Planned Maintenance Work

BRUNEI MUARA DISTRICT

SEPTEMBER 2026
Listed below are the designated areas for the planned maintenance work as for SEPTEMBER , 2026:
Bill Day & Date Time Location Work Description Affected Areas for Outages
1 Thursday, 03rd September 2026 9.00 am to 3.00 pm Kg. Beribi Dalam Relocated of Overhead Line Cable to New Pole Spg. 122, Kg. Beribi Dalam and its surrounding areas.
2 Saturday, 05th September 2026 9.00 am to 3.00 pm Kg. Bengkurong Maintenance of Overhead Line Spg. 66-109, Kg. Bengkurong and its surrounding areas
3  Thursday, 10th September 2026 9.00 am to 3.00 pm Kg. Tarap Bau  Relocated of Overhead Line Cable  Spg. 27 Kg. Tarap Bau and its surrounding areas. 
4 Thursday, 10th September 2026 9.00 am to 3.00 pm Kg. Beribi Dalam Relocated of Overhead Line Cable to New Pole Spg. 122 Kg, Beribi Dalam and its surrounding areas.
5 Thursday, 10th September 2026 

 9.00 am to 5.00 pm

(For info, Department of Electrical Services will supply temporary electricity to the affected areas through mobile generator services at the substation)

 Sub-Station Kasat/Putat #2 Maintenance of Distribution Transformer Kasat/Putat #2 and its surrounding areas.
6 Friday, 11th September 2026

 9.00 am to 5.00 pm

(For info, Department of Electrical Services will supply temporary electricity to the affected areas through mobile generator services at the substation)

 

Sub-Station Block 2G Bgn. Kementerian Kesihatan Jln Ong Sum Ping Maintenance of Distribution Transformer Block 2G Bgn. Kementerian Kesihatan Jln Ong Sum Ping and its surrounding areas.
7 Saturday, 12th September 2026 9.00 am to 3.00 pm Kg. Bengkurong Maintenance of Overhead Lines Cable Spg. 66-109 Kg. Bengkurong and its surrounding areas.
8 Monday, 14th September 2026 8.00 am until works completed Kg. Tanjong Bunut Maintenance of Overhead Lines Spg. 1244 to Spg. 1244-19, Kg. Tanjong Bunut and its surrounding areas.
 9 Tuesday, 15th September 2026 9.00 am to 3.00 pm Kg. Mangis Dua Installation of Cable to Mini Feeder Pillar  Spg. 58, Kg. Manggis Dua and its surrounding areas. 
10 Tuesday, 15th September 2026 8.00 am until works completed Kg. Tanjong Bunut  Maintenance of Overhead Lines  Spg. 1244-37 to Spg. 842-102, Jalan Bukit Silat, Kg. Tanjong Bunut and its surrounding areas.
11  Wednesday, 16th September 2026  9.00 am to 3.00 pm  Kg. Sg. Akar  Maintenance of Overhead Lines Cable Spg. 204-9 Kg. Sg. Akar and its surrounding areas. 
12 Wednesday, 16th September 2026  8.00 am until works completed Kg. Kilanas Maintenance of Overhead Lines Spg. 17 to Spg. 70, Jalan Bebatik Kilanas, Kg. Kilanas and its surrounding areas.
13 Thursday, 17th September 2026 9.00 am to 3.00 pm  Jln Kebangsaan Lama Maintenance of Overhead Lines Cable Spg. 570, Spg. 524 Jln Kebangsaan Lama and its surrounding areas.
14 Thursday, 17th September 2026 8.00 am until works completed Kg. Kilanas  Maintenance of Overhead Lines  Spg. 93 to Spg. 117,  Jalan Bebatik Kilanas, Kg. Kilanas and its surrounding areas.
15 Saturday, 19th September 2026 9.00 am to 3.00 pm Kg. Kasat Stringing of New Overhead Line Cable Spg. 518 Kg. Kasat and its surrounding areas.
16 Saturday, 19th September 2026

9.00 am to 5.00 pm

(For info, Department of Electrical Services will supply temporary electricity to the affected areas through mobile generator services at the substation)

Sub-Station Bgn Block 2C Jln Ong Sum Ping Maintenance of Distribution Transformer Block 2C Bgn JCHS Jln Ong Sum Ping
17 Monday, 21st September 2026 9.00 am to 3.00 pm Masjid Pulaie Maintenance of Overhead Lines Cable Spg. 78, Masjid Pulaie and its surrounding areas.
18 Monday, 21st September 2026

9.00 am to 5.00 pm

(For info, Department of Electrical Services will supply temporary electricity to the affected areas through mobile generator services at the substation)

Sub-Station Tungku 1 Replacement of Ring Main Unit (RMU) Kg. Tungku 1 and its surrounding areas.
19 Monday, 21st September 2026 9.00 am to 3.00 pm Kg. Manggis Dua Installation of Cable to Mini Feeder Pillar Spg. 58 Kg. Manggis Dua and its surrounding areas.
20 Monday, 21st September 2026 9.00 am to 4.00 pm Kg. Jangsak Replacement of Mini Feeder Pillar (MFP) Spg. 779, Kg. Jangsak and its surrounding areas.
21 Monday, 21st September 2026 8.00 am until works completed Kg. Kilanas Maintenance of Overhead Lines Cable Spg. 94 to Spg. 132 Jalan Bebatik Kilanas, Kg. Kilanas and its surrounding areas.
22 Monday, 21st September 2026 8.00 am to 4.30 pm Jalan Utama Berakas Replacement of Mini Feeder Pillar (MFP) Spg. 86, Jalan Utama Berakas and its surrounding areas.
23 Monday, 21st September 2026 9.00 am to 2.00 pm Kg. Tanjung Nangka Installation of Stay Wire for Electric Poles Jalan Seri Pahlawan, Kg. Tanjung Nangka around after Spg. 1626-41 to Spg. 1626-206 Kg. Tanjung Nangka and its surrounding areas.
24 Monday, 21st September 2026 9.00 am to 12.00 noon Kg. Kulapis Wayleave Maintenance Spg. 251, Kg. Kulapis and its surrounding area.
25 Tuesday, 22nd September 2026 9.00 am to 3.00 pm Kg. Anggerek Desa Maintenance of Overhead Lines Cable Spg. 88, Kg. Anggerek Desa and its surrounding areas.
26 Tuesday, 22nd September 2026 8.00 am until works completed Kg, Kilanas Maintenance of Overhead Lines Cable Spg. 117 to Spg. 136, Jalan Bebatik Kilanas, Kg. Kilanas and its surrounding areas.
27 Wednesday, 23rd September 2026 9.00 am to 3.00 pm Kg. Delima Dua Maintenance of Overhead Lines Cable Spg. 94-19 Kg. Delima Dua and its surrounding areas.
28 Wednesday, 23rd September 2026

9.00 am to 5.00 pm

(For info, Department of Electrical Services will supply temporary electricity to the affected areas through mobile generator services at the substation)

Sub-Station Spg. 185-82-32 Kg. Katok Replacement of Ring Main Unit (RMU) Spg. 185-82-32 Kg. Katok and its surrounding areas.
29 Wednesday, 23rd September 2026 9.00 am to 12.00 noon Kg. Kulapis Wayleave Maintenance Spg. 229, Kg. Kulapis and its surrounding areas.
30 Thursday, 24th September 2026 9.00 am to 3.00 pm Jalan Kustin Maintenance of Overhead Lines Cable Jalan Kustin and its surrounding areas.
31 Thursday, 24th September 2026

9.00 am to 5.00 pm

(For info, Department of Electrical Services will supply temporary electricity to the affected areas through mobile generator services at the substation)

Sub-Station Spg. 185-82-32 Kg. Katok Replacement of Ring Main Unit (RMU) Spg. 185-82-32 Kg. Katok and its surrounding areas.
32 Thursday, 24th September 2026 9.00 am to 12.00 noon Kg. Kulapis Wayleave Maintenance Spg. 240, Kg. Kulapis and its surrounding areas.
33 Thursday, 24th September 2026 8.00 am until works completed Kg. Kilanas Maintenance of Overhead Lines Cable Spg. 148 to Spg. 178, Jalan Bebatik Kilanas, Kg. Kilanas and its surrounding areas.
34 Thursday, 24th September 2026 9.00 am to 3.00 pm RPN Kg. Rimba Replacement of Mini Feeder Pillar Spg. 49-6-13, Jalan 60, RPN Kg. Rimba and its surrounding areas.
35 Thursday, 24th September 2026 9.00 am to 1.00 pm Jalan Bebatik Kulapis Maintenance of Low Voltage Overhead Line After Spg. 121 to Spg. 240, Jln Bebatik Kulapis, Kawasan Kemajuan Pertanian Tanah Tuah and its surrounding areas.
36 Thursday, 24th September 2026 9.00 am to 3.00 pm Kg. Tarap Bau Relocated of Overhead Line Cable Spg. 27, Kg. Tarap Bau and its surrounding areas.
37 Saturday, 26th September 2026 9.00 am to 3.00 pm Kg. Bengkurong Relocated of Overhead Line Cable Spg. 71, Kg. Bengkurong and its surrounding areas.
38 Saturday, 26th September 2026 8.00 am to 6.00 pm Jalan Bebatik Kulapis Maintenance of Low Voltage Overhead Line After Spg. 121 to Spg. 240, Jln Bebatik Kulapis, Kawasan Kemajuan Pertanian Tanah Tuah and its surrounding areas.
39 Monday, 28th September 2026

