Planned Maintenance Work

BRUNEI MUARA DISTRICT

DECEMBER 2025
Listed below are the designated areas for the planned maintenance work as for DECEMBER , 2025:
Bill Day & Date Time Location Work Description Affected Areas for Outages
1 Tuesday, 02nd December 2025 9.00 am to 5.00 pm
(For info, Department of Electrical Services will supply temporary electricity to the affected areas through mobile generator services at the substation)
Sub-Station Masjid Batu Marang Replacement of Distribution Transformer Cable Masjid Batu Marang and its surrounding areas
2 Monday, 1st December 2025 10.30 pm to 4.30 am Sub-Station Delima Square, Jln Serusop Replacement of Ring Main Unit 2R1T Delima Square, Jln Serusop and its surrounding areas.
3 Thursday, 04th December 2025 9.00 am to 4.00 pm
(For info, Department of Electrical Services will supply temporary electricity to the affected areas through mobile generator services at the substation)
Switching Station Batong Maintenance of 11kV System Switching Station Batong and its surrounding areas.
4 Thursday, 04th December 2025 9.00 am to 3.00 pm Kg. Manggis Dua Maintenance of Overhead Lines Cable Spg. 45, Kg. Manggis Dua and its surrounding areas.
5 Thursday, 04th December 2025 9.00 am to 2.00 pm Kg. Junjongan Low Voltage Underground Cable Extension and Jointing Spg. 1789 to Spg. 1833 Kg. Junjongan and its surrounding areas.
6 Monday, 08th December 2025 9.00 am to 3.00 pm Kg. Beribi Installation of New Stay Wire Spg. 166 & Spg. 176 Kg. Beribi and its surrounding areas.
7 Monday, 08th December 2025 9.00 am to 3.00 pm Jln Pasir Berakas Maintenance of Overhead Lines Spg. 225, Jln Pasir Berakas and its surrounding areas.
8 Monday, 08th December 2025 9.00 am to 5.00 pm
(For info, Department of Electrical Services will supply temporary electricity to the affected areas through mobile generator services at the substation)
Sub-Station Sekolah Rendah Tanah Jambu Maintenance of Distribution Transformer Sekolah Rendah Tanah Jambu and its surrounding areas.
9 Tuesday, 09th December 2025 9.00 am to 3.00 pm Kg. Katok ‘A’ Installation of Overhead Lines Cable Spg. 355-60, Kg. Katok ‘A’ and its surrounding areas.
10 Thursday, 11th December 2025 9.00 am to 5.00 pm
(For info, Department of Electrical Services will supply temporary electricity to the affected areas through mobile generator services at the substation)
Sub-Station Sekolah Rendah Mata-Mata Maintenance of Distribution Transformer Sekolah Rendah Mata-Mata and its surrounding areas.
11 Saturday, 13th December 2025

9.00 am to 5.00 pm

(For info, Department of Electrical Services will supply temporary electricity to the affected areas through mobile generator services at the substation)

Kg. Mata-Mata Replacement of Ring Main Unit Substation Bangunan Pengiran Anak Hajah Siti Rafeah Kg. Mata-Mata and surrpunding areas.
12 Thursday, 11th December 2025 9.00 am to 2.00 pm Kg. Selayun and Kg. Jerudong Installation and Jointing of Low Voltage Cable Spg. 124-133 and Spg. 124-153, Kg. Selayun and its surrounding areas and Apart Spg. 396-133, Kg. Jerudong and its surrounding areas.
13 Tuesday, 16th December 2025 9.00 am to 2.00 pm Jalan Bukit Salat and Kg. Tanjung Bunut Installation and Jointing of Low Voltage Cable Spg. 1244-37 to Spg. 1244-42, Jalan Bukit Salat and its surrounding areas and Apart of Spg. 1202, Kg. Tanjung Bunut and its surrounding areas.
14 Thursday, 18th December 2025 9.00 am to 11.30 am Jalan Tanjong Bunut Kanan Relocation of Low Voltage Overhead Lines Jalan Tanjong Bunut Kanan, Around Spg. 59 to Spg. 59-65 and its surrounding areas.
15 Thursday, 18th December 2025 9.00 am to 3.00 pm Kg. Katok ‘A’ Installation of Overhead Lines Cable Spg. 355-60, Kg. Katok ‘A’ and its surrounding areas.
16 Saturday, 18th December 2025

9.00 am to 5.00 pm

(For info, Department of Electrical Services will supply temporary electricity to the affected areas through mobile generator services at the substation)

Sub-Station Spg. 185 Kg. Tungku Replacement of Ring Main Unit 2R2T Spg. 185 Kg. Tungku and its surrounding areas.
17 Wednesday, 24th December 2025 9.00 am to 3.00 pm Kg. Junjongan Installation and Jointing of Low Voltage Cable at Substation Spg. 2217 to 2283 and Traffic Light no J84, Kg. Junjongan and its surrounding areas.
18 Monday, 29th December 2025 9.00 am to 2.00 pm Jln Pasir Berakas, Kg. Lambak Maintenance of Overhead Lines Cable Spg. 207 Jln Pasir Berakas Kg. Lambak and its surrounding areas.

 

