2026 | 08:30 until work completed | Kg Batang Mitus, Mukim Kiudang, Tutong | Replacement of 11kV Aerial Cable | Kg Batang Mitus (partially), Mukim Kiudang, Tutong |
| 53 | Monday, 28th December 2026 | 08:30 until work completed | Kg Kebia and Kg Pengkalan Mau, Mukim Kiudang, Tutong | Replacement of 11kV Aerial Cable | Kg Kebia (partially) and Kg Pengkalan Mau (partially), Mukim Kiudang, Tutong |
| 54 | Monday, 28th December 2026 | 08:30 until work completed | Kg Batang Mitus, Mukim Kiudang, Tutong | Replacement of 11kV Aerial Cable | Kg Batang Mitus (partially), Mukim Kiudang, Tutong |
| 55 | Tuesday, 29th December 2026 | 08:30 until work completed | Kg Kebia and Kg Pengkalan Mau, Mukim Kiudang, Tutong | Replacement of 11kV Aerial Cable | Kg Kebia (partially) and Kg Pengkalan Mau (partially), Mukim Kiudang, Tutong |
| 56 | Tuesday, 29th December 2026 | 08:30 until work completed | Kg Batang Mitus, Mukim Kiudang, Tutong | Replacement of 11kV Aerial Cable | Kg Batang Mitus (partially), Mukim Kiudang, Tutong |
| 57 | Wednesday, 30th December 2026 | 08:30 until work completed | Kg Kebia and Kg Pengkalan Mau, Mukim Kiudang, Tutong | Replacement of 11kV Aerial Cable | Kg Kebia (partially) and Kg Pengkalan Mau (partially), Mukim Kiudang, Tutong |
| 58 | Wednesday, 30th December 2026 | 08:30 until work completed | Kg Batang Mitus, Mukim Kiudang, Tutong | Replacement of 11kV Aerial Cable | Kg Batang Mitus (partially), Mukim Kiudang, Tutong |
| 59 | Thursday, 31st December 2026 | 08:30 until work completed | Kg Kebia and Kg Pengkalan Mau, Mukim Kiudang, Tutong | Replacement of 11kV Aerial Cable | Kg Kebia (partially) and Kg Pengkalan Mau (partially), Mukim Kiudang, Tutong |
| 60 | Thursday, 31st December 2026 | 08:30 until work completed | Kg Batang Mitus, Mukim Kiudang, Tutong | Replacement of 11kV Aerial Cable | Kg Batang Mitus (partially), Mukim Kiudang, Tutong |
BELAIT DISTRICT
SEPTEMBER 2026
Listed below are the designated areas for the planned maintenance work as for SEPTEMBER, 2026:
| Bill | Day & Date | Time | Location | Work Description | Affected Areas for Outages |
| 1 | Tuesday, 01st September 2026 |
08:00 am to 05:00 pm (Interruption of supply is about 5 mins i.e during load transfer) |
MIS Seri Maharaja | Maintenance of 11kV Switchgear | KB Sentral Shopping Centre, housing areas at Jalan Dermawangsa, Jalan Laila Bentara, part of Jalan Dipa Negara, part of STKRJ Kg Mumong and The Reach Apartment |
| 2 | Tuesday, 01st September 2026 |
08:30 am to 12:00 noon 01:30 pm to 04:30 pm |
Kampung Sungai Kuru | Maintenance of street light | Kampung Sungai Kuru and the surrounding areas |
| 3 | Wednesday, 02nd September 2026 |
08:30 am to 12:00 noon 01:30 pm to 04:30 pm |
Kampung Sungai Kuru | Maintenance of street light | Kampung Sungai Kuru and the surrounding areas |
| 4 | Thursday, 03rd September 2026 |
08:30 am to 12:00 noon 01:30 pm to 04:30 pm |
Kampung Sungai Kuru | Maintenance of street light | Kampung Sungai Kuru and the surrounding areas |
| 5 | Thursday, 10th September 2026 |
08:30 am to 12:15 noon 02:00 pm to 04:00 pm |
Sg. Bakong & Lumut Tersusun | Maintenance of Low Voltage Overhead Cable |
Jalan Kecil Sg. Bakong Lumut Spg 217 Sg Bakong and surrounding areas Nimanja Lumut Store, Al-Muhamadiyah Enterprise Supermarket and surrounding areas Spg 638, Spg 638-40, Spg 638-34, Spg 638-28 Lumut Tersusn and surrounding areas |
| 6 | Saturday, 12th September 2026 |
08:30 am to 12:15 noon 02:00 pm to 04:00 pm |