9.00 am to 5.00 pm

(For info, Department of Electrical Services will supply temporary electricity to the affected areas through mobile generator services at the substation)

Sub-Station Masjid Kg. Kapok Maintenance of Distribution Transformer Masjid Kg. Kapok and its surrounding areas.
40 Monday, 28th September 2026 9.00 am to 12.00 noon Kg. Kulapis Wayleave Maintenance At the end of Spg. 99, Kg. Kulapis and its surrounding areas.
41 Monday, 28th September 2026 9.00 am to 12.00 noon Kg. Kilanas Maintenance of Overhead Lines Cable Spg. 242 to Spg. 255, Jalan Bebatik Kilanas, Kg. Kilanas and its surrounding areas.
42 Monday, 28th September 2026 9.00 am to 3.00 pm Kg. Manggis 2 Installation of Mini Feeder Pillar Spg. 58 Kg. Manggis 2 and its surrounding areas.
43 Tuesday, 29th September 2026 8.00 am until works completed Kg. Bebatik Maintenance of Overhead Lines Cable Spg. 406 to Spg.  444, Jalan Mulaut, Kg. Bebatik and its surrounding areas.
44 Wednesday, 30th September 2026

9.00 am to 5.00 pm

(For info, Department of Electrical Services will supply temporary electricity to the affected areas through mobile generator services at the substation)

 

Main Intake Station RTB Serasa Maintenance of Distribution Transformer Main Intake Station RTB Serasa and its surrounding areas.
45 Wednesday, 30th September 2026 8.00 am until works completed Kg. Bebatik Maintenance of Overhead Lines Cable Spg. 21 to Spg. 36, Jalan Bebatik Kulapis, Kg. Bebatik and its surrounding areas.
46 Wednesday, 30th September 2026 9.00 am to 12.00 noon Kg. Mulaut Wayleave Maintenance Spg. 228, Kg. Mulaut and its surrounding areas.

 

 

OCTOBER 2026
Listed below are the designated areas for the planned maintenance work as for OCTOBER , 2026:
Bill Day & Date Time Location Work Description Affected Areas for Outages
1

Thursday,

01st October 2026

9.00 am to 12.00 noon Kg. Mulaut Wayleave Maintenance Spg. 259, Kg. Mulaut and its surrounding areas.
2

Thursday,

01st October 2026

8.00 am until works completed Kg. Bebatik Maintenance of Overhead Lines Spg. 37, Jalan Bebatik Kulapis, Kg. Bebatik and its surrounding areas.
 3

Thursday,

01st October 2026

9.00 am to 3.00 pm Kg. Mata-Mata Replacement of Overhead Line Cable Spg. 74-36 Kg. Mata-Mata and its surrounding areas.
4

Thursday,

01st October 2026

 

9.00 am to 5.00 pm

(For info, Department of Electrical Services will supply temporary electricity to the affected areas through mobile generator services at the substation)

Sub-Station Spg. 235 Jalan Jerudong Replacement of Ring Main Unit Spg. 235 Jalan Jerudong and its surrounding areas.
5

Saturday,

03rd October 2026

9.00 am to 3.00 pm Kg. Manggis 2 Installation of New Mini Feeder Pillar Spg. 58 Kg. Manggis 2 and its surrounding areas.
6 

Monday,

05th October 2026

9.00 am to 12.00 noon Kg. Mulaut Wayleave Maintenance  Spg. 353, Kg. Mulaut and its surrounding areas. 
7 

Monday,

05th October 2026

9.00 am to 3.00 pm Kg. Mata-Mata Replacement of Overhead Line Cable Spg. 74-41-6 Kg. Mata-Mata and its surrounding areas.
8

Monday,

05th October 2026

 

9.00 am to 3.00 pm Kg. Lambak Kanan Replacement and Relocated of Overhead Line Cable  Spg. 57-10-32-5 Jln 64 Kg. Lambak Kanan and its surrounding areas.
9

Monday,

05th October 2026

 

9.00 am to 4.00 pm Kg. Perpindahan Rimba Replacement of Mini Feeder Pillar (MFP) Jalan 60, Simpang 21 Kg. Perpindahan Rimba and its surrounding areas.
10

Monday,

05th October 2026

 

9.00 am to 5.00 pm

(For info, Department of Electrical Services will supply temporary electricity to the affected areas through mobile generator services at the substation)

Sub-Station Tanjung Nangka 2 Replacement of Ring Main Unit Tanjung Nangka 2 and its surrounding areas.
11

Tuesday,

06th October 2026

9.00 am to 3.00 pm Kg. Mata-Mata Replacement of Overhead Line Cable Spg. 74-41-31-17 Kg. Mata-Mata and its surrounding areas.
12

Wednesday,

07th October 2026

9.00 am to 12.00 noon Kg. Mulaut Wayleave Maintenance  Spg. 56, Kg. Mulaut, Tanjung Nangka and its surrounding areas.
13

Wednesday,

07th October 2026

9.00 am to 3.00 pm Kg. Delima Dua Replacement of Overhead Line Cable Spg. 94-19 Kg. Delima Dua and its surrounding areas.
14

Saturday,

10th October 2026

9.00 am to 5.00 pm Kg. Delima Dua Replacement of Overhead Line Cable Spg. 95-19, Kg. Delima Dua and its surrounding areas.
15

Sunday, 

11th October 2026

9.00 am to 5.00 pm

(For info, Department of Electrical Services will supply temporary electricity to the affected areas through mobile generator services at the substation)

Sub-Station Baiduri Bank, Kiarong Replacement of Ring Main Unit Bgn. Baiduri Bank Kiarong and its surrounding areas.
16

Monday,

12th October 2026

9.00 am to 5.00 pm

(For info, Department of Electrical Services will supply temporary electricity to the affected areas through mobile generator services at the substation)

 

Sub-Station Mawar Desa Villa Replacement of Ring Main Unit Mawar Desa Villa Tanjong Nangka and its surrounding areas.
17

Monday,

12th October 2026

 

9.00 am to 3.00 pm Kg. Saba Darat ‘A’, Kg. Ayer Relocated of Overhead Line Cable to New Pole Kg. Saba Darat ‘A’, Kg. Ayer and its surrounding areas.
18

Tuesday,

13th October 2026

9.00 am to 4.00 pm Kg. Tagap Selayun  Relocated of Low Voltage Overhead Line After Spg. 124 to Spg. 177, Kg. Tagap Selayun, Jalan Sengkurong A/B and its surrounding areas.
19

Wednesday,

14th October 2026

9.00 am to 5.00 pm

(For info, Department of Electrical Services will supply temporary electricity to the affected areas through mobile generator services at the substation)

Sub-Station Fire Brigade Jerudong Replacement of Ring Main Unit Fire Brigade Jerudong and its surrounding areas.
20

Wednesday,

14th October 2026

9.00 am to 4.00 pm Kg. Mata-Mata Maintenance of Underground Cable Spg. 207-3-16, Kg. Mata-Mata Gadong and its surrounding areas.
21

Friday,

16th October 2026

9.00 am to 5.00 pm

(For info, Department of Electrical Services will supply temporary electricity to the affected areas through mobile generator services at the substation)

 

Sub-Station Sg. Besar #1 (Opp Klinik Sg. Besar) Maintenance of Distribution Transformer Spg. 51, Sekolah Rendah Sultan Abdul Bubin and its surrounding areas
22

Saturday,

17th October 2026

9.00 am to 4.00 pm Kg. Junjongan Replacement of Mini Feeder Pillar (MFP) No. 3 Spg. 2171-29-8, Kg. Junjongan and its surrounding areas.
23

Monday,

19th Oktober 2026

9.00 am to 3.00 pm Kg. Mulaut Relocated of Cable by JKR Jalan Mulaut Limau Manis, Kg. Mulaut, around before Spg. 343 downwards Spg. 300 Jln Lempaki and its surrounding areas.
24

Tuesday,

20th October 2026

9.00 am to 5.00 pm

(For info, Department of Electrical Services will supply temporary electricity to the affected areas through mobile generator services at the substation)

 

Sub-Station Spg. 279 Kg. Kapok Maintenance of Distribution Transformer Spg. 279 Kg. Kapok and its surrounding areas.
25

Wednesday,

21st October 2026

9.00 am to 4.00 pm STKRJ Kg. Mata-Mata Replacement of Mini Feeder Pillar (MFP) Simpang 207-3-16, STKRJ Kg. Mata-Mata and its surrounding areas.
26

Wednesday,

21st October 2026

 

9.00 am to 4.00 pm Kg. Sungai Besar Replacement of Mini Feeder Pillar (MFP) Simpang 461. Kg. Sungai Besar, Jln Kota Batu and its surrounding areas.
27

Thursday,

22th October 2026

9.00 am to 5.00 pm

(For info, Department of Electrical Services will supply temporary electricity to the affected areas through mobile generator services at the substation)

 

Sub-Station Spg. 361 Kg. Kapok Maintenance of Distribution Transformer Spg. 361 Kg. Kapok and its surrounding areas.
28

Thursday,

22th October 2026

 

9.00 am to 4.30 pm Kg. Tanjong Nangka Installation of Sub DFP Jln Jerudong Baru, Kg. Tanjung Nangka and its surrounding area.
29

Thursday,

22th October 2026

 

9.00 am to 3.00 pm Kg. Sg. Matan Maintenance of Overhead Line Cable Spg. 700 Kg. Sg. Matan and its surrounding areas.
30

Monday,

26th October 2026

9.00 am to 5.00 pm

(For info, Department of Electrical Services will supply temporary electricity to the affected areas through mobile generator services at the substation)

Sub-Station Bgn. Hj Naim, Menglait Replacement of Ring Main Unit Bgn Hj Naim, Menglait and its surrounding areas.
31

Tuesday,

27th October 2026

9.00 am to 3.00 pm Kg. Tanjong Nangka Jointing of Low Voltage Cable at Sub-Station Jalan Jerudong Baru, Kg. Tanjong Nangka and its surrounding areas.
32

Wednesday,

28th October 2026

9.00 am to 5.00 pm

(For info, Department of Electrical Services will supply temporary electricity to the affected areas through mobile generator services at the substation)

Sub-Station Bee Garden, Tanjong Nangka Replacement of Ring Main Unit Spg. 1761 Kg. Tanjong Nangka and its surrounding areas.