JANUARY 2026
Listed below are the designated areas for the planned maintenance work as for JANUARY , 2026: 
Bill
Day & Date
Time
Location
Work Description
Affected Areas for Outages
1
Saturday, 03rd January 2026
9.00 am to 3.00 pm
Kg. Bunut
Relocated of Overhead Lines Cable to New Pole
Spg. 803 Kg. Bunut and its surrounding areas
2
Thursday, 08th January 2026
9.00 am to 5.00 pm
(For info, Department of Electrical Services will supply temporary electricity to the affected areas through mobile generator services at the substation)
Sub-Station Spg. 52-55-30 Kg. Mata-Mata
Replacement of Ring Main Unit
Spg. 52-55-30 Kg. Mata-Mata and its surrounding areas.
3
Thursday, 08th January 2026
9.00 am to 3.00 pm
Kg. Lumapas
Replacement of Overhead Lines Cable
Spg. 654 Kg. Lumapas and its surrounding areas.
4
Saturday, 10th January 2026
9.00 am to 3.00 pm
Kg. Lumapas
Replacement of Overhead Lines Cable
Spg. 572 Kg. Lumapas and its surrounding areas.
5
Monday, 12th January 2026
9.00 am to 3.00 pm
Kg. Lumapas
Replacement of Overhead Lines Cable
Spg. 488 Kg. Lumapas and its surrounding areas.
6
Saturday, 10th January 2026
8.30 am to 2.00 pm
Jalan Subok
Installation of Overhead Lines Pole
Spg 287 Jalan Subok and its surrounding areas.
7
Thursday, 08th January 2026
9.00 am to 11.30 am
Kg. Kilanas
Dismantle of Strut Pole
After Spg 86 to SImpang 105, Jalan Kilanas Bebatik, Kg. Kilanas and its surrounding areas.
8
Sunday, 11th January 2026
9.00 am t0 2.00 pm
Kg. Tungku
Relocated of Overhead Lines Cable
Spg. 289-19 Kg. Tungku and its surrounding areas.
9
Monday, 12th January 2026
9.00 am t0 2.00 pm
Jalan PAsir Berakas
Replacement of Overhead Lines Cable
Spg. 279 Jln Pasir Berakas and its surrounding areas.
10
Monday, 12th January 2026
9.00 am to 4.00 pm
Bgn. Putri-Putri Pusar Ulak
Replacement of Distribution Feeder Pillar
Bgn. Putri-Putri Pasar Ulak and its surrounding areas.
11
Wednesday, 14th January 2026
9.00 am t0 2.00 pm
Kg. Lumapas
Replacement of Overhead Lines Cable
Spg. 654 Kg. Lumapas and its surrounding areas.
12
Wednesday, 14th January 2026
9.00 am to 3.00 pm
Kg. Salambigar
Replacement of Distribution Feeder Pillar
Spg. 602, Spg. 612 Kg. Salambigar and its surrounding areas.
13
Wednesday, 14th January 2026
9.00 am to 12.00 noon
Kg. Tanah Jambu
Relocated of the Overhead Lines to New Pole
Simpang 1046, Kg. Tanah Jambu and its surrounding areas.
14
Sunday, 18th January 2026
9.00 am to 3.00 pm
Kg. Manggis 1
Replacement of Distribution Feeder Pillar
Spg. 23 Kg. Manggis 1 and its surrounding areas
15
Monday, 19th January 2026
9.00 am to 5.00 pm
(For info, Department of Electrical Services will supply temporary electricity to the affected areas through mobile generator services at the substation)
Sub-Station Spg. 616 Jln Kecil Kg. Masin
Replacement of Ring Main Unit 2R2T
Spg. 616 Jln Kecil Kg. Masin and its surrounding areas.
16
Monday, 19th January 2026
9.00 am to 3.00 pm
Kg. Lumapas
Replacement of Overhead Lines Cable
Spg. 434 Kg. Lumapas and its surrounding areas.
17
Monday, 19th January 2026
9.00 am to 3.00 pm
Kg. Beribi
Replacement of Overhead Lines Cable
Spg. 45-39-8 Kg. Beribi and its surrounding areas.
18
Tuesday, 20th January 2026
9.00 am to 5.00 pm
(For info, Department of Electrical Services will supply temporary electricity to the affected areas through mobile generator services at the substation)
Sub-Station Masjid Kg. Setia
Replacement of Distribution Transformer Cable
Masjid Kg. Setia and its surrounding areas.
19
Wednesday, 21st January 2026
9.00 am to 5.00 pm
Sub-Station Jalan Bengkurong 2
Maintenance of Distribution Feeder Pillar
Spg. 30 Jln Bengkurong 2 and its surrounding areas.
20
Saturday, 24th January 2026
9.00 am to 5.00 pm
Sub-Station Taman Kiya-Kiya, Kg. Tungku
Maintenance of Distribution Feeder Pillar
Taman Kiya-Kiya Kg. Tungku and its surrounding areas.
21
Tuesday, 27th January 2026
9.00 am to 5.00 pm
(For info, Department of Electrical Services will supply temporary electricity to the affected areas through mobile generator services at the substation)
Sub-Station JalanSg. Tamoi
Replacement of Distribution Transformer Cable
Jalan Sg. Tamoi and its surrounding areas.
22
Monday, 26th January 2026
8.00 am until works completed
Kg. Bebatik
Maintenance of Overhead Lines
Spg. 406 to Spg. 444, Jalan Mulaut, Kg. Bebatik and its surrounding areas.
23
Tuesday, 27th January 2026
8.00 am until works completed
Kg. Kilanas
Maintenance of Overhead Lines
Spg. 127 to Spg. 142, Jalan Ban 5, Kg. Kilanas and its surrounding areas.
24
Wednesday, 28th January 2026
8.00 am until works completed
Kg. Kilanas
Maintenance of Overhead Lines
Spg. 91 to Spg. 114, Jalan Ban 5, Kg. Kilanas and its surrounding areas.
25
Thursday, 29th January 2026
8.00 am until works completed
Kg. Kilanas
Maintenance of Overhead Lines
Spg. 69 to Spg. 109, Jalan Ban 4, Kg. Kilanas and its surrounding areas.
26
Thursday, 22nd January 2026
9.00 am to 3.00 pm
Kg. Selayun
Relocated of Low Voltage Overhead Lines and Low Voltage Underground Cable Connection
Jalan Sengkurong B, Kg. Selayun after Spg. 54 to Spg. 90 and Spg. 38 to Spg. 38-96, Kg. Selayun and its surrounding areas.
27
Saturday, 24th January 2026
9.00 am to 3.00 pm
Kg. Sg. Tilong
Relocated of Overhead Lines Cable
Spg. 420, Kg. Sg. Tilong and its surrounding areas.
28
 Tuesday, 27th January 2026
9.00 am to 5.00 pm
(For info, Department of Electrical Services will supply temporary electricity to the affected areas through mobile generator services at the substation)
Stesen Minyak and Kedai Komersial Pekan Muara 
 Replacement of Distribution Feeder Pillar
Stesen Minyak and Kedai Komersial Pekan Muara and its surrounding areas.
 