Sg. Bakong & Lumut Tersusun | Maintenance of Low Voltage Overhead Cable |
Jalan Kecil Sg. Bakong Lumut Spg 217 Sg Bakong and surrounding areas Nimanja Lumut Store, Al-Muhamadiyah Enterprise Supermarket and surrounding areas Spg 638, Spg 638-40, Spg 638-34, Spg 638-28 Lumut Tersusun and surrounding areas |
| 7 | Sunday, 13th September 2026 | 08:30 am until works completed | S/S Jalan Lorong Bolkiah Seria | Replacement of Sub-Distribution Feeder Pillar | Seria Municipal Department, Information Department, Seria Library, barrack Jalan Bolkiah, Spg 3, Spg 7 and Spg 13 Jalan Bolkiah Seria and surrounding areas |
| 8 | Monday, 21st September 2026 |
08:00 am to 12:00 noon 01:30 pm to 04:30 pm |
Sungai Kuru | Maintenance of Street Light | Kampong Sungai Kuru and its surrounding areas |
| 9 | Monday, 21st September 2026 |
08:30 am to 12:15 noon 01:30 pm to 04:30 pm |
Kampong Rampayoh | Replacement of Low Voltage Overhead | Part of Jalan Utama Rampayoh, Jalan Rampayoh (Mobil), Sekolah Rendah Rampayoh, Jalan Kecil Telingan Rampayoh Timur (Coffee Farm) and its Surrounding areas |
| 10 | Tuesday, 22nd September 2026 |
08:00 am to 12:00 noon 01:30 pm to 04:30 pm |
Sungai Kuru | Maintenance of Street Light | Kampong Sungai Kuru and its surrounding areas |
| 11 | Tuesday, 22nd September 2026 |
08:30 am to 12:15 noon 01:30 pm to 04:30 pm |
Kampong Rampayoh | Replacement of Low Voltage Overhead | Part of Jalan Utama Rampayoh, Jalan Rampayoh (Mobil), Sekolah Rendah Rampayoh, Jalan Kecil Telingan Rampayoh Timur (Coffee Farm) and its Surrounding areas |
| 12 | Wednesday, 23rd September 2026 |
08:30 am to 12:15 noon 01:30 pm to 04:30 pm |
Kampong Rampayoh | Replacement of Low Voltage Overhead | Part of Jalan Utama Rampayoh, Jalan Rampayoh (Mobil), Sekolah Rendah Rampayoh, Jalan Kecil Telingan Rampayoh Timur (Coffee Farm) and its Surrounding areas |
| 13 | Thursday 24th September 2026 |
08:30 am to 12:15 noon 01:30 pm to 04:30 pm |
Kampong Rampayoh | Replacement of Low Voltage Overhead | Part of Jalan Utama Rampayoh, Jalan Rampayoh (Mobil), Sekolah Rendah Rampayoh, Jalan Kecil Telingan Rampayoh Timur (Coffee Farm) and its Surrounding areas |
| 14 | Friday, 25th September 2026 | 08:30 am to 04:30 pm | Kampung Sungai Teraban, Kuala Belait | Wayleave Clearing | Kampung Sungai Teraban ( Spg.57, Spg.60, Spg.60-30 ) and its surrounding areas |
| 15 | Sunday, 27th September 2026 | 08:30 until works completed | Seria | Replacement of Distribution Feeder Pillar | Bangunan Kerajaan Pejabat Pos Seria, Balai Polis Seria, Barek Balai Polis Seria, Jalan Raja Isteri, Flat Jalan Raja isteri, Jalan Awang Semaun, Jalan Perakong, Jalan Sultan, Jalan Jerambak Pekan Seria and its surrounding areas |
| 16 | Monday, 28th September 2026 |
08:30 until works completed (Interruption of supply is about 5-15 mins i.e during load transfer) |
Kampong Sungai Petai | Transformer Maintenance | Simpang 489, Jalan Sungai Petai and its surrounding areas |
OCTOBER 2026
Listed below are the designated areas for the planned maintenance work as for OCTOBER, 2026:
| Bill | Day & Date | Time | Location | Work Description | Affected Areas for Outages |
| 1 | Wednesday, 07th October 2026 |
08:30 am until works completed (For info, Department of Electrical Services will supply temporary electricity to the affected areas through mobile generator services at the substation) |
S/S Kg Baru ERM | Maintenance of Transformer | Part of Simpang 94 Kg Baru including the surrounding areas |
| 2 | Monday, 12th October 2026 |