 

NOVEMBER 2026
Listed below are the designated areas for the planned maintenance work as for NOVEMBER , 2026:
Bill Day & Date Time Location Work Description Affected Areas for Outages
1

Wednesday,

04th November 2026

 

9.00 am to 5.00 pm

(For info, Department of Electrical Services will supply temporary electricity to the affected areas through mobile generator services at the substation)

S/S 162-8-18-29 Kg. Tungku Replacement of Ring Main Unit (RMU) Spg. 162-8-18-29 Kg. Tungku and its surrounding areas.
2

Wednesday,

04th November 2026

9.00 am to 4.30 pm Kg. Bebatik Kulapis Maintenance and Installation of ABC Cable to Overhead Line Pole Kg. Bebatik Kulapis and its surrounding areas.
3

Thursday,

05th November 2026

9.00 am to 4.30 pm Kg. Bebatik Kulapis Maintenance and Installation of ABC Cable to Overhead Line Pole Kg. Bebatik Kulapis and its surrounding areas.
 4

Thursday,

05th November 2026

9.00 am to 4.00 pm  Kg. Junjongan  Replacement of Mini Feeder Pillar (MFP) Spg. 2171, Kg. Junjongan and its surrounding areas. 
 5

Thursday,

05th November 2026

9.00 am to 4.00 pm Jalan Bebatik Kilanas Replacement of Mini Feeder Pillar (MFP) Spg. 200, Jalan Bebatik Kilanas and its surrounding areas. 
6

Monday,

09th November 2026

9.00 am to 5.00 pm

(For info, Department of Electrical Services will supply temporary electricity to the affected areas through mobile generator services at the substation)

S/S Spg. 705 Kg. Sg. Buloh Replacement of Ring Main Unit Spg. 705 Kg. Sg. Buloh and its surrounding areas.
7

Thursday,

12th November 2026

9.00 am to 5.00 pm

(For info, Department of Electrical Services will supply temporary electricity to the affected areas through mobile generator services at the substation)

 

S/S Kompleks Hj Daud Gadong Maintenance of Distribution Transformer Kompleks Hj Daud Gadong and its surrounding areas.
8

Thursday,

19th Nvember 2026

9.00 am to 4.00 pm Kg. Tamoi Relocate of Overhead Line Cable to New Pole Kg. Tamoi and its surrounding areas.
9

Friday,

20th November 2026

9.00 am to 5.00 pm

(For info, Department of Electrical Services will supply temporary electricity to the affected areas through mobile generator services at the substation)

 

S/S Mulaut Lampaki Maintenance of Distribution Transformer Jalan Kecil Mulaut Lampaki and its surrounding areas.
10

Sunday,

22nd November 2026

9.00 am to 4.00 pm Sek. Tinggi Arab Laki-Laki Hassanal Bolkiah Replacement of Distribution Feeder Pillar Sek. Tinggi Arab Laki-Laki Hassanal Bolkiah, Jln Pehin Dato Menteri Sheikh Hj Abd Rahman and its surrounding areas.
11

Wednesday,

24th November 2026

9.00 am to 4.00 pm Kg. Subok Replacement of Mini Feeder Pillar Spg. 339-13-19, Kg. Subok and its surrounding areas
12

Wednesday,

24th November 2026

 

9.00 am to 4.00 pm Kg. Mata-Mata Replacement of Mini Feeder Pillar Spg. 52-74, Kg. Mata-Mata, Gadong and its surrounding areas.
13

Wednesday,

25th November 2026

9.00 am to 4.00 pm Jalan Pasir Berakas Replacement of Distribution Feeder Pillar 800Amp Spg. 225 Jalan Pasir Berakas and its surrounding areas.
14

Saturday,

28th November 2026

9.00 am to 5.00 pm Jalan Elizabeth 2 Replacement of Distribution Feeder Pillar 600Amp Jalan Elizabeth 2 and its surrounding areas.
15

Monday,

30th November 2026

9.00 am to 4.00 pm Kg. Rimba Replacement of Distribution Feeder Pillar 1200Amp Spg. 256-45-26 Kg. Rimba and its surrounding areas.

 

DECEMBER 2026
Listed below are the designated areas for the planned maintenance work as for DECEMBER , 2026:
Bill Day & Date Time Location Work Description Affected Areas for Outages
1
2
         

 

TUTONG DISTRICT

SEPTEMBER 2026
Listed below are the designated areas for the planned maintenance work as for SEPTEMBER, 2026:
BILL DAY & DATE TIME LOCATION WORK DESCRIPTION AFFECTED AREAS OF OUTRAGE
1 Tuesday, 1st September 2026 08:00 until finished Kg Bukit, Tutong Rectification of PD at Substation Kg Bukit #2  A part of Kg Ukong Tutong
2 Wednesday, 2nd September 2026 08:00 until finished Kg Merimbun, Tutong Rectification of PD at Substation Kg Merimbun A part of Kg Merimbun, Tutong
3 Thursday, 03rd September 2026 08:00 until finished Kg Pengkalan Piasau Tutong Maintenance of Distribution Transformer (TX) at Substation Pengkalan Piasau A part of Kg Pengkalan Piasau and surrounding areas
4 Monday, 07th September 2026 08:00 until finished Jalan Binturan Kem Maintenance of 11 000 k V Electrical equipment at Substation Package Unit Huighway #2, Binturan Kem A part of Kg Bukit Panggal
5 Saturday, 12th September 2026 08:00 until finished Kg Bukit Udal Tutong Maintenance of Distribution Transformer (TX) at Substation Bukit Udal #2 A part of Kg Bukit Udal and surrounding areas
6 Tuesday, 15th September 2026 08:00 until finished Kg Bekiau Replacement work of the 11,000 overhead line at Jalan Kecil Bekiau. A part of Kg Bekiau
7 Wednesday, 16th September 2026 08:00 until finished Kg Bekiau Replacement work of the 11,000 overhead line at Jalan Kecil Bekiau. A part of Kg Bekiau
8 Thursday, 17th September 2026 08:00 until finished Kg Bekiau Replacement work of the 11,000 overhead line at Jalan Kecil Bekiau. A part of Kg Bekiau
9 Thursday, 17th September 2026 08:00 until finished Kg Luagan Timbaran Replacement of Distribution Feeder Pillar (DFP) at Substation Luagan Timbaran From Spg 142 to Spg 158 and surrounding areas.
10 Friday, 18th September 2026 08:00 until finished Kg Bekiau Replacement work of the 11,000 overhead line at Jalan Kecil Bekiau. A part of Kg Bekiau
11 Saturday, 19th September 2026 08:00 until finished Kg Bekiau Replacement work of the 11,000 overhead line at Jalan Kecil Bekiau. A part of Kg Bekiau
12 Sunday, 20th September 2026 08:00 until finished Kg Bekiau Replacement work of the 11,000 overhead line at Jalan Kecil Bekiau. A part of Kg Bekiau
13 Monday, 21st September 2026 08:00 until finished Kg Bekiau Replacement work of the 11,000 overhead line at Jalan Kecil Bekiau. A part of Kg Bekiau
14 Tuesday, 22nd September 2026 08:00 until finished Kg Bekiau Replacement work of the 11,000 overhead line at Jalan Kecil Bekiau. A part of Kg Bekiau
15 Wednesday, 23rd September 2026 08:00 until finished Kg Bekiau Replacement work of the 11,000 overhead line at Jalan Kecil Bekiau. A part of Kg Bekiau
16 Thursday, 24th September 2026 08:00 until finished Kg Bukit Sulang Tutong Maintenance of Distribution Transformer (TX) at Substation Spg 3 Bukit Sulang A part of Kg Bukit Sulang and surrounding areas
17 Thursday, 24th September 2026 08:00 until finished Kg Bekiau Replacement work of the 11,000 overhead line at Jalan Kecil Bekiau. A part of Kg Bekiau
18 Friday, 25th September 2026 08:00 until finished Kg Bekiau Replacement work of the 11,000 overhead line at Jalan Kecil Bekiau. A part of Kg Bekiau
19 Saturday, 26th September 2026 08:00 until finished Kg Bekiau Replacement work of the 11,000 overhead line at Jalan Kecil Bekiau. A part of Kg Bekiau
20 Sunday, 27th September 2026 08:00 until finished Kg Bekiau Replacement work of the 11,000 overhead line at Jalan Kecil Bekiau. A part of Kg Bekiau
21 Monday, 28th September 2026 08:00 until finished Kg Bekiau Replacement work of the 11,000 overhead line at Jalan Kecil Bekiau. A part of Kg Bekiau
22 Tuesday, 29th September 2026 08:00 until finished Kg Bukit Tutong Maintenance of Distribution Transformer (TX) at Substation Kg Bukit #3 A part of Kg Bukit and surrounding areas
23 Tuesday, 29th September 2026 08:00 until finished Kg Bekiau Replacement work of the 11,000 overhead line at Jalan Kecil Bekiau. A part of Kg Bekiau
24 Wednesday, 30th September 2026 08:00 until finished Kg Bekiau Replacement work of the 11,000 overhead line at Jalan Kecil Bekiau. A part of Kg Bekiau