29
 Tuesday, 27th January 2026
9.00 am to 3.00 pm
Kg. Bunut
Replacement of Mini Feeder Pillar
Spg. 587, Kg. Bunut and its surrounding areas.
30
Wednesday, 28th January 2026
9.00 am to 3.00 pm
Kg. Sg. Akar
Replacement of Overhead Lines Cable
Spg. 396-128 Kg. Sg. Akar and its surrounding areas.
31
Saturday, 31st January 2026
10.00 am to 4.00 am
Kg. Rimba
Replacement of Overhead Lines Cable
Spg. 12-42, Kg. Rimba and its surrounding areas.
32
Wednesday, 28th January 2026
8.00 am to 12.00 noon
Kg. Jerudong
Replacement of Mini Feeder Pillar
Spg. 730, Jerudong and its surrounding areas.
33
Thursday, 29th January 2026
9.00 am to 1.30 pm
Kg. Selayun
Stringing of Low Voltage Overhead Lines
Spg. 124-132, Kg. Selayun and its surrounding areas.
34
Thursday, 29th January 2026
9.00 am to 5.00 pm
Kg. Tanjong Nangka
Relocated of Low Voltage and High Voltage Overhead Lines 
Along Jalan Jerudong Baru, Kg. Tanjong Nangka and its surrounding areas.
35
Saturday, 31st January 2026
9.00 am to 3.00 pm
Kg. Selayun
Relocated of Low Voltage Overhead Lines and Low Voltage Underground Cable Connection
Around Spg. 59-65 to Spg. 59-74, Jln Tanjung Bunut Kanan and around Spg. 38-96, Kg. Selayun and its surrounding areas.
36
Tuesday, 27th January 2026
9.00 am to 3.00 pm
Sub-Station Spg. 616 Jalan Kecil Masin
Replacement of Distribution Feeder Pillar
Spg. 616 Jalan Kecil Masin and its surrounding areas.
37
Wednesday, 28th January 2025
9.00 am to 3.00 pm
Sub-Station Spg. 30 Kg. Bengkurong 2
Maintenance of Distribution Feeder Pillar
Spg. 30 Kg. Bengkurong 2 and its surrounding areas.
38
Saturday, 31st January 2026
9.00 am to 3.00 pm
Sub-Station Spg. 258, Taman Kiya-Kiya, Kg. Tungku
Maintenance of Distribution Feeder Pillar
Spg. 258 Taman Kiya-Kiya, Kg. Tungku and its surrounding areas
39
Saturday, 31st January 2026
9.00 am to 3.00 pm
Kg. Rimba
Replacement of Overhead Lines Cable
Spg. 12-42 Kg. Rimba and its surrounding areas.
40
Saturday, 31st January 2026
9.00 am to 4.00 pm
Sub-Station Bangunan Fung Fock Choon, Jln Gadong
Replacement of Distribution Feeder Pillar
Bangunan Fung Fock Choon, Jln Delima and its surrounding areas.
FEBRUARY 2026
Listed below are the designated areas for the planned maintenance work as for FEBRUARY , 2026:
Bill
Day & Date
Time
Location
Work Description
Affected Areas for Outages
1
Wednesday, 04th February 2026
9.00 am to 5.00 pm
(For info, Department of Electrical Services will supply temporary electricity to the affected areas through mobile generator services at the substation)
Sub-Station Spg. 70-112 Jln Parit Kg. Masin
Replacement of Ring Main Unit 2R2T
Spg. 70-112 Jln Parit
2
Thursday, 05th February 2026
9.30 am to 2.00 pm
Kg. Kulapis
Relocated of Low Voltage Overhead Lines
Around Spg. 58 to Spg. 96 Kg. Kulapis, Jln Kulapis, Panchor Murai and its surrounding areas.
3
Monday, 02nd February 2026
8.00 am until works completed
Kg. Masin
Maintenance of Overhead Lines
Spg. 339, Jalan Bengkurong, Kg. Masin and its surrounding areas.
4
Tuesday, 03rd February 2026
8.00 am until works completed
Kg. Batong
Maintenance of Overhead Lines
Around Spg. 254 to Spg. 298, Jalan Kulapis-Panchor Murai, Kg. Batong and its surrounding areas.
5
Wednesday, 04th February 2026
8.00 am until works completed
Kg. Batong
Maintenance of Overhead Lines
Spg. 298 to no 366, Jalan Kulapis-Panchor Murai, Kg. Batong and its surrounding areas.
6
Thursday, 05th February 2026
8.00 am until works completed
Kg. Batong
Maintenance of Overhead Lines
Spg. 386, Kg. Batong and its surrounding areas.
7
Monday, 09th February 2026
8.00 am until works completed
Kg. Batong
Maintenance of Overhead Lines
Spg. 421 to Spg. 470, Jalan Kulapis-Panchor Murai, Kg. Batong and its surrounding areas.
8
Tuesday, 10th February 2026
8.00 am until works completed
Kg. Batong
Maintenance of Overhead Lines
Spg. 433, Kg. Batong and its surrounding areas.
9
Wednesday, 11th February 2026
8.00 am until works completed
Kg. Masin
Maintenance of Overhead Lines
Spg. 28, Jalan Sangai-Sangai, Kg. Masin and its surrounding areas.
10
Thursday, 12th February 2026
8.00 am until works completed
Kg. Masin
Maintenance of Overhead Lines
Spg. 56, Jalan Sangai-Sangai, Kg. Masin and its surrounding areas.
11
Tuesday, 03rd February 2026
9.00 am to 3.00 pm
Kg. Bengkurong 2
Replacement of Overhead Lines Cable
Spg. 16 Kg. Bengkurong 2 and its surrounding areas.
12
Thursday, 05th February 2026
9.00 am to 3.00 pm
Kg. Bengkurong
Replacement of Overhead Lines Cable
Spg. 66-38-60, Spg. 66-38-60-3 Kg. Bengkurong and its surrounding areas.
13
Tuesday, 10th February 2026
9.00 am to 3.00 pm
Kg. Delima
Replacement of Overhead Lines Cable
Spg. 94-19 Kg. Delima and its surrounding areas.
14
Thursday, 12th February 2026
9.00 am to 3.00 pm
Kg. Delima
Replacement of Overhead Lines Cable
Spg. 94 Kg. Delima and its surrounding areas.
15
Saturday, 14th February 2026
9.00 am to 3.00 pm
Kg. Mata-Mata
Replacement of Overhead Lines Cable
Spg. 74-36 Spg. 74-30 Kg. MAta-MAta and its surrounding areas.
16
Wednesday, 04th February 2026
9.00 am to 3.00 pm
Kg. Bunut
Relocated of Overhead Line Cable to New Pole
Kg. Bunut, Spg. 803 and its surrounding areas
17
Wednesday, 04th February 2026
9.00 am to 5.00 pm
(For info, Department of Electrical Services will supply temporary electricity to the affected areas through mobile generator services at the substation)
Sub-Station Parit Pengkalan Batu 1
Replacement of Ring Main Unit
Jalan Parit-Masin, Kg. Pengkalan Batu and its surrounding areas.
18
Saturday, 07th February 2026
9.00 am to 4.00 pm
Kg. Sg. Tilong
Replacement of Distribution Feeder Pillar 800Amp
Spg. 420, Kg. Sg. Tilong and its surrounding areas.
19
Monday, 09th February 2026
9.00 am to 4.00 pm
Jalan Pasir Berakas
Replacement of Distribution Feeder Pillar 600Amp
Spg. 160-18, Jalan Pasir Berakas and its surrounding areas.
20
Monday, 16th February 2026
9.00 am to 4.00 pm
Kg. Burong Pinggai Berakas
Replacement of Distribution Feeder Pillar 1600Amp
Jln Durian, Kg. Burong Pinggai Berakas and its surrounding areas.
21
Monday, 02nd February 2026
8.00 am to 12.00 noon
1.00 pm to 5.00 pm
Kg. Tanjung Nangka
Installation of New Pole
Jalan Seri Pahlawan, Kg. Tanjung Nangka, around Spg. 1626-41 to Spg. 1626-206 and its surrounding areas.
22
Tuesday, 03rd February 2026
8.00 am to 12.00 noon
1.00 pm to 5.00 pm 
Kg. Tanjung Nangka
Installation of New Pole
Jalan Seri Pahlawan, Kg. Tanjung Nangka, around Spg. 1626-41 to Spg. 1626-206 and its surrounding areas.
23
Wednesday, 04th February 2026
8.00 am to 12.00 noon
1.00 pm to 4.30 pm 
Kg. Jerudong
Replacement of Mini Feeder Pillar (MFP)
Spg. 730, Kg. Jerudong and its surrounding areas.
24
Thursday, 05th February 2026
8.00 am to 12.00 noon
1.00 pm to 5.00 pm 
Kg. Tanjung Nangka 
Installation Of New Pole 
Jalan Seri Pahlawan, Kg. Tanjung Nangka, around Spg. 1626-41 to Spg. 1626-206 and its surrounding areas.
25
Saturday, 07th February 2026
8.00 am to 12.00 noon
1.00 pm to 5.00 pm 
Kg. Tanjung Nangka 
Installation Of New Pole 
Jalan Seri Pahlawan, Kg. Tanjung Nangka, around Spg. 1626-41 to Spg. 1626-206 and its surrounding areas.
26
Saturday, 07th February 2026
9.00 am to 12.00 noon
Kg. Panchor Murai
Relocated of Overhead Line Cable to New Pole
Spg. 746 to Spg. 813, Jalan Panchor Murai, Kulapis, Kg. Panchor Murai and its surrounding areas.
27
Monday, 09th February 2026
9.00 am to 4.00 pm
Sub-Station Bangunan Fung Fock Choon
Replacement of Distribution Feeder Pillar
Bangunan Fung Fock Choon, Jln Gadong and its surrounding areas.
28
Wednesaday, 11th February 2026
9.00 am to 5.00 pm
(For info, Department of Electrical Services will supply temporary electricity to the affected areas through mobile generator services at the substation)
Sub-Station Spg. 52-19, Kg. Mata-Mata
Replacement of Ring Main Unit
Spg. 52-19, Kg. Mata-Mata and its surrounding areas.
29
Monday, 09th February 2026
8.00 am to 12.00 noon
Kg. Jerudong
Wayleave Maintenance
Spg. 730, Jerudong and its surrounding areas.
30
Tuesday, 10th February 2026
9.00 am to 3.00 pm
Jalan Tanjung Bunut Kanan and Kg. Selayun
Relocated of ow Voltage Overhead Lines and Low Voltage Underground Cable
Spg. 59-65 to Spg. 59-74, Jalan Tanjung Bunut Kanan and Spg. 38-96 Kg. Selayun and its surrounding areas.
31
Wednesday, 11th February 2026
8.00 am to 12.00 noon
Kg. Jerudong
Wayleave Maintenance
Spg. 339, Jerudong and its surrounding areas.
32
Thursday, 12th February 2026
8.00 am to 12.00 noon
Kg. Jerudong
Wayleave Maintenance
Spg. 166, Jerudong and its surrounding areas.
33
Wednesday, 11th February 2026
9.00 am to 3.00 pm
Kg. Rimba
Replacement of Overhead Lines Cable
Spg. 12-46 Kg. Rimba and its surrounding areas.
34
Thursday, 12th February 2026
8.00 am to 5.00 pm
Kg. Tanjung Nangka
Stringing of 11kV High Voltage Overhead Lines
Spg. 1626-41 to Spg. 1626-206, Jalan Seri Pahlawan, Kg. Tanjung Nangka
35
Saturday, 14th February 2026
8.00 am to 5.00 pm
Kg. Tanjung Nangka
Stringing of 11kV High Voltage Overhead Lines
Spg. 1626-41 to Spg. 1626-206, Jalan Seri Pahlawan, Kg. Tanjung Nangka
36
Monday, 16th February 2026
8.00 am to 5.00 pm
Kg. Tanjung Nangka
Stringing of 11kV High Voltage Overhead Lines
Spg. 1626-41 to Spg. 1626-206, Jalan Seri Pahlawan, Kg. Tanjung Nangka
37
Monday, 16th February 2026
8.00 am to 12.00 noon
Kg. Selayun
Wayleave Maintenance
Spg. 29-93, Kg. Selayun and its surrounding areas.
 38
Wednesday, 18th February 2026 
8.00 am to 12.00 noon 
Kg. Selayun 
Wayleave Maintenance 
At the end of Spg. 124-122 Kg. Selayun and its surrounding areas.
39
Thursday, 19th February 2026
8.00 am to 12.00 noon 
Kg. Selayun 
Wayleave Maintenance 
At the end of Spg. 124-122 Kg. Selayun and its surrounding areas.
40
Monday, 23rd February 2026
8.00 am to 12.00 noon 
Kg. Selayun 
Wayleave Maintenance 
Spg. 38-79 Kg. Selayun and its surrounding areas.
41
Wednesday, 25th February 2026
8.00 am to 12.00 noon 
Kg. Selayun 
Wayleave Maintenance 
At the end of Spg. 124, Kg. Selayun and its surrounding areas.
42
Thursday, 26th February 2026
8.00 am to 12.00 noon 
Kg. Selayun 
Wayleave Maintenance 
Spg. 77, Kg. Selayun and its surrounding areas.
43
Sunday, 15th February 2026
9.00 am to 2.00 pm
Kg. Setia A
Relocated of Overhead Lines Cable
Kg. Setia ‘A’ and its surrounding areas.
44
Monday, 16th February 2026
9.00 am to 2.00 pm
Jalan Subok
Maintenance of Overhead Lines Cable
Spg. 287 Jalan Subok and its surrounding areas.
45
Tuesday, 24th February 2026
9.00 am to 1.00 pm
Kg. Junjongan
Relocated of Overhead Lines
After Spg. 1923 to Spg. 1949, Kg. Junjongan and its surrounding areas.