08:30 am to 12:15 noon 01:30 pm to 04:30 pm |
Labi | Replacement of Low Voltage Overhead Cable and 28ft/35ft poles | Jalan Tenajor, Tapang Lupak, UNN Tower and the surrounding areas |
| 3 | Tuesday, 13th October 2026 |
08:30 am to 12:15 noon 01:30 pm to 04:30 pm |
Labi | Replacement of Low Voltage Overhead Cable and 28ft/35ft poles | Jalan Tenajor, Tapang Lupak, UNN Tower and the surrounding areas |
| 4 | Wednesday, 14th October 2026 |
08:30 am to 12:15 noon 01:30 pm to 04:30 pm |
Labi | Replacement of Low Voltage Overhead Cable and 28ft/35ft poles | Jalan Tenajor, Tapang Lupak, UNN Tower and the surrounding areas |
| 5 | Thursday, 15th October 2026 |
08:00 am to 12:00 noon 01:30 pm to 04:30 pm |
Sg Bakong Selatan | Maintenance of Street lights | Sg Bakong Selatan |
| 6 | Thursday, 15th October 2026 |
08:30 am to 12:15 noon 01:30 pm to 04:30 pm |
Labi | Replacement of Low Voltage Overhead Cable and 28ft/35ft poles | Jalan Tenajor, Tapang Lupak, UNN Tower and the surrounding areas |
| 7 | Saturday, 17th October 2026 |
08:30 am to 12:15 noon 01:30 pm to 04:30 pm |
Labi | Replacement of Low Voltage Overhead Cable and 28ft/35ft poles | Jalan Tenajor, Tapang Lupak, UNN Tower and the surrounding areas |
| 8 | Sunday, 18th October 2026 |
08:00 am to 05:30 pm (For info, Department of Electrical Services will supply temporary electricity to the affected areas through mobile generator services at the substation) |
S/S Workshop Bandaran | Replacement of Transformer | Municipal Department, Lot 4004, Lot 4005, part of Jalan Lorong Setia Diraja. part of Jalan Setia Diraja Spg 36 and the surrounding areas |
| 9 | Monday, 19th October 2026 | 08:30 am to 04:30 pm | Labi | Replacement of Low Voltage Overhead Cable and 28ft/35ft poles | Jalan Tenajor, Tapang Lupak, UNN Tower and the surrounding areas |
| 10 | Tuesday, 20th October 2026 | 08:30 am to 04:30 pm | Labi | Replacement of Low Voltage Overhead Cable and 28ft/35ft poles | Jalan Tenajor, Tapang Lupak, UNN Tower and the surrounding areas |
| 11 | Wednesday, 21st October 2026 | 08:00 am to 05:30 pm | Spg 426 Jalan Maulana | Replacement of Distribution Feeder Pillar | Spg 426, Spg 430 and Spg 436 Jalan Maulana and the surrounding areas |
| 12 | Wednesday, 21st October 2026 | 08:30 am to 04:30 pm | Labi | Replacement of Low Voltage Overhead Cable and 28ft/35ft poles | Jalan Tenajor, Tapang Lupak, UNN Tower and the surrounding areas |
| 13 | Thursday, 22nd October 2026 | 08:30 am to 04:30 pm | Labi | Replacement of Low Voltage Overhead Cable and 28ft/35ft poles | Jalan Tenajor, Tapang Lupak, UNN Tower and the surrounding areas |
| 14 | Saturday, 24th October 2026 | 08:30 am until works completed | S/S ERM Pekan Seria | Replacement of Distribution Feeder Pillar | Pekan Seria areas, Jalan Bunga Mawar, Jalan Bunga Pinang, Jalan Raja Puteri, KPPM Filling Station, JKR Pump and the surrounding areas |
| 15 | Thursday, 29th October 2026 | 08:30 am until works completed | S/S Perumahan Buruh Seria | Replacement of Distribution Feeder Pillar | Barrack Jalan Lorong Tiga Spg 198, Spg 198-62 and the surrounding areas |
NOVEMBER 2026
Listed below are the designated areas for the planned maintenance work as for NOVEMBER, 2026:
| Bill | Day & Date | Time | Location | Work Description | Affected Areas for Outages |
| 1 | Tuesday, 17th November 2026 |
08:30 am to 12:15 noon 01:30 pm to 04:30 pm |
Jalan Lumut Tersusun | Replacement of Low Voltage Overhead Cable | Part of Jalan Lumut Tersusun Spg 639-46, Spg 638-46-43 and surrounding areas |