 

OCTOBER 2026
Listed below are the designated areas for the planned maintenance work as for OCTOBER, 2026:
BILL DAY & DATE TIME LOCATION WORK DESCRIPTION AFFECTED AREAS OF OUTRAGE
1 Thursday, 08th October 2026 09:00am until 16:30pm Kg Serambangun Maintenance Distribution Transformer (TX) at Substation Hj Junaidi Serambangun  A part of Kg Serambangun
2 Thursday, 15th October 2026 09:00am until 16:30pm Kg Mungkom Dalam Maintenance Distribution Transformer (TX) at Substation Mungkom Dalam A part of Kg Mungkom Dalam
3 Saturday, 17th October 2026 09:00am until 16:30pm Kg Bukit Sulang Maintenance Distribution Transformer (TX) at Substation Spg 3 Bukit Sulang

 

A part of Kg Bukit Sulang

4 Thursday, 24th October 2026 09:00am until 16:30pm Kg Long Mayan Maintenance Distribution Transformer (TX) at Substation Long Mayan #3 A part of Kg Long Mayan
5 Thursday, 29th October 2026 09:00am until 16:30pm Kg Bukit Udal Maintenance Distribution Transformer (TX) at Substation Bukit Udal #1 A part of Bukit Udal

 

NOVEMBER 2026
Listed below are the designated areas for the planned maintenance work as for NOVEMBER, 2026:
BILL DAY & DATE TIME LOCATION WORK DESCRIPTION AFFECTED AREAS OF OUTRAGE
1 Monday, 2nd November 2026 08:30 until work completed Kg Pengkalan Mau and Kg Kiudang, Mukim Kiudang, Tutong Replacement of 11kV Aerial Cable Kg Pengkalan Mau (partially) and Kg Kiudang (partially), Mukim Kiudang, Tutong
2 Tuesday, 3rd November 2026 08:30 until work completed Kg Pengkalan Mau and Kg Kiudang, Mukim Kiudang, Tutong Replacement of 11kV Aerial Cable Kg Pengkalan Mau (partially) and Kg Kiudang (partially), Mukim Kiudang, Tutong
3 Wednesday, 4th November 2026 08:30 until work completed Kg Pengkalan Mau and Kg Kiudang, Mukim Kiudang, Tutong Replacement of 11kV Aerial Cable Kg Pengkalan Mau (partially) and Kg Kiudang (partially), Mukim Kiudang, Tutong
4 Thursday, 5th November 2026 08:30 until work completed Kg Pengkalan Mau and Kg Kiudang, Mukim Kiudang, Tutong Replacement of 11kV Aerial Cable Kg Pengkalan Mau (partially) and Kg Kiudang (partially), Mukim Kiudang, Tutong
5 Saturday, 7th November 2026 08:30 until work completed Kg Pengkalan Mau and Kg Kiudang, Mukim Kiudang, Tutong Replacement of 11kV Aerial Cable Kg Pengkalan Mau (partially) and Kg Kiudang (partially), Mukim Kiudang, Tutong
6 Monday, 9th November 2026 08:30 until work completed Kg Pengkalan Mau and Kg Kiudang, Mukim Kiudang, Tutong Replacement of 11kV Aerial Cable Kg Pengkalan Mau (partially) and Kg Kiudang (partially), Mukim Kiudang, Tutong
7 Tuesday, 10th November 2026 08:30 until work completed Kg Pengkalan Mau and Kg Kiudang, Mukim Kiudang, Tutong Replacement of 11kV Aerial Cable Kg Pengkalan Mau (partially) and Kg Kiudang (partially), Mukim Kiudang, Tutong
8 Wednesday, 11th November 2026 08:30 until work completed Kg Pengkalan Mau and Kg Kiudang, Mukim Kiudang, Tutong Replacement of 11kV Aerial Cable Kg Pengkalan Mau (partially) and Kg Kiudang (partially), Mukim Kiudang, Tutong
9 Thursday, 12th November 2026 08:30 until work completed Kg Pengkalan Mau and Kg Kiudang, Mukim Kiudang, Tutong Replacement of 11kV Aerial Cable Kg Pengkalan Mau (partially) and Kg Kiudang (partially), Mukim Kiudang, Tutong
10 Saturday, 14th November 2026 08:30 until work completed Kg Pengkalan Mau and Kg Kiudang, Mukim Kiudang, Tutong Replacement of 11kV Aerial Cable Kg Pengkalan Mau (partially) and Kg Kiudang (partially), Mukim Kiudang, Tutong
11 Monday, 16th November 2026 08:30 until work completed Kg Pengkalan Mau and Kg Kiudang, Mukim Kiudang, Tutong Replacement of 11kV Aerial Cable Kg Pengkalan Mau (partially) and Kg Kiudang (partially), Mukim Kiudang, Tutong
12 Tuesday, 17th November 2026 08:30 until work completed Kg Pengkalan Mau and Kg Kiudang, Mukim Kiudang, Tutong Replacement of 11kV Aerial Cable Kg Pengkalan Mau (partially) and Kg Kiudang (partially), Mukim Kiudang, Tutong
13 Wednesday, 18th November 2026 08:30 until work completed Kg Pengkalan Mau and Kg Kiudang, Mukim Kiudang, Tutong Replacement of 11kV Aerial Cable Kg Pengkalan Mau (partially) and Kg Kiudang (partially), Mukim Kiudang, Tutong
14 Thurday, 19th November 2026 08:30 until work completed Kg Pengkalan Mau and Kg Kiudang, Mukim Kiudang, Tutong Replacement of 11kV Aerial Cable Kg Pengkalan Mau (partially) and Kg Kiudang (partially), Mukim Kiudang, Tutong
15 Saturday, 21st November 2026 08:30 until work completed Kg Pengkalan Mau and Kg Kiudang, Mukim Kiudang, Tutong Replacement of 11kV Aerial Cable Kg Pengkalan Mau (partially) and Kg Kiudang (partially), Mukim Kiudang, Tutong
16 Monday, 23rd November 2026 08:30 until work completed Kg Pengkalan Mau and Kg Kiudang, Mukim Kiudang, Tutong Replacement of 11kV Aerial Cable Kg Pengkalan Mau (partially) and Kg Kiudang (partially), Mukim Kiudang, Tutong
17 Tuesday, 24th November 2026 08:30 until work completed Kg Pengkalan Mau and Kg Kiudang, Mukim Kiudang, Tutong Replacement of 11kV Aerial Cable Kg Pengkalan Mau (partially) and Kg Kiudang (partially), Mukim Kiudang, Tutong
18 Wednesday, 25th November 2026 08:30 until work completed Kg Pengkalan Mau and Kg Kiudang, Mukim Kiudang, Tutong Replacement of 11kV Aerial Cable Kg Pengkalan Mau (partially) and Kg Kiudang (partially), Mukim Kiudang, Tutong
19 Thursday, 26th November 2026 08:30 until work completed Kg Pengkalan Mau and Kg Kiudang, Mukim Kiudang, Tutong Replacement of 11kV Aerial Cable Kg Pengkalan Mau (partially) and Kg Kiudang (partially), Mukim Kiudang, Tutong
20 Saturday, 28th November 2026 08:30 until work completed Kg Pengkalan Mau and Kg Kiudang, Mukim Kiudang, Tutong Replacement of 11kV Aerial Cable Kg Pengkalan Mau (partially) and Kg Kiudang (partially), Mukim Kiudang, Tutong
21 Monday, 30th November 2026 08:30 until work completed Kg Pengkalan Mau and Kg Kiudang, Mukim Kiudang, Tutong Replacement of 11kV Aerial Cable Kg Pengkalan Mau (partially) and Kg Kiudang (partially), Mukim Kiudang, Tutong
22 Wednesday, 4th November 2026 09:00 until 04:30 Kg Pengkalan Piasau, Mukim Ukong, Tutong Replacement of RMU Kg Pengkalan Piasau (partially), Mukim Ukong, Tutong
23 Thursday, 5th November 2026 09:00 until 04:30 Kg Ikas Bandung, Mukim Keriam, Tutong TX Maintenance Kg Ikas Bandung (partially), Mukim Keriam, Tutong
24 Wednesday, 11th November 2026 09:00 until 04:30 Kg Bukit, Mukim Ukong Tutong TX Maintenance Kg Bukit (partially), Mukim Ukong Tutong
25 Monday, 16th November 2026 08:30 until work completed Spg 142, 150, 158 and 162, Kg Luagan Timbaran, Mukim Kiudang, Tutong Replacement of 11kV Aerial Cable Spg 142, 150, 158 and 162, Kg Luagan Timbaran, Mukim Kiudang, Tutong.
26 Tuesday, 17th November 2026 08:30 until work completed Spg 142, 150, 158 and 162, Kg Luagan Timbaran, Mukim Kiudang, Tutong Replacement of 11kV Aerial Cable Spg 142, 150, 158 and 162, Kg Luagan Timbaran, Mukim Kiudang, Tutong.
27 Wednesday, 18th November 2026 08:30 until work completed Spg 142, 150, 158 and 162, Kg Luagan Timbaran, Mukim Kiudang, Tutong Replacement of 11kV Aerial Cable Spg 142, 150, 158 and 162, Kg Luagan Timbaran, Mukim Kiudang, Tutong.
28 Thursday, 19th November 2026 08:30 until work completed Spg 142, 150, 158 and 162, Kg Luagan Timbaran, Mukim Kiudang, Tutong Replacement of 11kV Aerial Cable Spg 142, 150, 158 and 162, Kg Luagan Timbaran, Mukim Kiudang, Tutong.
29 Saturday, 21st November 2026 08:30 until work completed Spg 142, 150, 158 and 162, Kg Luagan Timbaran, Mukim Kiudang, Tutong Replacement of 11kV Aerial Cable Spg 142, 150, 158 and 162, Kg Luagan Timbaran, Mukim Kiudang, Tutong.
30 Tuesday, 24th November 2026 08:30 until work completed Kg Birau, Mukim Kiudang, Tutong Replacement of 11kV Aerial Cable Kg Birau (partially), Mukim Kiudang, Tutong
31 Wednesday, 25th November 2026 08:30 until work completed Kg Birau, Mukim Kiudang, Tutong Replacement of 11kV Aerial Cable Kg Birau (partially), Mukim Kiudang, Tutong
32 Wednesday, 25th November 2026 09:00 to 16:30 Bangunan Masjid Hassanal Bolkiah, Tutong dan kawasan sekitarnya TX Maintenance Bangunan Masjid Hassanal Bolkiah, Tutong dan kawasan sekitarnya
33 Thursday, 26th November 2026 08:30 until work completed Kg Birau, Mukim Kiudang, Tutong Replacement of 11kV Aerial Cable Kg Birau (partially), Mukim Kiudang, Tutong
34 Saturday, 28th November 2026 08:30 until work completed Kg Birau, Mukim Kiudang, Tutong Replacement of 11kV Aerial Cable Kg Birau (partially), Mukim Kiudang, Tutong
35 Monday, 30th November 2026 08:30 until work completed Kg Padnunok and Kg Birau, Mukim Kiudang, Tutong Replacement of 11kV Aerial Cable Kg Padnunok (partially) and Kg Birau (partially), Mukim Kiudang, Tutong
36 Monday, 30th November 2026 08:30 until work completed Kg Kebia and Kg Pengkalan Mau, Mukim Kiudang, Tutong Replacement of 11kV Aerial Cable Kg Kebia (partially) and Kg Pengkalan Mau (partially), Mukim Kiudang, Tutong
37 Monday, 30th November 2026 08:30 until work completed Kg Batang Mitus, Mukim Kiudang, Tutong Replacement of 11kV Aerial Cable Kg Batang Mitus (partially), Mukim Kiudang, Tutong