 

TUTONG DISTRICT

JANUARY 2026
AListed below are the designated areas for the planned maintenance work as for JANUARY, 2026:
Bill
Day & Date
Time
Location
Work Description
Affected Areas for Outages
1
Saturday, 03rd January 2026
08:30am-11:30am & 13:30pm-16:30pm
Mukim Lamunin Tutong
Maintenance of Overhead lines
A part of Kg Bukit Sulang, Kg Bukit Sulang, Kg Menengah, Kg Bang Nukat and surrounding areas
2
Monday, 05th January 2026
08:30am-11:30am & 13:30pm-16:30pm
Mukim Lamunin Tutong
Maintenance of Overhead lines
A part of Kg Bukit Sulang, Kg Bukit Sulang, Kg Menengah, Kg Bang Nukat and surrounding areas
3
Tuesday, 06th January 2026
08:30am-11:30am & 13:30pm-16:30pm
Mukim Lamunin Tutong
Maintenance of Overhead lines
A part of Kg Bukit Sulang, Kg Bukit Sulang, Kg Menengah, Kg Bang Nukat and surrounding areas
4
Wednesday, 07th January 2026
08:30am-11:30am & 13:30pm-16:30pm
Mukim Lamunin Tutong
Maintenance of Overhead lines
A part of Kg Bukit Sulang, Kg Bukit Sulang, Kg Menengah, Kg Bang Nukat and surrounding areas
5
Thursday, 08th January 2026
08:30am-11:30am & 13:30pm-16:30pm
Mukim Lamunin Tutong
Maintenance of Overhead lines
A part of Kg Bukit Sulang, Kg Bukit Sulang, Kg Menengah, Kg Bang Nukat and surrounding areas
6
Saturday, 10th January 2026
08:30am-11:30am & 13:30pm-16:30pm
Mukim Lamunin Tutong
Maintenance of Overhead lines
A part of Kg Bukit Sulang, Kg Bukit Sulang, Kg Menengah, Kg Bang Nukat and surrounding areas
7
Monday, 12th January 2026
08:30am-11:30am & 13:30pm-16:30pm
Mukim Lamunin Tutong
Maintenance of Overhead lines
A part of Kg Bukit Sulang, Kg Bukit Sulang, Kg Menengah, Kg Bang Nukat and surrounding areas
8
Tuesday, 13th January 2026
08:30am-11:30am & 13:30pm-16:30pm
Mukim Lamunin Tutong
Maintenance of Overhead lines
A part of Kg Bukit Sulang, Kg Bukit Sulang, Kg Menengah, Kg Bang Nukat and surrounding areas
9
Wednesday, 14th January 2026
08:30am-11:30am & 13:30pm-16:30pm
Mukim Lamunin Tutong
Maintenance of Overhead lines
A part of Kg Bukit Sulang, Kg Bukit Sulang, Kg Menengah, Kg Bang Nukat and surrounding areas
10
Thursday, 15th January 2026
08:30am-11:30am & 13:30pm-16:30pm
Mukim Lamunin Tutong
Maintenance of Overhead lines
A part of Kg Bukit Sulang, Kg Bukit Sulang, Kg Menengah, Kg Bang Nukat and surrounding areas
11
Saturday, 17th January 2026
08:30am-11:30am & 13:30pm-16:30pm
Mukim Lamunin Tutong
Maintenance of Overhead lines
A part of Kg Bukit Sulang, Kg Bukit Sulang, Kg Menengah, Kg Bang Nukat and surrounding areas
12
Monday, 19th January 2026
08:30am-11:30am & 13:30pm-16:30pm
Mukim Lamunin Tutong
Maintenance of Overhead lines
A part of Kg Bukit Sulang, Kg Bukit Sulang, Kg Menengah, Kg Bang Nukat and surrounding areas
13
Tuesday, 20th January 2026
08:30am-11:30am & 13:30pm-16:30pm
Mukim Lamunin Tutong
Maintenance of Overhead lines
A part of Kg Bukit Sulang, Kg Bukit Sulang, Kg Menengah, Kg Bang Nukat and surrounding areas
14
Wednesday. 21st January 2026
08:30am-11:30am & 13:30pm-16:30pm
Mukim Lamunin Tutong
Maintenance of Overhead lines
A part of Kg Bukit Sulang, Kg Bukit Sulang, Kg Menengah, Kg Bang Nukat and surrounding areas
15
Thursday, 22nd January 2026
08:30am-11:30am & 13:30pm-16:30pm
Mukim Lamunin Tutong
Maintenance of Overhead lines
A part of Kg Bukit Sulang, Kg Bukit Sulang, Kg Menengah, Kg Bang Nukat and surrounding areas
16
Saturday, 24th January 2026
08:30am-11:30am & 13:30pm-16:30pm
Mukim Lamunin Tutong
Maintenance of Overhead lines
A part of Kg Bukit Sulang, Kg Bukit Sulang, Kg Menengah, Kg Bang Nukat and surrounding areas
17
Monday, 26th January 2026
08:30am-11:30am & 13:30pm-16:30pm
Mukim Lamunin Tutong
Maintenance of Overhead lines
A part of Kg Bukit Sulang, Kg Bukit Sulang, Kg Menengah, Kg Bang Nukat and surrounding areas
18
Tuesday, 27th January 2026
08:30am-11:30am & 13:30pm-16:30pm
Mukim Lamunin Tutong
Maintenance of Overhead lines
A part of Kg Bukit Sulang, Kg Bukit Sulang, Kg Menengah, Kg Bang Nukat and surrounding areas
19
Wednesday. 28th January 2026
08:30am-11:30am & 13:30pm-16:30pm
Mukim Lamunin Tutong
Maintenance of Overhead lines
A part of Kg Bukit Sulang, Kg Bukit Sulang, Kg Menengah, Kg Bang Nukat and surrounding areas
20
Thursday, 29th January 2026
08:30am-11:30am & 13:30pm-16:30pm
Mukim Lamunin Tutong
Maintenance of Overhead lines
A part of Kg Bukit Sulang, Kg Bukit Sulang, Kg Menengah, Kg Bang Nukat and surrounding areas
21
Saturday, 31st January 2026
08:30am-11:30am & 13:30pm-16:30pm
 