| 2 | Wednesday, 18th November 2026 |
08:30 am to 12:15 noon 01:30 pm to 04:30 pm |
Jalan Lumut Tersusun | Replacement of Low Voltage Overhead Cable | Part of Jalan Lumut Tersusun Spg 639-46, Spg 638-46-43 and surrounding areas |
| 3 | Thursday, 19th November 2026 |
08:30 am to 12:15 noon 01:30 pm to 04:30 pm |
Jalan Lumut Tersusun | Replacement of Low Voltage Overhead Cable | Part of Jalan Lumut Tersusun Spg 639-46, Spg 638-46-43 and surrounding areas |
DECEMBER 2026
Listed below are the designated areas for the planned maintenance work as for DECEMBER, 2026:
| Bill | Day & Date | Time | Location | Work Description | Affected Areas for Outages |
| 1 | Saturday, 05th December 2026 | 08:30 am until works completed | S/S Perumahan Buruh Seria | Replacement of Distribution Feeder Pillar | Pengiran Setia Negara Pg. Hj. Mohd. Yusof Primary School, Barracks at Spg 198 and Spg 198-62 Jalan Lorong Tiga Seria and surrounding area |
TEMBURONG DISTRICT
SEPTEMBER 2026
Listed below are the designated areas for the planned maintenance work as for SEPTEMBER, 2026:
Bill |
Day & Date |
Time |
Location |
Work Description |
Affected Areas for Outages |
1 |
Tuesday, 1st September 2026 | 8.30 am until 3.00 pm | Kg Lepong Lama | Wayleave Maintenance | A part of Kg Lepong Lama and the surrounding area |
2 |
Wednesday, 2nd September 2026 | 8.30 am until 3.00 pm | Kg Lepong Lama | Wayleave Maintenance | A part of Kg Lepong Lama and the surrounding area |
3 |
Thursday, 3rd September 2026 | 8.30 am until 3.00 pm | Kg Parit | Wayleave Maintenance | A part of Kg Parit, Spg 1062 and the surrounding area |
4 |
Saturday, 19th September 2026 | 8.30 am until 4.30 pm | Kg Batang Duri | Wayleave Maintenance | A part of Kg Batang Duri and the surrounding area |
5 |
Tuesday, 29th September 2026 | 8.30 am until 4.00 pm | Kg Parit Lama | Wayleave Maintenance | A part of Kg Parit Lama, Spg 913 and the surrounding area |
OCTOBER 2026
Listed below are the designated areas for the planned maintenance work as for OCTOBER, 2026:
Bill |
Day & Date |
Time |
Location |
Work Description |
Affected Areas for Outages |
1 |
Thursday, 8th October 2026 | 8.30 am until 4.00 pm | Kg Amo | Wayleave Maintenance | A part of Kg Amo and the surrounding area |
2 |
Friday, 9th October 2026 | 8.30 am until 11.00 am and 2.00 pm until 5.00 pm | Kg Amo | Wayleave Maintenance | A part of Kg Amo and the surrounding area |
3 |
Saturday, 10th October 2026 | 8.30 am until 3.00 pm | Kg Bokok | Wayleave Maintenance | A part of Kg Bokok and the surrounding area |
4 |
Monday, 12th October 2026 | 8.30 am until 4.00 pm | Kg Bangbulan, Kg Lagau and Kg Belingus | Wayleave Maintenance | A part of Kg Bangbulan, Kg Lagau, Kg Belingus and the surrounding area |
5 |
Tuesday, 13th Ocotber 2026 | 8.30 am until 3.00 pm | Kg Selangan and Kg Parit | Wayleave Maintenance | A part of Kg Selangan, Kg Parit and the surrounding area |
6 |
Friday, 23rd October 2026 | 8.00 am until 11.30 am and 2.00 pm until 5.00 | Kg Amo | Wayleave Maintenance | A part of Kg Amo and the surrounding area |
7 |
Saturday, 24th October 2026 | 8.30 am until 3.30 pm | Kg Sibulu and Kg Rataie | Wayleave Maintenance | A part of Kg Sibulu, Kg Rataie and the surrounding area |
8 |
Wednesday, 28th October 2026 | 8:00 am until 9:00 am and 4:00 pm until 5:00 pm | OSS Pejabat Lama | Replacement of Ring Main Unit | Flat Guru-guru, Barek Daerah, KDN, NARKOTIK, Jabatan Pemeliharaan Bahagian Kenderaan and surrounding area |
9 |