 

DECEMBER 2026
Listed below are the designated areas for the planned maintenance work as for DECEMBER, 2026:
BILL DAY & DATE TIME LOCATION WORK DESCRIPTION AFFECTED AREAS OF OUTRAGE
1 Tuesday, 1st December 2026 08:30 until work completed Kg Padnunok and Kg Birau, Mukim Kiudang, Tutong Replacement of 11kV Aerial Cable Kg Padnunok (partially) and Kg Birau (partially), Mukim Kiudang, Tutong
2 Tuesday, 1st December 2026 08:30 until work completed Kg Kebia and Kg Pengkalan Mau, Mukim Kiudang, Tutong Replacement of 11kV Aerial Cable Kg Kebia (partially) and Kg Pengkalan Mau (partially), Mukim Kiudang, Tutong
3 Tuesday, 1st December 2026 08:30 until work completed Kg Batang Mitus, Mukim Kiudang, Tutong Replacement of 11kV Aerial Cable Kg Batang Mitus (partially), Mukim Kiudang, Tutong
4 Wednesday, 2nd December 2026 08:30 until work completed Kg Padnunok and Kg Birau, Mukim Kiudang, Tutong Replacement of 11kV Aerial Cable Kg Padnunok (partially) and Kg Birau (partially), Mukim Kiudang, Tutong
5 Wednesday, 2nd December 2026 08:30 until work completed Kg Kebia and Kg Pengkalan Mau, Mukim Kiudang, Tutong Replacement of 11kV Aerial Cable Kg Kebia (partially) and Kg Pengkalan Mau (partially), Mukim Kiudang, Tutong
6 Wednesday, 2nd December 2026 08:30 until work completed Kg Batang Mitus, Mukim Kiudang, Tutong Replacement of 11kV Aerial Cable Kg Batang Mitus (partially), Mukim Kiudang, Tutong
7 Thursday, 3rd December 2026 08:30 until work completed Kg Padnunok and Kg Birau, Mukim Kiudang, Tutong Replacement of 11kV Aerial Cable Kg Padnunok (partially) and Kg Birau (partially), Mukim Kiudang, Tutong
8 Thursday, 3rd December 2026 08:30 until work completed Kg Kebia and Kg Pengkalan Mau, Mukim Kiudang, Tutong Replacement of 11kV Aerial Cable Kg Kebia (partially) and Kg Pengkalan Mau (partially), Mukim Kiudang, Tutong
9 Thursday, 3rd December 2026 08:30 until work completed Kg Batang Mitus, Mukim Kiudang, Tutong Replacement of 11kV Aerial Cable Kg Batang Mitus (partially), Mukim Kiudang, Tutong
10 Saturday, 5th December 2026 08:30 until work completed Kg Padnunok and Kg Birau, Mukim Kiudang, Tutong Replacement of 11kV Aerial Cable Kg Padnunok (partially) and Kg Birau (partially), Mukim Kiudang, Tutong
11 Saturday, 5th December 2026 08:30 until work completed Kg Kebia and Kg Pengkalan Mau, Mukim Kiudang, Tutong Replacement of 11kV Aerial Cable Kg Kebia (partially) and Kg Pengkalan Mau (partially), Mukim Kiudang, Tutong
12 Saturday, 5th December 2026 08:30 until work completed Kg Batang Mitus, Mukim Kiudang, Tutong Replacement of 11kV Aerial Cable Kg Batang Mitus (partially), Mukim Kiudang, Tutong
13 Monday, 7th December 2026 08:30 until work completed Kg Padnunok and Kg Birau, Mukim Kiudang, Tutong Replacement of 11kV Aerial Cable Kg Padnunok (partially) and Kg Birau (partially), Mukim Kiudang, Tutong
14 Monday, 7th December 2026 08:30 until work completed Kg Kebia and Kg Pengkalan Mau, Mukim Kiudang, Tutong Replacement of 11kV Aerial Cable Kg Kebia (partially) and Kg Pengkalan Mau (partially), Mukim Kiudang, Tutong
15 Monday, 7th December 2026 08:30 until work completed Kg Batang Mitus, Mukim Kiudang, Tutong Replacement of 11kV Aerial Cable Kg Batang Mitus (partially), Mukim Kiudang, Tutong
16 Tuesday, 8th December 2026 08:30 until work completed Kg Padnunok and Kg Birau, Mukim Kiudang, Tutong Replacement of 11kV Aerial Cable Kg Padnunok (partially) and Kg Birau (partially), Mukim Kiudang, Tutong
17 Tuesday, 8th December 2026 08:30 until work completed Kg Kebia and Kg Pengkalan Mau, Mukim Kiudang, Tutong Replacement of 11kV Aerial Cable Kg Kebia (partially) and Kg Pengkalan Mau (partially), Mukim Kiudang, Tutong
18 Tuesday, 8th December 2026 08:30 until work completed Kg Batang Mitus, Mukim Kiudang, Tutong Replacement of 11kV Aerial Cable Kg Batang Mitus (partially), Mukim Kiudang, Tutong
19 Wednesday, 9th December 2026 08:30 until work completed Kg Padnunok and Kg Birau, Mukim Kiudang, Tutong Replacement of 11kV Aerial Cable Kg Padnunok (partially) and Kg Birau (partially), Mukim Kiudang, Tutong
20 Wednesday, 9th December 2026 08:30 until work completed Kg Kebia and Kg Pengkalan Mau, Mukim Kiudang, Tutong Replacement of 11kV Aerial Cable Kg Kebia (partially) and Kg Pengkalan Mau (partially), Mukim Kiudang, Tutong
21 Wednesday, 9th December 2026 08:30 until work completed Kg Batang Mitus, Mukim Kiudang, Tutong Replacement of 11kV Aerial Cable Kg Batang Mitus (partially), Mukim Kiudang, Tutong
22 Thursday, 10th December 2026 08:30 until work completed Kg Padnunok and Kg Birau, Mukim Kiudang, Tutong Replacement of 11kV Aerial Cable Kg Padnunok (partially) and Kg Birau (partially), Mukim Kiudang, Tutong
23 Thursday, 10th December 2026 08:30 until work completed Kg Kebia and Kg Pengkalan Mau, Mukim Kiudang, Tutong Replacement of 11kV Aerial Cable Kg Kebia (partially) and Kg Pengkalan Mau (partially), Mukim Kiudang, Tutong
24 Thursday, 10th December 2026 08:30 until work completed Kg Batang Mitus, Mukim Kiudang, Tutong Replacement of 11kV Aerial Cable Kg Batang Mitus (partially), Mukim Kiudang, Tutong
25 Saturday, 12th December 2026 08:30 until work completed Kg Padnunok and Kg Birau, Mukim Kiudang, Tutong Replacement of 11kV Aerial Cable Kg Padnunok (partially) and Kg Birau (partially), Mukim Kiudang, Tutong
26 Saturday, 12th December 2026 08:30 until work completed Kg Kebia and Kg Pengkalan Mau, Mukim Kiudang, Tutong Replacement of 11kV Aerial Cable Kg Kebia (partially) and Kg Pengkalan Mau (partially), Mukim Kiudang, Tutong
27 Saturday, 12th December 2026 08:30 until work completed Kg Batang Mitus, Mukim Kiudang, Tutong Replacement of 11kV Aerial Cable Kg Batang Mitus (partially), Mukim Kiudang, Tutong
28 Monday, 14th December 2026 08:30 until work completed Kg Padnunok and Kg Birau, Mukim Kiudang, Tutong Replacement of 11kV Aerial Cable Kg Padnunok (partially) and Kg Birau (partially), Mukim Kiudang, Tutong
29 Monday, 14th December 2026 08:30 until work completed Kg Kebia and Kg Pengkalan Mau, Mukim Kiudang, Tutong Replacement of 11kV Aerial Cable Kg Kebia (partially) and Kg Pengkalan Mau (partially), Mukim Kiudang, Tutong