Mukim Lamunin Tutong
 
Maintenance of Overhead lines
A part of Kg Bukit Sulang, Kg Bukit Sulang, Kg Menengah, Kg Bang Nukat and surrounding areas
 
22
Wednesday, 07th January 2026
08:30am until finished
Mukim Telisai Tutong
 
Installation of 35ft poles
Along Simpang 1644, Kg Telisai Tutong
23
Thursday, 08th January 2026
08:30am until finished
Mukim Telisai Tutong
Installation of 35ft poles
Along Simpang 1644, Kg Telisai Tutong

24
Tuesday,13th January 2026
08:30am until finished
 
Mukim Keriam, Tutong
Switching the Distribution Feeder Pillar at Substation Bangsingong
Along Simpang 500 until Simpang 617, Kg Keriam Tutong
25
Wednesday,14th January 2026
08:00am until finished
 
Mukim Kiudang, Tutong
Replacement of Ring Main Unit (RMU) at Substation Ideal Hatchery
Ideal Hatchery building, Tutong

 

FEBRUARY 2026
Listed below are the designated areas for the planned maintenance work as for FEBRUARY, 2026:
Bill
Day & Date
Time
Location
Work Description
Affected Areas for Outages
1
Monday, 02nd February 2026
08:30am-11:30am & 13:30pm-16:30pm
Mukim Lamunin Tutong
Maintenance of overhead lines
A part of Kg Bukit Sulang,Kg Menengah,Kg Bang Nukat with affected areas
2
Tuesday,03rd February 2026
08:30am-11:30am & 13:30pm-16:30pm
Mukim Lamunin Tutong
Maintenance of overhead lines
A part of Kg Bukit Sulang,Kg Menengah,Kg Bang Nukat with affected areas
3
Wednesday. 04th February 2026
08:30am-11:30am & 13:30pm-16:30pm
Mukim Lamunin Tutong
Maintenance of overhead lines
A part of Kg Bukit Sulang,Kg Menengah,Kg Bang Nukat with affected areas
4
Thursday, 05th February 2026
08:30am-11:30am & 13:30pm-16:30pm
Mukim Lamunin Tutong
Maintenance of overhead lines
A part of Kg Bukit Sulang,Kg Menengah,Kg Bang Nukat with affected areas
5
Saturday, 07th February 2026
08:30am-11:30am & 13:30pm-16:30pm
Mukim Lamunin Tutong
Maintenance of overhead lines
A part of Kg Bukit Sulang,Kg Menengah,Kg Bang Nukat with affected areas
6
Monday, 09th February 2026
08:30am-11:30am & 13:30pm-16:30pm
Mukim Lamunin Tutong
Maintenance of overhead lines
A part of Kg Bukit Sulang,Kg Menengah,Kg Bang Nukat with affected areas
7
Tuesday, 10th February 2026
08:30am-11:30am & 13:30pm-16:30pm
Mukim Lamunin Tutong
Maintenance of overhead lines
A part of Kg Bukit Sulang,Kg Menengah,Kg Bang Nukat with affected areas
8
Wednesday, 11th February 2026
08:30am-11:30am & 13:30pm-16:30pm
Mukim Lamunin Tutong
Maintenance of overhead lines
A part of Kg Bukit Sulang,Kg Menengah,Kg Bang Nukat with affected areas
9
Thursday, 12th February 2026
08:30am-11:30am & 13:30pm-16:30pm
Mukim Lamunin Tutong
Maintenance of overhead lines
A part of Kg Bukit Sulang,Kg Menengah,Kg Bang Nukat with affected areas
10
Saturday, 14th February 2026
08:30am-11:30am & 13:30pm-16:30pm
Mukim Lamunin Tutong
Maintenance of overhead lines
A part of Kg Bukit Sulang,Kg Menengah,Kg Bang Nukat with affected areas
11
Monday,16th February 2026
08:30am-11:30am & 13:30pm-16:30pm
Mukim Lamunin Tutong
Maintenance of overhead lines
A part of Kg Bukit Sulang,Kg Menengah,Kg Bang Nukat with affected areas
12
Wednesday, 18th February 2026
08:30am-11:30am & 13:30pm-16:30pm
Mukim Lamunin Tutong
Maintenance of overhead lines
A part of Kg Bukit Sulang,Kg Menengah,Kg Bang Nukat with affected areas
13
Monday, 09th February 2026
08:30am-11:30am & 13:30pm-16:30pm
 
Mukim Lamunin Tutong
 
Maintenance of overhead lines
 
A part of Kg Lamunin, Kg Pengkalan Tangsi & Kg layong with effected areas
14
Tuesday, 10th February 2026
08:30am-11:30am & 13:30pm-16:30pm
 
Mukim Lamunin Tutong
 
Maintenance of overhead lines
 
A part of Kg Lamunin, Kg Pengkalan Tangsi & Kg layong with effected areas
 
15
Wednesday, 11th February 2026
08:30am-11:30am & 13:30pm-16:30pm
 
Mukim Lamunin Tutong
 
Maintenance of overhead lines
 
A part of Kg Lamunin, Kg Pengkalan Tangsi & Kg layong with effected areas
 
16
Thursday, 12th Februry 2026
08:30am-11:30am & 13:30pm-16:30pm
 
Mukim Lamunin Tutong
 
Maintenance of overhead lines
 
A part of Kg Lamunin, Kg Pengkalan Tangsi & Kg layong with effected areas
 
17
Saturday, 14th Februry 2026
08:30am-11:30am & 13:30pm-16:30pm
 
Mukim Lamunin Tutong
 
Maintenance of overhead lines
 
A part of Kg Lamunin, Kg Pengkalan Tangsi & Kg layong with effected areas
 
18
Monday, 16th Februry 2026
08:30am-11:30am & 13:30pm-16:30pm
 
Mukim Lamunin Tutong
 
Maintenance of overhead lines
 
A part of Kg Lamunin, Kg Pengkalan Tangsi & Kg layong with effected areas
 
19
Wednesday,18th Februry 2026
08:30am-11:30am & 13:30pm-16:30pm
 
Mukim Lamunin Tutong
 
Maintenance of overhead lines
 
A part of Kg Lamunin, Kg Pengkalan Tangsi & Kg layong with effected areas
 
20
Tuesday, 24th February 2026
08:00am-11:30am 
Mukim Lamunin Tutong
 
Maintenance of overhead lines
 
A part of Kg Lamunin, Kg Pengkalan Tangsi & Kg layong with effected areas
 
21
Wednesday, 25th February 2025
08:00am-11:30am 
 
Mukim Lamunin Tutong
 
Maintenance of overhead lines
 
A part of Kg Lamunin, Kg Pengkalan Tangsi & Kg layong with effected areas
 
22
Thursday, 26th February 2026
08:00am-11:30am 
 
Mukim Lamunin Tutong
 
Maintenance of overhead lines
 
A part of Kg Lamunin, Kg Pengkalan Tangsi & Kg layong with effected areas
 
23
Saturday, 28th February 2026
 
08:00am-11:30am 
 
Mukim Lamunin Tutong
 
Maintenance of overhead lines
 
A part of Kg Lamunin, Kg Pengkalan Tangsi & Kg layong with effected areas
 
 
24
Wednesday, 11th February 2026
08:30pm until finished
 
Mukim Pekan Tutong
 
Replacement of Distribution Feeder Pillar at Substation Balai Polis Tutong.
 