Thursday, 29th October 2026 | 8:00 am until 9:00 am and 4:00 pm until 5:00 pm | OSS Bomba Bangar | Replacement of Ring Main Unit | Bomba Bangar, Barek Bomba Bangar, Sekolah Sultan Hassan Bangar, Jabatan Sekolah-sekolah and surrounding area |
10 |
Saturday, 31st October 2026 | 8:00 am until 9:00 am and 4:00 pm until 5:00 pm | OSS Kg Menengah | Replacement of Ring Main Unit | A part of Kg Menengah and surrounding area |
NOVEMBER 2026
Listed below are the designated areas for the planned maintenance work as for NOVEMBER, 2026:
1 |
Monday, 2nd November 2026 | 8:00 am until 9:00 am and 4:00 pm until 5:00 pm | OSS Belayang | Replacement of Ring Main Unit | A part of Kg Belayang and the surrounding area |
2 |
Tuesday, 3rd November 2026 | 8:00 am until 9:00 am and 4:00 pm until 5:00 pm | OSS Puni A | Replacement of Ring Main Unit | A part of Kg Puni A and the surrounding area |
3 |
Wednesday, 4th November 2026 | 8:00 am until 9:00 am and 4:00 pm until 5:00 pm | OSS Paya Bagangan | Replacement of Ring Main Unit | A part of Kg Paya Bagangan and the surrounding area |
4 |
Wednesday, 4th November 2026 | 8:00 am until 9:00 am and 4:00 pm until 5:00 pm | OSS Kg Belais | Replacement of Ring Main Unit | A part of Kg Belais and the surrounding area |
5 |
Thursday, 5th November 2026 | 8:00 am until 9:00 am and 4:00 pm until 5:00 pm | OSS Kg Kenua | Replacement of Ring Main Unit | A part of Kg Kenua and the surrounding area |
6 |
Thursday, 5th November 2026 | 8:00 am until 9:00 am and 4:00 pm until 5:00 pm | OSS Skim Tanah Kurnia Rakyat Jati Kg Rataie | Replacement of Ring Main Unit | A part of Skim Tanah Kurnia Rakyat Jati Kg Rataie and the surrounding area |
7 |
Saturday, 7th November 2026 | 8:00 am until 9:00 am and 4:00 pm until 5:00 pm | OSS Paya Bangangan | Replacement of Ring Main Unit | A part of Kg Paya Bagangan and the surrounding area |
8 |
Monday, 9th November 2026 | 8.30 am until 3.30 pm | Kg Sumbiling Lama and Kg Sumbiling Baru | Wayleave | A part of Kg Sumbiling Lama, Kg Sumbiling Baru and the surrounding area |
9 |
Monday, 9th November 2026 | 8:00 am until 9:00 am and 4:00 pm until 5:00 pm | OSS Kg Rataie 3 | Replacement of Ring Main Unit | A part of Kg Rataie and the surrounding area |
10 |
Tuesday, 10th November 2026 | 8:00 am until 9:00 am and 4:00 pm until 5:00 pm | OSS Kg Parit Lama | Replacement of Ring Main Unit | A part of Kg Parit Lama and the surrounding area |
11 |
Wednesday, 11th November 2026 | 8:00 am until 9:00 am and 4:00 pm until 5:00 pm | OSS Kg Kinalong | Replacement of Ring Main Unit | A part of Kg Kinalong and the surrounding area |
12 |
Thursday, 12th November 2026 | 8:00 am until 9:00 am and 4:00 pm until 5:00 pm | OSS Kg Rataie 3 | Replacement of Ring Main Unit | A part of Kg Rataie and the surrounding area |
13 |
Tuesday, 10th November 2026 | 8.30 am until 3.30 pm | OSS Kg Senukoh | Wayleave | A part of Kg Senukoh and the surrounding area |
14 |
Saturday, 14th November 2026 | 8.30 am until 3.30 pm | OSS Kg Batang Tuau | Wayleave | A part of Kg Batang Tuau and the surrounding area |
15 |
Monday, 16th November 2026 | 8.30 am until 3.30 pm | OSS Kg Menengah | Wayleave | A part of Kg Menengah and the surrounding area |
16 |
Friday, 20th November 2026 | 8.00 am until 11.30 am and 2.00 pm until 5.00 pm | Kg Belayang | Wayleave | A part of Kg Belayang, Pai Yuek School and the surrounding area |
17 |
Monday, 23rd November 2023 | 8.30 am until 12.00 pm | Kg Menengah | Replacement Cabel ABC Low Voltage | A part of Kg Menengah, Spg 89 and the surrounding area |