30 Monday, 14th December 2026 08:30 until work completed Kg Batang Mitus, Mukim Kiudang, Tutong Replacement of 11kV Aerial Cable Kg Batang Mitus (partially), Mukim Kiudang, Tutong
31 Tuesday, 15th December 2026 08:30 until work completed Kg Padnunok and Kg Birau, Mukim Kiudang, Tutong Replacement of 11kV Aerial Cable Kg Padnunok (partially) and Kg Birau (partially), Mukim Kiudang, Tutong
32 Tuesday, 15th December 2026 08:30 until work completed Kg Kebia and Kg Pengkalan Mau, Mukim Kiudang, Tutong Replacement of 11kV Aerial Cable Kg Kebia (partially) and Kg Pengkalan Mau (partially), Mukim Kiudang, Tutong
33 Tuesday, 15th December 2026 08:30 until work completed Kg Batang Mitus, Mukim Kiudang, Tutong Replacement of 11kV Aerial Cable Kg Batang Mitus (partially), Mukim Kiudang, Tutong
34 Wednesday, 16th December 2026 08:30 until work completed Kg Padnunok and Kg Birau, Mukim Kiudang, Tutong Replacement of 11kV Aerial Cable Kg Padnunok (partially) and Kg Birau (partially), Mukim Kiudang, Tutong
35 Wednesday, 16th December 2026 08:30 until work completed Kg Kebia and Kg Pengkalan Mau, Mukim Kiudang, Tutong Replacement of 11kV Aerial Cable Kg Kebia (partially) and Kg Pengkalan Mau (partially), Mukim Kiudang, Tutong
36 Wednesday, 16th December 2026 08:30 until work completed Kg Batang Mitus, Mukim Kiudang, Tutong Replacement of 11kV Aerial Cable Kg Batang Mitus (partially), Mukim Kiudang, Tutong
37 Thursday, 17th December 2026 08:30 until work completed Kg Padnunok and Kg Birau, Mukim Kiudang, Tutong Replacement of 11kV Aerial Cable Kg Padnunok (partially) and Kg Birau (partially), Mukim Kiudang, Tutong
38 Thursday, 17th December 2026 08:30 until work completed Kg Kebia and Kg Pengkalan Mau, Mukim Kiudang, Tutong Replacement of 11kV Aerial Cable Kg Kebia (partially) and Kg Pengkalan Mau (partially), Mukim Kiudang, Tutong
39 Thursday, 17th December 2026 08:30 until work completed Kg Batang Mitus, Mukim Kiudang, Tutong Replacement of 11kV Aerial Cable Kg Batang Mitus (partially), Mukim Kiudang, Tutong
40 Saturday, 19th December 2026 08:30 until work completed Kg Padnunok and Kg Birau, Mukim Kiudang, Tutong Replacement of 11kV Aerial Cable Kg Padnunok (partially) and Kg Birau (partially), Mukim Kiudang, Tutong
41 Saturday, 19th December 2026 08:30 until work completed Kg Kebia and Kg Pengkalan Mau, Mukim Kiudang, Tutong Replacement of 11kV Aerial Cable Kg Kebia (partially) and Kg Pengkalan Mau (partially), Mukim Kiudang, Tutong
42 Saturday, 19th December 2026 08:30 until work completed Kg Batang Mitus, Mukim Kiudang, Tutong Replacement of 11kV Aerial Cable Kg Batang Mitus (partially), Mukim Kiudang, Tutong
43 Monday, 21st December 2026 08:30 until work completed Kg Kebia and Kg Pengkalan Mau, Mukim Kiudang, Tutong Replacement of 11kV Aerial Cable Kg Kebia (partially) and Kg Pengkalan Mau (partially), Mukim Kiudang, Tutong
44 Monday, 21st December 2026 08:30 until work completed Kg Batang Mitus, Mukim Kiudang, Tutong Replacement of 11kV Aerial Cable Kg Batang Mitus (partially), Mukim Kiudang, Tutong
45 Tuesday, 22nd December 2026 08:30 until work completed Kg Kebia and Kg Pengkalan Mau, Mukim Kiudang, Tutong Replacement of 11kV Aerial Cable Kg Kebia (partially) and Kg Pengkalan Mau (partially), Mukim Kiudang, Tutong
46 Tuesday, 22nd December 2026 08:30 until work completed Kg Batang Mitus, Mukim Kiudang, Tutong Replacement of 11kV Aerial Cable Kg Batang Mitus (partially), Mukim Kiudang, Tutong
47 Wednesday, 23rd December 2026 08:30 until work completed Kg Kebia and Kg Pengkalan Mau, Mukim Kiudang, Tutong Replacement of 11kV Aerial Cable Kg Kebia (partially) and Kg Pengkalan Mau (partially), Mukim Kiudang, Tutong
48 Wednesday, 23rd December 2026 08:30 until work completed Kg Batang Mitus, Mukim Kiudang, Tutong Replacement of 11kV Aerial Cable Kg Batang Mitus (partially), Mukim Kiudang, Tutong
49 Thursday, 24th December 2026 08:30 until work completed Kg Kebia and Kg Pengkalan Mau, Mukim Kiudang, Tutong Replacement of 11kV Aerial Cable Kg Kebia (partially) and Kg Pengkalan Mau (partially), Mukim Kiudang, Tutong
50 Thursday, 24th December 2026 08:30 until work completed Kg Batang Mitus, Mukim Kiudang, Tutong Replacement of 11kV Aerial Cable Kg Batang Mitus (partially), Mukim Kiudang, Tutong
51 Saturday, 26th December 2026 08:30 until work completed Kg Kebia and Kg Pengkalan Mau, Mukim Kiudang, Tutong Replacement of 11kV Aerial Cable Kg Kebia (partially) and Kg Pengkalan Mau (partially), Mukim Kiudang, Tutong
52 Saturday, 26th December 2026 08:30 until work completed Kg Batang Mitus, Mukim Kiudang, Tutong Replacement of 11kV Aerial Cable Kg Batang Mitus (partially), Mukim Kiudang, Tutong
53 Monday, 28th December 2026 08:30 until work completed Kg Kebia and Kg Pengkalan Mau, Mukim Kiudang, Tutong Replacement of 11kV Aerial Cable Kg Kebia (partially) and Kg Pengkalan Mau (partially), Mukim Kiudang, Tutong
54 Monday, 28th December 2026 08:30 until work completed Kg Batang Mitus, Mukim Kiudang, Tutong Replacement of 11kV Aerial Cable Kg Batang Mitus (partially), Mukim Kiudang, Tutong
55 Tuesday, 29th December 2026 08:30 until work completed Kg Kebia and Kg Pengkalan Mau, Mukim Kiudang, Tutong Replacement of 11kV Aerial Cable Kg Kebia (partially) and Kg Pengkalan Mau (partially), Mukim Kiudang, Tutong
56 Tuesday, 29th December 2026 08:30 until work completed Kg Batang Mitus, Mukim Kiudang, Tutong Replacement of 11kV Aerial Cable Kg Batang Mitus (partially), Mukim Kiudang, Tutong
57 Wednesday, 30th December 2026 08:30 until work completed Kg Kebia and Kg Pengkalan Mau, Mukim Kiudang, Tutong Replacement of 11kV Aerial Cable Kg Kebia (partially) and Kg Pengkalan Mau (partially), Mukim Kiudang, Tutong
58 Wednesday, 30th December 2026 08:30 until work completed Kg Batang Mitus, Mukim Kiudang, Tutong Replacement of 11kV Aerial Cable Kg Batang Mitus (partially), Mukim Kiudang, Tutong
59 Thursday, 31st December 2026 08:30 until work completed Kg Kebia and Kg Pengkalan Mau, Mukim Kiudang, Tutong Replacement of 11kV Aerial Cable Kg Kebia (partially) and Kg Pengkalan Mau (partially), Mukim Kiudang, Tutong
60 Thursday, 31st December 2026 08:30 until work completed Kg Batang Mitus, Mukim Kiudang, Tutong Replacement of 11kV Aerial Cable Kg Batang Mitus (partially), Mukim Kiudang, Tutong