Haji Mohammad Taha building, Perusahaan  Cahaya Pakatan Berhad Filling Station, Spg 50, Spg 64, Spg 66, Kg Sengkarai, Mukim Pekan Tutong.
 

 

MARCH 2026
Listed below are the designated areas for the planned maintenance work as for MARCH, 2026:
Bill
Day & Date
Time
Location
Work Description
Affected Areas for Outages
1
Monday, 02nd March 2026
08:30am – 11:30am
Jalan Batang Mitus,Mukim Kiudang Tutong
Maintenance of low voltage
Along Spg 127 Jalan Batang Mitus dan Spg 705,Spg 713,Spg 721, Spg 723 Kg Kiudang and surrounding areas
2
Tuesday, 03rd March 2026
08:30am – 11:30am
Jalan Batang Mitus,Mukim Kiudang Tutong
Maintenance of low voltage
Along Spg 127 Jalan Batang Mitus dan Spg 705,Spg 713,Spg 721, Spg 723 Kg Kiudang and surrounding areas
3
Wednesday, 04th March 2026
08:30am – 11:30am
Jalan Batang Mitus,Mukim Kiudang Tutong
Maintenance of low voltage
Along Spg 127 Jalan Batang Mitus dan Spg 705,Spg 713,Spg 721, Spg 723 Kg Kiudang and surrounding areas
4
Thursday, 05th March 2026
08:30am – 11:30am
Jalan Batang Mitus,Mukim Kiudang Tutong
Maintenance of low voltage
Along Spg 127 Jalan Batang Mitus dan Spg 705,Spg 713,Spg 721, Spg 723 Kg Kiudang and surrounding areas
5
Monday, 09th March 2026
08:30am – 11:30am
Jalan Batang Mitus,Mukim Kiudang Tutong
Maintenance of low voltage
Along Spg 127 Jalan Batang Mitus dan Spg 705,Spg 713,Spg 721, Spg 723 Kg Kiudang and surrounding areas
6
Tuesday, 10th march 2026
08:30am – 11:30am
Jalan Batang Mitus,Mukim Kiudang Tutong
Maintenance of low voltage
Along Spg 127 Jalan Batang Mitus dan Spg 705,Spg 713,Spg 721, Spg 723 Kg Kiudang and surrounding areas
7
Wednesday, 11th march 2026
08:30am – 11:30am
Jalan Batang Mitus,Mukim Kiudang Tutong
Maintenance of low voltage
Along Spg 127 Jalan Batang Mitus dan Spg 705,Spg 713,Spg 721, Spg 723 Kg Kiudang and surrounding areas
8
Thursday, 12th March 2026
08:30am – 11:30am
Jalan Batang Mitus,Mukim Kiudang Tutong
Maintenance of low voltage
Along Spg 127 Jalan Batang Mitus dan Spg 705,Spg 713,Spg 721, Spg 723 Kg Kiudang and surrounding areas
9
Saturday, 14th March 2026
08:30am – 11:30am
Jalan Batang Mitus,Mukim Kiudang Tutong
Maintenance of low voltage
Along Spg 127 Jalan Batang Mitus dan Spg 705,Spg 713,Spg 721, Spg 723 Kg Kiudang and surrounding areas
10
Monday,16th March 2026
08:30am – 11:30am
Jalan Batang Mitus,Mukim Kiudang Tutong
Maintenance of low voltage
Along Spg 127 Jalan Batang Mitus dan Spg 705,Spg 713,Spg 721, Spg 723 Kg Kiudang and surrounding areas
11
Tuesday, 17th March 2026
08:30am – 11:30am
Jalan Batang Mitus,Mukim Kiudang Tutong
Maintenance of low voltage
Along Spg 127 Jalan Batang Mitus dan Spg 705,Spg 713,Spg 721, Spg 723 Kg Kiudang and surrounding areas
12
Wednesday, 18th March 2026
08:30am – 11:30am
Jalan Batang Mitus,Mukim Kiudang Tutong
Maintenance of low voltage
Along Spg 127 Jalan Batang Mitus dan Spg 705,Spg 713,Spg 721, Spg 723 Kg Kiudang and surrounding areas
13
Thursday, 19th March 2026
08:30am – 11:30am
Jalan Batang Mitus,Mukim Kiudang Tutong
Maintenance of low voltage
Along Spg 127 Jalan Batang Mitus dan Spg 705,Spg 713,Spg 721, Spg 723 Kg Kiudang and surrounding areas
14
Wednesday, 25th March 2026
08:30am – 11:30am & 13:30pm – 16:30pm
Jalan Batang Mitus,Mukim Kiudang Tutong
Maintenance of low voltage
Along Spg 127 Jalan Batang Mitus dan Spg 705,Spg 713,Spg 721, Spg 723 Kg Kiudang and surrounding areas
15
Thursday, 26th March 2026
08:30am – 11:30am & 13:30pm – 16:30pm
Jalan Batang Mitus,Mukim Kiudang Tutong
Maintenance of low voltage
Along Spg 127 Jalan Batang Mitus dan Spg 705,Spg 713,Spg 721, Spg 723 Kg Kiudang and surrounding areas
16
Saturday, 28th March 2026
08:30am – 11:30am & 13:30pm – 16:30pm
Jalan Batang Mitus,Mukim Kiudang Tutong
Maintenance of low voltage
Along Spg 127 Jalan Batang Mitus dan Spg 705,Spg 713,Spg 721, Spg 723 Kg Kiudang and surrounding areas
17
Monday, 30th March 2026
08:30am – 11:30am & 13:30pm – 16:30pm
Jalan Batang Mitus,Mukim Kiudang Tutong
Maintenance of low voltage
Along Spg 127 Jalan Batang Mitus dan Spg 705,Spg 713,Spg 721, Spg 723 Kg Kiudang and surrounding areas
18
Tuesday, 31st March 2026
08:30am – 11:30am & 13:30pm – 16:30pm
Jalan Batang Mitus,Mukim Kiudang Tutong
Maintenance of low voltage
Along Spg 127 Jalan Batang Mitus dan Spg 705,Spg 713,Spg 721, Spg 723 Kg Kiudang and surrounding areas

 

APRIL 2026
Listed below are the designated areas for the planned maintenance work as for APRIL, 2026:

 

BELAIT DISTRICT

JANUARY 2026
Listed below are the designated areas for the planned maintenance work as for JANUARY, 2026:
Bill
Day & Date
Time
Location
Work Description
Affected Areas for Outages
 1
Monday, 12th January 2026

08:00 am to 12:00 noon

01:30 pm to 04:30 pm

Jalan Gates & Jalan Sultan Replacement of Street Lighting Arm Bracket on Electrical Pole Jalan Gates, Jalan Sultan and the surrounding areas
2
Monday, 12th January 2026

08:00 am to 12:00 noon

01:30 pm to 04:30 pm

Part of Jalan Dipa Negara Replacement of Street Lighting Arm Bracket on Electrical Pole Part of Jalan Dipa Negara and the surrounding areas
3
Tuesday, 13th January 2026

08:00 am to 12:00 noon

01:30 pm to 04:30 pm

Part of Jalan Dipa Negara Replacement of Street Lighting Arm Bracket on Electrical Pole Part of Jalan Dipa Negara and the surrounding areas
4
Wednesday, 14th January 2026

08:00 am to 12:00 noon

01:30 pm to 04:30 pm

Part of Jalan Dipa Negara Replacement of Street Lighting Arm Bracket on Electrical Pole Part of Jalan Dipa Negara and the surrounding areas
5
Thursday, 15th January 2026