 

BELAIT DISTRICT

SEPTEMBER 2026
Listed below are the designated areas for the planned maintenance work as for SEPTEMBER, 2026:
Bill Day & Date Time Location Work Description Affected Areas for Outages
1 Tuesday, 01st September 2026

08:00 am to 05:00 pm

(Interruption of supply is about 5 mins i.e during load transfer)

MIS Seri Maharaja Maintenance of 11kV Switchgear KB Sentral Shopping Centre, housing areas at Jalan Dermawangsa, Jalan Laila Bentara, part of Jalan Dipa Negara, part of STKRJ Kg Mumong and The Reach Apartment
2 Tuesday, 01st September 2026

08:30 am to 12:00 noon

01:30 pm to 04:30 pm

Kampung Sungai Kuru Maintenance of street light Kampung Sungai Kuru and the surrounding areas
3 Wednesday, 02nd September 2026

08:30 am to 12:00 noon

01:30 pm to 04:30 pm

Kampung Sungai Kuru Maintenance of street light Kampung Sungai Kuru and the surrounding areas
4 Thursday, 03rd September 2026

08:30 am to 12:00 noon

01:30 pm to 04:30 pm

Kampung Sungai Kuru Maintenance of street light Kampung Sungai Kuru and the surrounding areas
5 Thursday, 10th September 2026

08:30 am to 12:15 noon

02:00 pm to 04:00 pm

Sg. Bakong & Lumut Tersusun Maintenance of Low Voltage Overhead Cable

Jalan Kecil Sg. Bakong Lumut

Spg 217 Sg Bakong and surrounding areas

Nimanja Lumut Store, Al-Muhamadiyah Enterprise Supermarket and surrounding areas

Spg 638, Spg 638-40, Spg 638-34, Spg 638-28 Lumut Tersusn and surrounding areas

6 Saturday, 12th September 2026

08:30 am to 12:15 noon

02:00 pm to 04:00 pm

Sg. Bakong & Lumut Tersusun Maintenance of Low Voltage Overhead Cable

Jalan Kecil Sg. Bakong Lumut

Spg 217 Sg Bakong and surrounding areas

Nimanja Lumut Store, Al-Muhamadiyah Enterprise Supermarket and surrounding areas

Spg 638, Spg 638-40, Spg 638-34, Spg 638-28 Lumut Tersusun and surrounding areas

7 Sunday, 13th September 2026 08:30 am until works completed S/S Jalan Lorong Bolkiah Seria Replacement of Sub-Distribution Feeder Pillar Seria Municipal Department, Information Department, Seria Library, barrack Jalan Bolkiah, Spg 3, Spg 7 and Spg 13 Jalan Bolkiah Seria and surrounding areas
8 Monday, 21st September 2026

08:00 am to 12:00 noon

01:30 pm to 04:30 pm

Sungai Kuru Maintenance of Street Light Kampong Sungai Kuru and its surrounding areas
9 Monday, 21st September 2026

08:30 am to 12:15 noon

01:30 pm to 04:30 pm

Kampong Rampayoh Replacement of Low Voltage Overhead Part of Jalan Utama Rampayoh, Jalan Rampayoh (Mobil), Sekolah Rendah Rampayoh, Jalan Kecil Telingan Rampayoh Timur (Coffee Farm) and its Surrounding areas
10 Tuesday, 22nd September 2026

08:00 am to 12:00 noon

01:30 pm to 04:30 pm

Sungai Kuru Maintenance of Street Light Kampong Sungai Kuru and its surrounding areas
11 Tuesday, 22nd September 2026

08:30 am to 12:15 noon

01:30 pm to 04:30 pm

Kampong Rampayoh Replacement of Low Voltage Overhead Part of Jalan Utama Rampayoh, Jalan Rampayoh (Mobil), Sekolah Rendah Rampayoh, Jalan Kecil Telingan Rampayoh Timur (Coffee Farm) and its Surrounding areas
12 Wednesday, 23rd September 2026

08:30 am to 12:15 noon

01:30 pm to 04:30 pm

Kampong Rampayoh Replacement of Low Voltage Overhead Part of Jalan Utama Rampayoh, Jalan Rampayoh (Mobil), Sekolah Rendah Rampayoh, Jalan Kecil Telingan Rampayoh Timur (Coffee Farm) and its Surrounding areas
13 Thursday 24th September 2026

08:30 am to 12:15 noon

01:30 pm to 04:30 pm

Kampong Rampayoh Replacement of Low Voltage Overhead Part of Jalan Utama Rampayoh, Jalan Rampayoh (Mobil), Sekolah Rendah Rampayoh, Jalan Kecil Telingan Rampayoh Timur (Coffee Farm) and its Surrounding areas
14 Friday, 25th September 2026 08:30 am to 04:30 pm Kampung Sungai Teraban, Kuala Belait Wayleave Clearing Kampung Sungai Teraban ( Spg.57, Spg.60, Spg.60-30 ) and its surrounding areas
15 Sunday, 27th September 2026 08:30 until works completed Seria Replacement of Distribution Feeder Pillar Bangunan Kerajaan Pejabat Pos Seria, Balai Polis Seria, Barek Balai Polis Seria, Jalan Raja Isteri, Flat Jalan Raja isteri, Jalan Awang Semaun, Jalan Perakong, Jalan Sultan, Jalan Jerambak Pekan Seria and its surrounding areas
16 Monday, 28th September 2026

08:30 until works completed

(Interruption of supply is about 5-15 mins i.e during load transfer)

Kampong Sungai Petai Transformer Maintenance Simpang 489, Jalan Sungai Petai and its surrounding areas

 

OCTOBER 2026
Listed below are the designated areas for the planned maintenance work as for OCTOBER, 2026:
Bill Day & Date Time Location Work Description Affected Areas for Outages
1 Wednesday, 07th October 2026

08:30 am until works completed

(For info, Department of Electrical Services will supply temporary electricity to the affected areas through mobile generator services at the substation)

S/S Kg Baru ERM Maintenance of Transformer Part of Simpang 94 Kg Baru including the surrounding areas
2 Monday, 12th October 2026

08:30 am to 12:15 noon

01:30 pm to 04:30 pm

Labi Replacement of Low Voltage Overhead Cable and 28ft/35ft poles Jalan Tenajor, Tapang Lupak, UNN Tower and the surrounding areas
3 Tuesday, 13th October 2026

08:30 am to 12:15 noon

01:30 pm to 04:30 pm

Labi Replacement of Low Voltage Overhead Cable and 28ft/35ft poles Jalan Tenajor, Tapang Lupak, UNN Tower and the surrounding areas
4 Wednesday, 14th October 2026

08:30 am to 12:15 noon

01:30 pm to 04:30 pm

Labi Replacement of Low Voltage Overhead Cable and 28ft/35ft poles Jalan Tenajor, Tapang Lupak, UNN Tower and the surrounding areas
5 Thursday, 15th October 2026

08:00 am to 12:00 noon

01:30 pm to 04:30 pm

Sg Bakong Selatan Maintenance of Street lights Sg Bakong Selatan
6 Thursday, 15th October 2026

08:30 am to 12:15 noon

01:30 pm to 04:30 pm

Labi Replacement of Low Voltage Overhead Cable and 28ft/35ft poles Jalan Tenajor, Tapang Lupak, UNN Tower and the surrounding areas
7 Saturday, 17th October 2026

08:30 am to 12:15 noon

01:30 pm to 04:30 pm

Labi Replacement of Low Voltage Overhead Cable and 28ft/35ft poles Jalan Tenajor, Tapang Lupak, UNN Tower and the surrounding areas
8 Sunday, 18th October 2026

08:00 am to 05:30 pm

(For info, Department of Electrical Services will supply temporary electricity to the affected areas through mobile generator services at the substation)

S/S Workshop Bandaran Replacement of Transformer Municipal Department, Lot 4004, Lot 4005, part of Jalan Lorong Setia Diraja. part of Jalan Setia Diraja Spg 36 and the surrounding areas
9 Monday, 19th October 2026 08:30 am to 04:30 pm Labi Replacement of Low Voltage Overhead Cable and 28ft/35ft poles Jalan Tenajor, Tapang Lupak, UNN Tower and the surrounding areas
10 Tuesday, 20th October 2026 08:30 am to 04:30 pm Labi Replacement of Low Voltage Overhead Cable and 28ft/35ft poles Jalan Tenajor, Tapang Lupak, UNN Tower and the surrounding areas
11 Wednesday, 21st October 2026 08:00 am to 05:30 pm Spg 426 Jalan Maulana Replacement of Distribution Feeder Pillar Spg 426, Spg 430 and Spg 436 Jalan Maulana and the surrounding areas
12 Wednesday, 21st October 2026 08:30 am to 04:30 pm Labi Replacement of Low Voltage Overhead Cable and 28ft/35ft poles Jalan Tenajor, Tapang Lupak, UNN Tower and the surrounding areas
13 Thursday, 22nd October 2026 08:30 am to 04:30 pm Labi Replacement of Low Voltage Overhead Cable and 28ft/35ft poles Jalan Tenajor, Tapang Lupak, UNN Tower and the surrounding areas
14 Saturday, 24th October 2026 08:30 am until works completed S/S ERM Pekan Seria Replacement of Distribution Feeder Pillar Pekan Seria areas, Jalan Bunga Mawar, Jalan Bunga Pinang, Jalan Raja Puteri, KPPM Filling Station, JKR Pump and the surrounding areas
15 Thursday, 29th October 2026 08:30 am until works completed S/S Perumahan Buruh Seria Replacement of Distribution Feeder Pillar Barrack Jalan Lorong Tiga Spg 198, Spg 198-62 and the surrounding areas