08:00 am to 12:00 noon

01:30 pm to 04:30 pm

Part of Jalan Dipa Negara Replacement of Street Lighting Arm Bracket on Electrical Pole Part of Jalan Dipa Negara and the surrounding areas
 6
Monday, 19th January 2026

08:00 am to 12:00 noon

01:30 pm to 04:30 pm

Part of Jalan Dipa Negara Replacement of Street Lighting Arm Bracket on Electrical Pole Part of Jalan Dipa Negara and the surrounding areas
 7
Tuesday, 20th January 2026

08:00 am to 12:00 noon

01:30 pm to 04:30 pm

Part of Jalan Dipa Negara Replacement of Street Lighting Arm Bracket on Electrical Pole Part of Jalan Dipa Negara and the surrounding areas
Wednesday, 21st January 2026

08:00 am to 12:00 noon

01:30 pm to 04:30 pm

Part of Jalan Dipa Negara Replacement of Street Lighting Arm Bracket on Electrical Pole Part of Jalan Dipa Negara and the surrounding areas
Wednesday, 21st January 2026 08:00 am to 04:30 pm S/S Jati 2 Replacement of Distribution Feeder pillar Spg 120-48-35-27-12, Spg 120-48-35-27-18, Spg 120-48-35-27-22, Spg 120-48-35-27-28, Spg 120-48-35-27-34, Spg 120-48-35-27-40, Spg 120-48-35-27-46, Spg 120-48-35-27-52. Spg 120-48-35-27-58, Spg 120-48-35-27-64 STKRJ Kg. Mumong, part of Jalan Jaya Indera and the surrounding areas
10
Thursday, 22nd January 2026

08:00 am to 12:00 noon

01:30 pm to 04:30 pm

Part of Jalan Dipa Negara Replacement of Street Lighting Arm Bracket on Electrical Pole Part of Jalan Dipa Negara and the surrounding areas
11
Saturday, 24th January 2026

08:00 am to 12:00 noon

01:30 pm to 04:30 pm

Part of Jalan Dipa Negara Replacement of Street Lighting Arm Bracket on Electrical Pole Part of Jalan Dipa Negara and the surrounding areas
 12
Thursday, 29th January, 2026

08:30 am to 12:00 noon

01:30 pm to 04:30 pm

Jalan Kecil Sungai Taring Lumut Replacement of Electrical Poles and Transfer of Low Voltage Overhead Lines To New Poles Jalan Kecil Sungai Taring Lumut Spg 339, Lumut Police Post, UNN Tower and surrounding areas
13
Saturday, 31st January, 2026

08:30 am to 12:00 noon

01:30 pm to 04:30 pm

Jalan Kecil Sungai Taring Lumut Replacement of Electrical Poles and Transfer of Low Voltage Overhead Lines To New Poles Jalan Kecil Sungai Taring Lumut Spg 339, Lumut Police Post, UNN Tower and surrounding areas
14
Saturday, 31st January 2026

08:30 am to 12:00 noon

01:30 pm to 04:30 pm

Lumut Tersusun Areas Installation of Mini Feeder Pillar Spg 638, Spg 664, Spg 678 Lumut Tersusun and surrounding areas

 

FEBRUARY 2026
Listed below are the designated areas for the planned maintenance work as for FEBRUARY, 2026:
Bill Day & Date Time Location Work Description Affected Areas for Outages
1 Monday, 2nd February, 2026

08:30 am to 12:00 noon

01:30 pm to 04:30 pm

Jalan Kecil Sungai Taring Lumut Replacement Of Electrical Poles and Transfer of Low Voltage Overhead Lines to New Poles Jalan Kecil Sungai Taring Lumut Spg 339, Lumut Police Post, UNN Tower and surrounding areas
2 Monday, 2nd February, 2026

08:00 am to 12:00 noon

01:30 pm to 04:30 pm

Jalan Dipa Negara Replacement of Street Lighting Arm Bracket on Electrical Pole Part of Jalan Dipa Negara and surrounding areas
3 Monday, 2nd February 2026

08:30 am until work completed

(For info, Department of Electrical Services will supply temporary electricity to the affected areas through mobile generator services at the substation)

S/S Kg Baru ERM

 

Maintenance work on 11kV Distribution Transformer

 

Part of Simpang 94, Kg Baru including surrounding areas

 

4 Tuesday, 3rd February 2026

08:00 am to 12:00 noon

01:30 pm to 04:30 pm

Jalan Dipa Negara Replacement of Street Lighting Arm Bracket on Electrical Pole Part of Jalan Dipa Negara and surrounding areas
5

Wednesday, 4th February 2026

08:00 am to 12:00 noon

01:30 pm to 04:30 pm

Jalan Dipa Negara

Replacement of Street Lighting Arm Bracket on Electrical Pole

Part of Jalan Dipa Negara and surrounding areas

6 Wednesday, 4th February 2026

08:30 am until work completed

(For info, Department of Electrical Services will supply temporary electricity to the affected areas through mobile generator services at the substation)

S/S Pembentungan Kg Baru

 

Maintenance work on 11kV Distribution Transformer Pam Pembentungan JKR Kg Baru and surrounding areas
7 Thursday, 5th February 2026

08:00 am to 12:00 noon

01:30 pm to 04:30 pm

Jalan Dipa Negara Replacement of Street Lighting Arm Bracket on Electrical Pole Part of Jalan Dipa Negara and surrounding areas
8 Saturday, 7th February 2026

08:00 am to 12:00 noon

01:30 pm to 04:30 pm

Jalan Dipa Negara Replacement of Street Lighting Arm Bracket on Electrical Pole Part of Jalan Dipa Negara and surrounding areas
9 Saturday, 7th February 2026

08:30 am to 12:00 noon

01:30 pm to 04:30 pm

Lumut Tersusun Stringing of Low Voltage Overhead Cable Spg 638, Spg 664, Spg 678 Lumut Tersusun and surrounding areas
10 Monday, 9th February 2026

08:00 am to 05:30 pm

(Interruption of supply is about 15-30 mins i.e during switching)

MIS Setia Diraja No.1 Maintenance of 11kV Switchgear Part of Jalan Sungai Pandan, Part of Jalan Kerma Negara, Part of Jalan Jaya Negara, Part of Jalan Pandan 4 and Jalan Pandan 5, Majra Apartment Jalan Maulana and surrounding areas
11 Monday, 9th February 2026

08:30 am to 12:00 noon

01:30 pm to 04:30 pm

Jalan Kecil Sungai Taring Lumut Replacement Of Electrical Poles and Transfer of Low Voltage Overhead Lines to New Poles Jalan Kecil Sungai Taring Lumut Spg 339, Lumut Police Post, UNN Tower and surrounding areas
12 Monday, 9th February 2026

08:30 am to 12:00 noon

01:30 pm to 04:30 pm

Jalan Sungai Bera Replacement Of Electrical Poles and Transfer of Low Voltage Overhead Lines to New Poles Spg 94 and Spg 55 Jalan Sungai Bera and surrounding areas
13 Tuesday, 10th February 2026

08:00 am to 05:30 pm

(Interruption of supply is about 15-30 mins i.e during switching)

MIS Setia Diraja No.1 Maintenance of 11kV Switchgear Part of Jalan Sungai Pandan, Part of Jalan Kerma Negara, Part of Jalan Jaya Negara, Part of Jalan Pandan 4 and Jalan Pandan 5, Majra Apartment Jalan Maulana and surrounding areas
14 Tuesday, 10th February 2026

08:30 am to 12:00 noon

01:30 pm to 04:30 pm

Jalan Kecil Sungai Taring Lumut Replacement Of Electrical Poles and Transfer of Low Voltage Overhead Lines to New Poles Jalan Kecil Sungai Taring Lumut Spg 339, Lumut Police Post, UNN Tower and surrounding areas
15 Tuesday, 10th February 2026