 

NOVEMBER 2026
Listed below are the designated areas for the planned maintenance work as for NOVEMBER, 2026:
Bill Day & Date Time Location Work Description Affected Areas for Outages
1 Tuesday, 17th November 2026

08:30 am to 12:15 noon

01:30 pm to 04:30 pm

Jalan Lumut Tersusun Replacement of Low Voltage Overhead Cable Part of Jalan Lumut Tersusun Spg 639-46,    Spg 638-46-43 and surrounding areas
2 Wednesday, 18th November 2026

08:30 am to 12:15 noon

01:30 pm to 04:30 pm

Jalan Lumut Tersusun Replacement of Low Voltage Overhead Cable Part of Jalan Lumut Tersusun Spg 639-46,    Spg 638-46-43 and surrounding areas
3 Thursday, 19th November 2026

08:30 am to 12:15 noon

01:30 pm to 04:30 pm

Jalan Lumut Tersusun Replacement of Low Voltage Overhead Cable Part of Jalan Lumut Tersusun Spg 639-46,    Spg 638-46-43 and surrounding areas

 

DECEMBER 2026
Listed below are the designated areas for the planned maintenance work as for DECEMBER, 2026:
Bill Day & Date Time Location Work Description Affected Areas for Outages
1 Saturday, 05th December 2026 08:30 am until works completed S/S Perumahan Buruh Seria Replacement of Distribution Feeder Pillar Pengiran Setia Negara Pg. Hj. Mohd. Yusof Primary School, Barracks at Spg 198 and Spg 198-62 Jalan Lorong Tiga Seria and surrounding area

 

TEMBURONG DISTRICT

SEPTEMBER 2026
Listed below are the designated areas for the planned maintenance work as for SEPTEMBER, 2026:
Bill
Day & Date
Time
Location
Work Description
Affected Areas for Outages
1
Tuesday, 1st September 2026 8.30 am until 3.00 pm Kg Lepong Lama Wayleave Maintenance A part of Kg Lepong Lama and the surrounding area
2
Wednesday, 2nd September 2026 8.30 am until 3.00 pm Kg Lepong Lama Wayleave Maintenance A part of Kg Lepong Lama and the surrounding area
3
Thursday, 3rd September 2026 8.30 am until 3.00 pm Kg Parit Wayleave Maintenance A part of Kg Parit, Spg 1062 and the surrounding area
4
Saturday, 19th September 2026 8.30 am until 4.30 pm Kg Batang Duri Wayleave Maintenance A part of Kg Batang Duri and the surrounding area
5
Tuesday, 29th September 2026 8.30 am until 4.00 pm Kg Parit Lama Wayleave Maintenance A part of Kg Parit Lama, Spg 913 and the surrounding area

 

OCTOBER 2026
Listed below are the designated areas for the planned maintenance work as for OCTOBER, 2026:
Bill
Day & Date
Time
Location
Work Description
Affected Areas for Outages
1
Thursday, 8th October 2026 8.30 am until 4.00 pm Kg Amo Wayleave Maintenance A part of Kg Amo and the surrounding area
2
Friday, 9th October 2026 8.30 am until 11.00 am and 2.00 pm until 5.00 pm Kg Amo Wayleave Maintenance A part of Kg Amo and the surrounding area
3
Saturday, 10th October 2026 8.30 am until 3.00 pm Kg Bokok Wayleave Maintenance A part of Kg Bokok and the surrounding area
4
Monday, 12th October 2026 8.30 am until 4.00 pm Kg Bangbulan, Kg Lagau and Kg Belingus Wayleave Maintenance A part of Kg Bangbulan, Kg Lagau, Kg Belingus and the surrounding area
5
Tuesday, 13th Ocotber 2026 8.30 am until 3.00 pm Kg Selangan and Kg Parit Wayleave Maintenance A part of Kg Selangan, Kg Parit and the surrounding area
6
Friday, 23rd October 2026 8.00 am until 11.30 am and 2.00 pm until 5.00 Kg Amo Wayleave Maintenance A part of Kg Amo and the surrounding area
7
Saturday, 24th October 2026 8.30 am until 3.30 pm Kg Sibulu and Kg Rataie Wayleave Maintenance A part of Kg Sibulu, Kg Rataie and the surrounding area
8
Wednesday, 28th October 2026 8:00 am until 9:00 am and 4:00 pm until 5:00 pm OSS Pejabat Lama Replacement of Ring Main Unit Flat Guru-guru, Barek Daerah, KDN, NARKOTIK, Jabatan Pemeliharaan Bahagian Kenderaan and surrounding area
9
Thursday, 29th October 2026 8:00 am until 9:00 am and 4:00 pm until 5:00 pm OSS Bomba Bangar Replacement of Ring Main Unit Bomba Bangar, Barek Bomba Bangar, Sekolah Sultan Hassan Bangar, Jabatan Sekolah-sekolah and surrounding area
10
Saturday, 31st October 2026 8:00 am until 9:00 am and 4:00 pm until 5:00 pm OSS Kg Menengah Replacement of Ring Main Unit A part of Kg Menengah and surrounding area

 

NOVEMBER 2026
Listed below are the designated areas for the planned maintenance work as for NOVEMBER, 2026:
1
Monday, 2nd November 2026 8:00 am until 9:00 am and 4:00 pm until 5:00 pm OSS Belayang Replacement of Ring Main Unit A part of Kg Belayang and the surrounding area
2
Tuesday, 3rd November 2026 8:00 am until 9:00 am and 4:00 pm until 5:00 pm OSS Puni A Replacement of Ring Main Unit A part of Kg Puni A and the surrounding area
3
Wednesday, 4th November 2026 8:00 am until 9:00 am and 4:00 pm until 5:00 pm OSS Paya Bagangan Replacement of Ring Main Unit A part of Kg Paya Bagangan and the surrounding area
4
Wednesday, 4th November 2026 8:00 am until 9:00 am and 4:00 pm until 5:00 pm OSS Kg Belais Replacement of Ring Main Unit A part of Kg Belais and the surrounding area
5
Thursday, 5th November 2026 8:00 am until 9:00 am and 4:00 pm until 5:00 pm OSS Kg Kenua Replacement of Ring Main Unit A part of Kg Kenua and the surrounding area
6
Thursday, 5th November 2026 8:00 am until 9:00 am and 4:00 pm until 5:00 pm OSS Skim Tanah Kurnia Rakyat Jati Kg Rataie Replacement of Ring Main Unit A part of Skim Tanah Kurnia Rakyat Jati Kg Rataie and the surrounding area
7
Saturday, 7th November 2026 8:00 am until 9:00 am and 4:00 pm until 5:00 pm OSS Paya Bangangan Replacement of Ring Main Unit A part of Kg Paya Bagangan and the surrounding area
8
Monday, 9th November 2026 8.30 am until 3.30 pm Kg Sumbiling Lama and Kg Sumbiling Baru Wayleave A part of Kg Sumbiling Lama, Kg Sumbiling Baru and the surrounding area
9
Monday, 9th November 2026 8:00 am until 9:00 am and 4:00 pm until 5:00 pm OSS Kg Rataie 3 Replacement of Ring Main Unit A part of Kg Rataie and the surrounding area
10
Tuesday, 10th November 2026 8:00 am until 9:00 am and 4:00 pm until 5:00 pm OSS Kg Parit Lama Replacement of Ring Main Unit A part of Kg Parit Lama and the surrounding area
11
Wednesday, 11th November 2026 8:00 am until 9:00 am and 4:00 pm until 5:00 pm OSS Kg Kinalong Replacement of Ring Main Unit A part of Kg Kinalong and the surrounding area
12
Thursday, 12th November 2026 8:00 am until 9:00 am and 4:00 pm until 5:00 pm OSS Kg Rataie 3 Replacement of Ring Main Unit  A part of Kg Rataie and the surrounding area
13
Tuesday, 10th November 2026 8.30 am until 3.30 pm OSS Kg Senukoh Wayleave A part of Kg Senukoh and the surrounding area
14
Saturday, 14th November 2026 8.30 am until 3.30 pm OSS Kg Batang Tuau Wayleave A part of Kg Batang Tuau and the surrounding area
15
Monday, 16th November 2026 8.30 am until 3.30 pm OSS Kg Menengah Wayleave A part of Kg Menengah and the surrounding area
16
Friday, 20th November 2026 8.00 am until 11.30 am and 2.00 pm until 5.00 pm Kg Belayang Wayleave A part of Kg Belayang, Pai Yuek School and the surrounding area
17
Monday, 23rd November 2023 8.30 am until 12.00 pm Kg Menengah Replacement Cabel ABC Low Voltage A part of Kg Menengah, Spg 89 and the surrounding area