08:30 am to 12:00 noon

01:30 pm to 04:30 pm

Jalan Sungai Bera Replacement Of Electrical Poles and Transfer of Low Voltage Overhead Lines to New Poles Spg 94 and Spg 55 Jalan Sungai Bera and surrounding areas
16 Thursday, 26th February 2026

08:30 am to 02:00 pm

1) Spg 1183 Kg Tunggulian

2) Bukit Puan Labi Area

Connection of electrical supply for street lights

1) Spg 1183 Kg Tunggulian

2) Bukit Puan Labi Area

17 Saturday, 28th February 2026

08:30 am to 02:00 pm

1) Spg 1183 Kg Tunggulian

2) Bukit Puan Labi Area

Connection of electrical supply for street lights

1) Spg 1183 Kg Tunggulian

2) Bukit Puan Labi Area

 

MARCH 2026
Listed below are the designated areas for the planned maintenance work as for MARCH, 2026:
Bill Day & Date Time Location Work Description Affected Areas for Outages
1 Monday, 02nd March 2026

08:30 am to 02:00 pm

1) Spg 1183 Kg Tunggulian

2) Bukit Puan Labi Area

Connection of electrical supply for street lights

1) Spg 1183 Kg Tunggulian

2) Bukit Puan Labi Area

2 Tuesday, 03rd March 2026

08:30 am to 02:00 pm

1) Spg 1183 Kg Tunggulian

2) Bukit Puan Labi Area

Connection of electrical supply for street lights

1) Spg 1183 Kg Tunggulian

2) Bukit Puan Labi Area

 

TEMBURONG DISTRICT

DECEMBER 2025
Listed below are the designated areas for the planned maintenance work as for DECEMBER, 2025:
Bill
Day & Date
Time
Location
Work Description
Affected Areas for Outages
1 Tuesday, 16th December 2025

 

9.00 am to 4.30 pm

 

Kg Selapon Maintenance of Overhead Lines Cable Kg Selapon and its surrounding areas.
2 Tuesday, 16th December 2025

8.00 am to 4.30 pm

(For info, Department of Electrical Services will supply temporary electricity to the affected areas through mobile generator services at the substation)

Jambatan Sultan Haji Omar ‘Ali Saifuddin (SOAS) And MIS BTB#1, Sg Besar Maintenance OSS (Package Unit) Mukim Labu, Mukim Batu Apoi and part of Mukim Bangar.
3 Wednesday, 17th December 2025 9.00 am to 4.30 pm Kg Selapon Maintenance of Overhead Lines Cable Kg Selapon and its surrounding areas.
4 Wednesday, 17th December 2025

8.00 am to 4.30 pm

(For info, Department of Electrical Services will supply temporary electricity to the affected areas through mobile generator services at the substation)

Jambatan Sultan Haji Omar ‘Ali Saifuddin (SOAS) And MIS BTB#1, Sg Besar Maintenance OSS (Package Unit) Mukim Labu, Mukim Batu Apoi and part of Mukim Bangar.
5 Thursday, 18th December 2025 9.00 am to 4.30 pm Kg Selapon Maintenance of Overhead Lines Cable Kg Selapon and its surrounding areas.
6 Thursday, 18th December 2025

8.00 am to 4.30 pm

(For info, Department of Electrical Services will supply temporary electricity to the affected areas through mobile generator services at the substation)

Jambatan Sultan Haji Omar ‘Ali Saifuddin (SOAS) And MIS BTB#1, Sg Besar Maintenance OSS (Package Unit) Mukim Labu, Mukim Batu Apoi and part of Mukim Bangar.
7 Tuesday, 23rd December 2025

9.00 am to 3.00 pm

Kg Piasau-piasau Maintenance of Overhead Lines Cable Kg Piasau-piasau and its surrounding areas.
8 Wednesday, 24th December 2025

9.00 am to 3.00 pm

Kg Piasau-piasau Maintenance of Overhead Lines Cable Kg Piasau-piasau and its surrounding areas.

 

JANUARY 2026
Listed below are the designated areas for the planned maintenance work as for JANUARY, 2026:
Bill Day & Date Time Location Work Description Affected Areas for Outages
1 Wednesday, 7th January 2026 9.00 am to 3.00 pm Kg Puni Maintenance of Overhead Lines Cable Part of Kg Puni and surrounding areas
2 Saturday, 10th January 2026 3.00 pm to 5.00 pm Kg Puni and Kg Buda-buda Maintenance of Overhead Lines Cable Part of Kg Puni, Kg Buda-buda and surrounding areas
3 Monday, 12th January 2026 9.00 am to 3.00 pm Kg Negalang Ering Maintenance of Overhead Lines Cable Part of Kg Negalang Ering and surrounding areas
4 Tuesday, 13th January 2026 9.00 am to 3.00 pm Kg Negalang Ering Maintenance of Overhead Lines Cable Part of Kg Negalang Ering and surrounding areas
5 Tuesday, 13th January 2026 10.00 am to 3.00 pm Kg Batang Tuau Maintenance of Overhead Lines Cable Part of Kg Batang Tuau and surrounding areas
6 Thursday, 15th January 2026 9.00 am to 3.00 pm Kg Negalang Ering Maintenance of Overhead Lines Cable Part of Kg Negalang Ering and surrounding areas
7 Thursday, 22nd January 2026 9.00 am to 12.00 pm Kg Senukoh Maintenance of Overhead Lines Cable Part of Kg Senukoh, Spg 221 and surrounding areas
8 Thursday, 22nd January 2026 1.30 pm to 3.00 pm Kg Negalang Ering Maintenance of Overhead Lines Cable Part of Kg Negalang Ering, Spg 637 and surrounding areas
9 Tuesday, 27th January 2026 9.00 am to 3.00 pm Kg Negalang Ering Maintenance of Overhead Lines Cable Part of Kg Negalang Ering, Spg 683, Spg 687, Spg 709, Spg 719 and surrounding areas
10 Wednesday, 28th January 2026 9.00 am to 3.00 pm Kg Negalang Ering Maintenance of Overhead Lines Cable Part of Kg Negalang Ering, Spg 683, Spg 687, Spg 709, Spg 719 and surrounding areas
11 Saturday, 31st January 2026 9.00 am to 12:00 noon and 1.00 pm to 3.00 pm Kg Piasau-piasau Maintenance of Overhead Lines Cable Part of Kg Piasau-piasau and surrounding areas

 

FEBRUARY 2026
Listed below are the designated areas for the planned maintenance work as for FEBRUARY, 2026:
Bill
Day & Date
Time
Location
Work Description
Affected Areas for Outages

1

Tuesday, 3rd February 2026 9.00 am to 3.00 pm Kg Senukoh Maintenance of Overhead Lines Cable Part of Kg Senukoh, Spg 217 and surrounding areas

2

Monday, 9th February 2026 9.00 am to 3.00 pm Kg Selapon Maintenance of Overhead Lines Cable Part of Kg Selapon and surrounding areas

3

Tuesday, 10th February 2026 9.00 am to 3.00 pm Kg Selapon Maintenance of Overhead Lines Cable Part of Kg Selapon and surrounding areas

4

Tuesday, 10th February 2026 1.45 pm to 4.00 pm Kg Batang Tuau Maintenance of Overhead Lines Cable Part of Kg Batang Tuan and surrounding areas

5

Wednesday, 11th February 2026 9.00 am to 3.00 pm Kg Selapon Maintenance of Overhead Lines Cable Part of Kg Selapon and surrounding areas

6

Thursday, 12th February 2026 9.00 am to 3.00 pm Kg Selapon Maintenance of Overhead Lines Cable Part of Kg Selapon and surrounding areas

7

Thursday, 12th February 2026 1.45 pm to 4.00 pm Kg Selangan Maintenance of Overhead Lines Cable Part of Kg Selangan and surrounding areas

8

Saturday, 14th February 2026 9.00 am to 12.00 pm Kg Batu Apoi Maintenance of Overhead Lines Cable Part of Kg Batu Apoi, Spg 525 and surrounding areas